Only-Me Posted November 14, 2019 Share Posted November 14, 2019 (edited) It just occurred to me that I haven’t really posted anything about the layout I’ve been building for the past 18 months.... so maybe I’ll start at where the build is now! Based loosely on Burngullow and the Blackpool clay dries, this 11ft by 3ft N gauge depiction of the area is a fully automated DCC controlled system using Digitrax and Digikeijs hardware i have a resin 3D printer so most of the buildings have been made myself at home Era is early diesel hydraulic to 1979 and first outing will be N Gauge Southeast in 2020..... Edited November 14, 2019 by Only-Me 10 Link to post Share on other sites More sharing options...
RMweb Gold Revolution Ben Posted November 14, 2019 RMweb Gold Share Posted November 14, 2019 Hi Paul, Great job, but the dries area looks a little underdeveloped... cheers Ben A. Link to post Share on other sites More sharing options...
Only-Me Posted November 14, 2019 Author Share Posted November 14, 2019 @Ben A indeed its awaiting the builder of the centre piece to step up 1 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now