AyJay Posted October 23, 2020 Share Posted October 23, 2020 Hello, I have finally decided to make use of the excellent Cobalt point levers by DCC concepts, up to 24 of them required, I'll also be having a mimic panel to show point settings. This poses a conundrum. When looking at my trackplan, attached, I will be standing in the middle and facing downwards, looking towards the station, engine yard and goods yard. So my left appears to the right on the diagram. I plan to site the levers on the edge of the board near the station. The levers for the fiddleyard, behind me, will also need to be mounted in front, since that's where the encoder boards will be located. Is there a convention for how the levers should be arranged? i.e. should they be positioned left to right in the same order that the points appear? Should the mainline point levers be in a separate group from the engine yard levers, or should they all be in one long line? At some point, I hope that there will be working semaphore signals and I'm pondering the MegaPoints Controller system for that, but that will be after I have paid off the second mortgage on this project. Any thoughts on this much appreciated. Thanks, Alan Trackplan_V10point8_a3.pdf Link to post Share on other sites More sharing options...
Gordon A Posted October 23, 2020 Share Posted October 23, 2020 As far as I know the Cobalt point levers are not available and have not been for some time. Link to post Share on other sites More sharing options...
philsandy Posted October 23, 2020 Share Posted October 23, 2020 2 hours ago, Gordon A said: As far as I know the Cobalt point levers are not available and have not been for some time. Didn't know that, I have 6 on my layout. Do you know why? Link to post Share on other sites More sharing options...
Free At Last Posted October 23, 2020 Share Posted October 23, 2020 Found on Faece Facey... 2 1 Link to post Share on other sites More sharing options...
AyJay Posted October 24, 2020 Author Share Posted October 24, 2020 Thank you for that. Can I please have an answer to my question? ;-) Link to post Share on other sites More sharing options...
RMweb Gold Harlequin Posted October 24, 2020 RMweb Gold Share Posted October 24, 2020 Hi AyJay, Yes, there is a convention (and a lot of details) but the exact layout will depend on the region and period of your layout - the experts will need to know that. You'd probably get an answer if you moved this post to Permanent Way, Signalling and Infrastructure because that's where all the signalling experts dwell. If you want to do that, just use the ... menu to Report the first post and ask Andy to move it. 1 Link to post Share on other sites More sharing options...
Wheatley Posted October 24, 2020 Share Posted October 24, 2020 (edited) Short answer to a long subject: Points and signals on running lines (lines under the direct control of the signalman so main lines, loops, crossovers, bays and connections to yards etc) will be controlled from the signalbox so can be grouped together. Generally the levers to the left of the frame control those points and signals used by trains coming from the left (of the frame), those on the right trains from the right. Everything else goes in the middle, the exact order depends on the requirements of the witchcraft that is mechanical locking. Points in yards will usually be hand points operated by the shunter so it's entirely up to you how you group these. Mine are in a separate frame to one side of the 'signalbox' frame, lettered A to E and reading left to right along the yard as I look at it from the operating position. Fiddle yards - well there are none on the real thing so entirely up to you. Yours are loops similar to mine so it could be as simple as 10 push buttons, 1 for each through route, controlled by diode matrices (more witchcraft). I prefer levers so mine (when I finish that bit) will be arranged as a separate group of levers for each end of the yard. Operating levers 1 at each end sets the road for loop 1, operating 1 and 2 selects loop 2 and so on. It won't quite work out like that because the ends aren't a pure ladder but that's the principle. Edited October 24, 2020 by Wheatley Link to post Share on other sites More sharing options...
Wheatley Posted October 24, 2020 Share Posted October 24, 2020 (edited) Here's mine. The megaloops are on the new layout currently under construction in the garage. Slightly confusingly the signalbox is to the right of points 3a but with the frame facing the operator, so 'my' lever frame is correct for the box but the wrong way round for the operator. Edited October 24, 2020 by Wheatley Link to post Share on other sites More sharing options...
AyJay Posted October 26, 2020 Author Share Posted October 26, 2020 Thank you all for your helpful input, I had another think about what I wanted. Wheatley, as I read your reply, I could almost hear you saying "and you can't go far wrong...." Rather than ask this thread be moved, I think it best that I start again with a freshly worded text. Admin, will you please close this thread and point towards Permanent Way, Signalling and Infrastructure, where I will shortly re-post. Thank you. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now