RMweb Premium DLT Posted March 7, 2021 RMweb Premium Share Posted March 7, 2021 On 17/01/2021 at 13:03, Horsehay Railway Modeller said: I've just had a play with this design again. I realised I could extend the storage board and it would still fit on my bed. I've also designated a cassette section in the top siding. I've added another 3 way at the bottom as it makes the geometry better. This means ve moved the join in the boards so it sits just between the 3 way points ( I've not had any issues with a similar join in my current uni layout.) Finally I've added a set track point in the bottom right ( it's all that would fit on the second rad curve) and this allows access to another board which could be a quarry or anything else for future expansion as suggested. I think it Looks alot more organic now. I would reverse that point, making it the loop point and making the loop longer. Then you could loose the 3-way, and start the goods sidings sooner, making them longer. 3 Link to post Share on other sites More sharing options...
RMweb Premium DLT Posted March 7, 2021 RMweb Premium Share Posted March 7, 2021 On 17/01/2021 at 13:03, Horsehay Railway Modeller said: I've just had a play with this design again. I realised I could extend the storage board and it would still fit on my bed. I've also designated a cassette section in the top siding. I've added another 3 way at the bottom as it makes the geometry better. This means ve moved the join in the boards so it sits just between the 3 way points ( I've not had any issues with a similar join in my current uni layout.) Finally I've added a set track point in the bottom right ( it's all that would fit on the second rad curve) and this allows access to another board which could be a quarry or anything else for future expansion as suggested. I think it Looks alot more organic now. I would reverse that point, making it the loop point and making the loop longer. Then you could loose the 3-way, and start the goods sidings sooner, making them longer. Or turn it the other way round, put the goods yard where the loco shed is, and convert the bay into a headshunt? Link to post Share on other sites More sharing options...
Horsehay Railway Modeller Posted March 8, 2021 Author Share Posted March 8, 2021 On 07/03/2021 at 11:33, The Stationmaster said: Ah, Shropshire so a good source for ideas might be A E Housman and take one of his poems, mentioning cherry blossom, as a hint you might end up with 'Cherryfield'. However as you havea river you could possibly use 'Cherrydene' instead https://www.poetryfoundation.org/poems/44411/a-shropshire-lad-2-loveliest-of-trees-the-cherry-now As there was a Cherry Orchard (sidings) - as well as numerous places with 'field; sidings - on the GWR you also get a link that way - both Shropshire and GWR Thank you verry much, I have taken your inspiration and my mind is now settled on cherrybrook. I am also opening a layout topic thread under this name as the plywood has just been delivered. 1 Link to post Share on other sites More sharing options...
Horsehay Railway Modeller Posted March 8, 2021 Author Share Posted March 8, 2021 for those that havent seen the signalling thread, the finalised track pln looks like this. the 2nd rad curve and 3 way point are still a compromise, i have also removed the set track curved point and will simply relay the track if i want it as a shelf layout in a few years time. 2 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now