"No, I'm building a new layout so that my nephew can play on it when he comes over"


 

-The least convincing argument ever,

October 21, 2018

 

To be fair, it's not his fault at all. I lay all the blame at Bachmann's door: there I was, happily bumbling away with the odd O gauge wagon kit, promising myself that I would build the layout to go with them soon, when suddenly the boys from Barwell announce their OO9 Quarry Hunslett. I have an almost crippling fascination with all thing industrial, and these diminutive 0-4-0s are probably the epitome of all that I love about the subject, so after approximately 7 microseconds of agonising soul-searching I put an order in for one and started planning a layout.

 

I set out a list of key points that I wanted. The layout would have to be storable and small enough to be put away when not in use. I also wanted to use as many off-the-shelf scenery products as possible, as I didn't have much free time when I started the project, and I felt that these would make the project easier. It should also be noted that, apart from one brief attempt six years previously, I had zero experience at scenic modelling, so this would be a test bed for many skills and products.

 

The layout itself is built on a 900mm by 450mm laser-cut baseboard, with back scenes made from 5mm ply cut to size by the local hardware shop. The backdrop is a Faller product, pasted to thick lining paper, then curved around the back, before the rest of the scenery was built on top of it. Most of the landscape is built from expanded polystyrene and thick brown card formers, the cliff faces then layered with plaster bandages and sculpted using Noch Rock Compound. Once dry, I tried to add a dark wash to parts of it to decrease the uniform colour of it, but the surface proved to be to porous, so I instead dry-brushed some highlights onto it. The buildings are scratch built from card, plastic section and sheet, and various doors and windows, before being painted and having basic lighting added with warm white LEDs; the one exception to this is the small shed on the front right of the layout – this was bashed from a Wills bicycle shed, as I wanted a few bikes on the layout. Ballasting, forever an anathema to me, was simplified using Deluxe Materials' Ballast Magic, which made life much easier. Wherever possible, materials were sourced from my local model shop, but use was also made of several online shops, as well as a box of old materials I have had lying about for years. Signage was made using an old but serviceable graphics package on my computer, before being printed off at high quality onto photographic paper.

 

Rolling stock is all Peco, suitably weathered, whilst the diesel loco is Minitrains. All operation is via analogue DC, with electrofrog turnouts operated manually. Running is smooth all the way down to crawling, with continuity maintained using Deluxe Materials' track Magic

Hope_Ridge_0.JPG.c1c72f11238ec8ad960ae86b1fb5d151.JPGHope_Ridge_1.JPG.61e863c4314cead0534145c279e251f9.JPG

Hope_Ridge_3.JPG.3d9eb851f5842c6e0cef9426f594d24b.JPGHope_Ridge_4.JPG.935c7a54cd2961258be46c8aa357671e.JPGHope_Ridge_5.JPG.cc1a07bd81ba255ad31a78a08d98b932.JPGHope_Ridge_6.JPG.5fdd5dadbedc310df2d269439dc8619d.JPGHope_Ridge_7.JPG.f67fd952f2bb0b8ec9c6aad4ce912481.JPGHope_Ridge_8.JPG.10bd97a486d474b24ff499e863948251.JPG

Hopefully, my Nephew and I will get many hours of enjoyment from this. Perhaps one day that Hunslett will arrive, and find a warm place waiting for it in the shed!

 

History Of the Quarry

 

High above the sprawling industrial conurbation of the Rother Valley sits an outcrop of millstone grit, used by the locals since ancient times as a source of material for building and milling. Not much happened in the area until the mid nineteenth century, when easier workings and cheaper transport made the workings uneconomic and the site was abandoned.

 

The workings, locally named “Hope Ridge” after the Nineteenth Century landowner, Sir Erasmus Galahad Hope, lay abandoned and gradually returned to nature, providing an interesting hazard to sheep and fell walkers, until in the mid 1950s, when it was decided that the industries in the Rother Valley needed an improved water supply. A large, underground aqueduct was proposed to bring water down from the reservoirs of the Peak District, and the old quarry was chosen as a perfect place to base an intermediate shaft to access the tunnelling. It is now the early 1960s, and the site is used primarily to load bulk cement and aggregates onto a narrow gauge railway, which then takes them into one of two tunnels, where they are offloaded and used to line the tunnel. Rolling stock for the works was purchased second-hand from other railways, and as such consists of many unusual combinations, from German diesels to Welsh steam engines.

  • Like 3
Link to post
Share on other sites

Good idea, although I have had bad experiences with poor running after trying it in the past.  After all, it is more of a "toy train" for the young 'un to play on when he visits (I keep telling myself that - who am I fooling?)  Maybe I'll pull out the track dirt and rust paints at a later date.

 

-Chris

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...