Jump to content
 


Tangoman69
 Share

Recommended Posts

  • 3 weeks later...

Progress has been really slow, the layout is next to my work desk and after 9-10 hours of Teams meetings, I have very little mojo for sitting on the same chair any longer.

I was going to reply earlier but had to replace the outer track as somehow it had got damaged. The latest mini projects include the scenic break bridge, the start of the building site, my snowploughs ( further inspired by the current weather) and a road snowplough to go on the road bridge.

 

The overall aim is to have a wintry covering.

 

Karl

85431FE1-A4DF-4E9E-812A-27A6ED89A652.jpeg

F338E585-C095-4C22-956E-8FB3623FF3DD.jpeg

25E2EF11-04EB-4A50-B577-3BFA25FC566B.jpeg

CECEF281-429B-4DEE-B272-5A4C6863FFB3.jpeg

  • Like 3
Link to post
Share on other sites

  • 1 month later...
33 minutes ago, Tangoman69 said:

My mobile phone site is starting to take shape, my plan is for a diarama around a 5G upgrade in progress. I’ll need to source or create a cherry picker

E60AB1E0-488A-43F6-BDC8-EB60100AAC18.jpeg

Bringing work home ?

make sure it doesn’t interfere with the GSMR :no:

  • Like 1
Link to post
Share on other sites

  • 9 months later...

Been very slow progress over the past 10 months, dabbling here & there when I can.

Still need to continue with the detailing around the palisade fencing and weathering of the track before starting on my car park extension.

79F7D470-7E87-4F8F-A491-F62DADEC5389.jpeg

C1B378AF-B418-40C4-A096-820EBCD871D7.jpeg

  • Like 7
  • Craftsmanship/clever 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...