Jump to content
 

Ashtown TMD


Alcanman
 Share

Recommended Posts

8 hours ago, Alcanman said:

Working on the oil storage siding, I've added hard standing and piping.

 

The low relief warehouse is probably just temporary.

atmd 9.4.20 001.JPG

atmd 9.4.20 003.JPG

Now that's looking great :good:

  • Like 1
  • Thanks 1
  • Friendly/supportive 1
Link to post
Share on other sites

9 hours ago, Alcanman said:

Added some low relief bushes behind the stone wall.

 

There not glued in place and could be removed but I think they add depth to the scene.

atmd 13.4.20 004.JPG

Adding the wall realy helps giving the depot depth Alcanman

Realy brought my Colmore depot more to life doing wall in the back ground..

  • Thanks 1
Link to post
Share on other sites

Having plenty of time available due to the lockdown, I've made good progress with the layout, which I started building on the 1st March.

 

This portion of the layout is virtually finished, but still plenty of work to do.

atmd 17 001.JPG

  • Like 6
Link to post
Share on other sites

On ‎17‎/‎04‎/‎2020 at 10:48, Alcanman said:

Having plenty of time available due to the lockdown, I've made good progress with the layout, which I started building on the 1st March.

 

This portion of the layout is virtually finished, but still plenty of work to do.

atmd 17 001.JPG

Nice updates here with pictures Alcanman...

  • Thanks 1
Link to post
Share on other sites

Today, I've been working on some concrete hard standing along the front of the layout. I used some Ratio platforms (having used the platform edging for coping on the stone walls at the back of the layout)

 

 

 

 

atmd 23.4.20 010.JPG

  • Like 3
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...