Jump to content

Andrew P

Cadley Hill (Now owned by Peter BB) see Page 5

Recommended Posts

Well guys, layout now in my Engine Shed as a friend called it and the name has stuck.  Andy wants to do another 'Cadley Hill' so the name will change unless he has given a new name to his.  Thanks to Gaugemaster, who sorted my Prodigy out f.o.c., I have, using two former Swad Lane trestles, had a welcome running session.  How I progress is at yet unknown and having made space for it whatever track was left down of Rothleigh is now covered in plywood for the foreseeable future.  

Many many years ago I was fortunate enough to visit the pit at Cadley Hill and the low ceiling level of the seam is a permanent memory but also remember that you could see the now dismantled cooling towers so the background may sort itself.  If I like what happens I will keep you posted then hopefully will show it.   Cheers, Peter

  • Like 3

Share this post


Link to post
Share on other sites

Cheers Peter, I hope you enjoy Cadley Hill, I will be choosing a new name for my project so you can keep this going with many updates I hope.

 

We'll have a chat when I'm back from Wales.:good:

  • Like 1
  • Friendly/supportive 1

Share this post


Link to post
Share on other sites
Posted (edited)

Had a brainwave the other night so found a couple of lengths from a former layout, tacked them to the back and then modified the track so that the 5th line looked as if it might belong (see Andy's original track plan - in practice it changed and now changed again).

 

Added a point and a bit of a curve so potentially can place an 08 in the shunt.  The difficult bit will be sorting out the scenery as the wiring, track and points all work (slight hitch as the concrete track is not Peco 100 and mine is).  Had to cut some of the hinge support away to allow a larger locomotive to run through.

 

Please do not look at the background although I have now indexed (took a few days) 200 Chinese take away plastic boxes there is still a lot to be tidied up.  The indexing has paid off already - in earlier times I had to go through all the boxes to find the 'correct' one now they all have numbers so look up, locate, use, or at present add something else fitting the description into the box.  May also add the Gunbox N-gauge layout also recently built now I have been able to access (famous last words?).

 

Cadley_Hill_Modified_TP_200618.jpg.4dcfb319b9ba26dedc9f4ae580c25e50.jpg

Edited by PeterBB
Correcting typos
  • Like 6
  • Craftsmanship/clever 1

Share this post


Link to post
Share on other sites

Excellent addition Peter, looking very good mate.:good:

  • Thanks 1

Share this post


Link to post
Share on other sites
Posted (edited)

Hi Guys,

Fooled myself looking at the above picture as the new photographs ar taken from the other end.  Right well, not happy with the space available for the scenery at the back so replaced the 'added' bit with 3" but with no 12 mm had to use two X 6mm - a bit of wood and the rest from MDF - as I have made it a 'rule' that everything that goes into making this layout must come from stuff already available. I had thoughts on renaming as it would not look anything like  Cadley Hill and had painted some wood blue last night as this was going to be the background ... You will therefore notice the 'hotch patch' on the left.  Looking around I found some Celotex and decided to try it out.  It will work but will need a support.

 

I found a bridge and looked to see if it would fit - yes but not where it was actually wanted viz. at the hinge - so planned it in.  Scenery will have to adjust to allow for the hinge. While it will be fictitious it will remind me of CAdley Hill as I then added the hilly land around and the bridge could just be the A444 that actually does go over the top of part of the former mine working area. So the second picture is where these two items will be.

 

That means the hinges are visible so now to find a way to hide them ... tomorrow?

 

The pictures have come out in the wrong order!

 

IMG_0542.jpg.050190287bcd90e957c1421799305c27.jpg

 

IMG_0541.jpg.fe45ec61b0db3eb50f195318273ca046.jpg

Edited by PeterBB
Picture order is the reverse of blog entry.
  • Like 7
  • Craftsmanship/clever 1

Share this post


Link to post
Share on other sites

Lots of cleaver work going on here Peter, I only called it CH as it was local to home in a previous life, and I liked the name. It never had a Station to my knowledge so all was Rule#1 Modellers Licence.

