Jump to content
 

Modelling Network Southeast


Newmodeller96
 Share

Recommended Posts

  • 3 weeks later...
  • RMweb Premium

In that case, if it'd be a complete separate system, considering how much ummm-ing and ahhhh-ing its taken to get this far, I'd go ahead and build this layout first before thinking about adding something else. You're not going to get much above the existing tracks in the same scenic area, you don't have space for a separate oval on a higher level one behind the other, so I'd just get on and build what you have. 

Something like the EMU sidings could be on a slightly lower level (or the main lines a slightly higher level) for variety, but that's more a centimetre or two difference rather than a whole new level.

  • Like 2
  • Agree 4
Link to post
Share on other sites

6 minutes ago, Satan's Goldfish said:

^ What he said ^

 

I know it's probably not what you want to hear, but remember to walk before you run. Get the current layout built and running first.

This is good sense!

I think you will find you have your hands full with scenic work and operating sessions without the added work, cost  and stress of a second level/layout.

Best of luck!

Regards

Paul 

  • Like 1
  • Agree 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...