Jump to content
 

'Wyreford'


Houndog1372
 Share

Recommended Posts

Hello all! 

 

Thought I would start a thread on here to run alongside my YouTube channel! My layout is called 'Wyreford' and is based on the WCML, roughly between Weaver Junction and Stafford. The layout will be set between 1995 and 2010, an era which I fondly remember from when I used to go for days out with my Dad and latterly, my friends. 

 

I previously owned Bala, a Liverpool Model Railway Society layout that my Dad bought for me back in 2009. The layout served me well for ten years, before slowly starting to fail in places (Dead sections, warping ect). Bala, was housed within my garage, which was uninsulated and rather dusty (As well as being absolutely freezing in the winter), all of which didn't help! 

 

 

67265112_2374099036002695_3743150567824818176_n.jpg

67298392_2374099682669297_3483957009567449088_n.jpg

66960415_2374099919335940_851236305881792512_n.jpg

123799375_642484979780028_8973587859505350736_n.jpg

Link to post
Share on other sites

Therefore, earlier this year I decided to take down 'Bala' and start the long process of building my first proper layout (All my previous layouts have been bought)! One thing that I decided, was that I wanted to sort the garage out before starting to build the layout. I could just about cope with the cold temperatures in my teens, but them days are long gone! 

After months of saving up and getting the RDW/Sundays in, I had enough to start convert the garage into a room, were I could happily play trains all year around. 

Come February 2020, we contacted a firm to begin the conversion. They looks brilliant online (Flash website, great reviews ect) and we gave them the job. The next day, they start getting to work. They suggested that I fit a Lantern into the roof to add light, and they had it fitted two days after starting the work. Overall, I was very impressed with the quality work and the speediness..

However, just before lockdown things started to change. They asked for money up front, and then more money and then they would go missing for a week, then the excuses started. The quality of the work nosedived, and I came from work one evening to find second hand bricks, and doors which they wanted to fit onto the garage. 

To cut a very long story short, they took all the money and ran, leaving me with a shell of a garage which was leaking and rubble left all around the house. The insulation and plasterboard was left on the grass, eventually getting soaked in the rain. Then lockdown came, and that gave them the perfect excuse to run. The business was closed due to the pandemic and our money was 'gone'.

It turns out the gent running the business is known for ripping people off, closing the business down and starting another. We have tried to chase the money back, but we have been told 'we will get nothing'. 

 

Here are some photos of the 'handy-work'

123782104_2518046128493449_90047750903743872_n.jpg

123739837_1796124533868586_7943589588734206910_n.jpg

123780041_2821666448111625_1151937244968681774_n.jpg

123792548_399768161410213_4555050227852405532_n.jpg

123714161_965675610509205_4707135984782022520_n.jpg

123813048_3420421784744097_310341509996316495_n.jpg

  • Friendly/supportive 2
Link to post
Share on other sites

Once we came out of lockdown, I finally managed to contact another (Much better) builder and the work was done within two weeks!

Now I had the garage sorted, myself and my friend began to construct the baseboards. There were constructed over August and September, and measure 22ft by 8 ft. The tops of the baseboard is made from 9mm Plywood, and is braced by 2x1 softwood.  The legs are made from 3x1.5.

They have just been painted grey to protect the plywood from the glue and any other material we end up placing down. 

The cork used is 4mm, and so far this has been placed on the fiddle yard, and under the town scene. The scenic side of the layout will have the cork placed just under the tracks at a later date.

 

One issue I am finding so far (and I know I'm not alone!), is peco track. The layout will be all code 75, and I have managed to get two boxes of flexi-track, and 8 curved points for the entrance to the fiddle yard. 

Hopefully I can start laying track properly at the end of this week (Only thing I'm waiting for is wire for the droppers). 

That is were I'm at currently! The layout will be DCC, although I'm still deciding on what the best controller is) 

 

Thanks for reading, my YouTube channel is - https://www.youtube.com/user/houndog1372

 

 

 

 

123823942_371615264280690_9118678430470307875_n.jpg

123742259_283771116244158_528131958375600652_n.jpg

 

123775822_710855912886691_2194461015141722851_n.jpg

123814278_773184186872967_3629707265448831631_n.jpg

123778026_2868328550066261_2583603435783158260_n.jpg

123798132_402183674142860_6150720987994794208_n.jpg

123779544_369214387476263_4295099757112404441_n.jpg

124185090_3569822263107030_1602866689865827212_n.jpg

123792549_370768957324777_3999152287836153243_n.jpg

123869682_2609069662716385_4760648321326385656_n.jpg

Edited by Houndog1372
  • Like 2
  • Agree 1
Link to post
Share on other sites

  • 1 month later...

More progress has taken place since my previous post! 
The fiddle yard is 95% complete, and only requires droppers to be installed near the points, and the point motors need installing themselves. 
The idea with the entire layout, is that every piece of track has its own power source, so we aren’t relying on fishplates to conduct electricity. 
As for the controller, I have been looking at the Gaugemaster Prodigy unit. Still to be decided what I actually go for! 
Each road within the Fiddle yard can accommodate 12 coach trains, meaning all my HST sets fit comfortably. 

 

It is now turned into a waiting game for track, I have managed to source a full box of Peco Code 75 Concrete Sleeper track to start the scenic side of the layout. I’m hoping that the one box should be enough, but we shall see. 
 


 




 

FF2730C9-E988-4875-96A9-659359A8040B.jpeg

8E6C38CF-A32B-4A7D-80B5-429F1F3C8906.jpeg

9E7BBDA5-38BE-4903-AF05-6A7E47D222E1.jpeg

  • Like 2
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...