 

Keep up the good work and stay safe my friend.:good:

  • Thanks 1

Share this post


Link to post
Share on other sites
Posted (edited)

I have had ideas of a name change  e.g. Neverhill.

 

Today I concentrated on 'doing something' to hide the hinges ... and of course had to account for the bit of hinge support that had to be removed to allow longer locomotives to pass in the fiddle yard  that will likely always be seen. Modifications are necessary to make them look good but a bit of luck with some 'weathered wood' has helped.  An old gatepost top - it is surprising what can be hoarded although to be fair it was to be used as a template for a replacement.

 

The hills need support so that was the secondary function and the 'added' bit now has 6mm wood 6mm MDF bits a bit if square wood to hold the initial addition and now a space piece of wood and then a block screwed into it X 5 to enable a piece of hardboard kept from a pre 1975 N-gauge layout the was run on a coffee table to be at last reutilised (the modern word is recycled).  The good news is that it is fun trying to work it all out.

 

The hinge coverers:

 

 

IMG_0543.jpgNow to look up topics that I follow before yet again it suddenly stops me 'ticking' or adding comments.

Edited by PeterBB
To avoid losing the above.
  • Like 7

Share this post


Link to post
Share on other sites

No photographs todaytgrying to put the fixed part of the back scene support up and glue the foam to it.  The intension was to use foam to stick it in and fill-in all the gaps ... the foam did not work so half a tin wasted.  (Just a query - if it is solid in the tube u=into the can is it practical to drill down to clear it or in reality are these things once used impossible to really use gain even after the acetone clean-up when last used).

 

Also managed to get a big splinter in my thumb that slowed things up a bit plus bit of plaster was used to help seal the gaps.  We will see if anything comes of it tomorrow morning ... wish I had not decided to only use what is available - my 5L can of PVA is at the club.  Thanks to those of you currently looking in.

  • Friendly/supportive 2

Share this post


Link to post
Share on other sites

Can you not go to the Club and collect the PVA Peter? I'm sure it needs a quick security check mate.:good:

  • Like 1

Share this post


Link to post
Share on other sites
On 24/06/2020 at 20:59, Andrew P said:

Can you not go to the Club and collect the PVA Peter? I'm sure it needs a quick security check mate.:good:

Sorted by other means.

Frustrating day otherwise foam would have done the job in 'seconds' (we do speed up time in model railway terms), while the plaster has still not hardened probably because it was too wet.

  • Friendly/supportive 2

Share this post


Link to post
Share on other sites

Hi Guys,

 

Update from a better day.  Have completed the 'hinge covers'  and SWMBO said that she couldn't see them ... I had also painted the cable clips black to visually help the 'deception'.  The front one took a lot longer to work out than the far one with the cut off corner - looking for old window pictures on the web and even then modifying it to become a double window.  There are doors on the other sides.

 

The second picture is how it is this evening.  The plaster dried and hardened overnight so today tried to cut out 'the join and bits of plaster fell off so before redoing inserted a folded sheet of PVC in the gap and remastered the area to the bridge.  It would have been nice if the bridge had been possible to place beyond the folding 'arc' but there was not enough room so it plus bit of hill scenery will have to be come and added item on set-up.

 

Later sanded and painted the far hills with forest green fence paint as a basis and to show up irregularities ... some more work on it will be required tomorrow plus, hopefully, to be able to separate the bridge area cleanly.

 

NB The U-area in the background is part of the Rothleigh and Swithmore layout  ... well will be worked on again sometime.

 

IMG_0550.jpg.537b161132918fe81e66cc3772830785.jpgIMG_0551.jpg.a922b01958054b8d6931b112fdd2cbb6.jpg

  • Like 4
  • Craftsmanship/clever 2

Share this post


Link to post
Share on other sites

That looks a lot better Peter, well done mate.:good:

Share this post


Link to post
Share on other sites

Today fixed the near end scenic hills onto the backboard.  Compared to the bridge that was completed satisfactorily this morning it was easy.

