vulcan product fan Posted September 20, 2019 Share Posted September 20, 2019 After New Whitt went because of the house rebuild i needed new space for a layout we went for a garden room so i got a small 8 x 4 foot workshop on the side . i have started to make the base board for the layout it will be end to end with the baseboard measuring 7 x 2 foot . will post more picture as i progress . 1 1 Link to post Share on other sites More sharing options...
vulcan product fan Posted September 25, 2019 Author Share Posted September 25, 2019 (edited) So wood work is well on well to being completed its going to be a small TMD with a passing branch line . It will be set in the late 80s early 90s . Edited September 26, 2019 by vulcan product fan 3 Link to post Share on other sites More sharing options...
Iron Horse Posted September 25, 2019 Share Posted September 25, 2019 Good to see you back 1 Link to post Share on other sites More sharing options...
vulcan product fan Posted September 26, 2019 Author Share Posted September 26, 2019 Thanks mate slow progress at the moment i just want to by stock Link to post Share on other sites More sharing options...
Iron Horse Posted September 26, 2019 Share Posted September 26, 2019 I always want to buy stock 1 Link to post Share on other sites More sharing options...
vulcan product fan Posted October 7, 2019 Author Share Posted October 7, 2019 (edited) Small update started to paint frame and backboard, laid track and started wiring Track is peco streamline with a mix of wood and concrete sleepers with a cork underlay. Thanks for looking . Edited October 7, 2019 by vulcan product fan Link to post Share on other sites More sharing options...
vulcan product fan Posted November 6, 2019 Author Share Posted November 6, 2019 (edited) Hi just had to share this the latest addition to the fleet its been resprayed and weathered by Bens resprays . what a great job. (sorry its a bit blurred ) Edited November 6, 2019 by vulcan product fan poor photograph 1 Link to post Share on other sites More sharing options...
vulcan product fan Posted November 6, 2019 Author Share Posted November 6, 2019 A Few photos of the very slow progress on the layout the 4 sidings are wired and ballasting has started the track to the right is going to be the program track but look like a passing main line that leads into a tunnel. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now