Also discovered a Metcalfe signal box and loco shed hidden away and have temporarily put them on the layout.  While not 'modern quality' they do not really look out of place so may well stay.

IMG_0561.jpg.4306abae5aef91fdb6611e04c075739a.jpgThats it today folks - thanks for reading.

  • Like 6
  • Craftsmanship/clever 1

Share this post


Link to post
Share on other sites

Still wanted the 5th line to 'go somewhere' so ripped it upend made a tunnel by extending the hills at the 'fiddle' end.  The plaster is still not dry so the tunnel mouth will be another day.

 

In the meantime I was happy with the signal box so have put some stays on the board for it to fit - it cannot be 'permanent' because of the hinge fold.  Liked the engine shed too but the entrance was on the 'wrong' side, modified the scenery to take it as is and then readjusted the track to 'fit' in the middle of the shed and used a bit of brick paper to provide access to the side door.

IMG_0563.jpg.6e93c80ae8ceccff30a953df1ff783ea.jpgIMG_0562.jpg.017abd8c3716db2c48124a9e46fda458.jpgIMG_0564.jpg.ea744c5656412064ec265e8b7707e13c.jpg

  • Like 2

Share this post


Link to post
Share on other sites
33 minutes ago, PeterBB said:

Still wanted the 5th line to 'go somewhere' so ripped it upend made a tunnel by extending the hills at the 'fiddle' end.  The plaster is still not dry so the tunnel mouth will be another day.

 

In the meantime I was happy with the signal box so have put some stays on the board for it to fit - it cannot be 'permanent' because of the hinge fold.  Liked the engine shed too but the entrance was on the 'wrong' side, modified the scenery to take it as is and then readjusted the track to 'fit' in the middle of the shed and used a bit of brick paper to provide access to the side door.

IMG_0563.jpg.6e93c80ae8ceccff30a953df1ff783ea.jpgIMG_0562.jpg.017abd8c3716db2c48124a9e46fda458.jpgIMG_0564.jpg.ea744c5656412064ec265e8b7707e13c.jpg

Looking at that last pic Peter, how will that fold now, or is it now fixed permanently?

Share this post


Link to post
Share on other sites

Good question.  The tunnel part of the back scene, the bridge and the signal box get in the way of the hinge so are removable and added in set-up ... at least that is the current idea.  As your experience on RM posts demonstrate things change when something does not seem quite right.

  • Craftsmanship/clever 1

Share this post


Link to post
Share on other sites

Tunnel now modified (will still need a baseboard 'placer' because the free side twists in.  Bridge upgraded to entirely fit across the baseboard and the road added together with the blue brick paper (running short of glue now so used PVA for the paper - must have got it right no problems).  Odd bits of plaster applied as needed and then the base coat of fence paint so it begins to look like a railway (Rule 1).

 

Picture 1 - the whole layout and Picture 2 the tunnel - the embedded scatching not showing up too well. 313600645_CadleyHill5200630.jpg.ae909d6214887b7c27dd3f507be55d1d.jpgand Picture 2 - Most of it

IMG_0566.jpg.f381e00fa36e5ee676b7988546e0d039.jpg

  • Like 3
  • Craftsmanship/clever 1

Share this post


Link to post
Share on other sites

You may have noticed that the 5th line was missing ... not happy with it so after doing lots of little but time consuming necessities decided to relay that track.  Tried many combinations before deciding to use a new code 100 length ... then decided that the point  (thought it might be an old Hornby) needed replacing but it was Peco as is the same  Thanks for looking.replacement although different, the date on the first was 1998.  This still did not tie in happily with the concrete track that originally I decided was fine scale so I ripped that out as well and replaced with code 100 concrete.  Track runs much better and of course into the tunnel.  Wiring will of course need replacing after which I will have a running session to check before doing anything else.

  • Friendly/supportive 2

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.