russellwar Posted January 9, 2021 Share Posted January 9, 2021 (edited) So with the last year causing some restrictions in working and a workload from the past 10 years being a little less, it thought I would finally get something done over the past year on the layout that was thought about here the boards are from an old n gauge project and I added to it to take the layout round the room. The first photos show the fiddle yard during testing. The main storage roads are Peco flexi track but I linked them to Tillig Elite with the peco multi code joiners. Edited January 9, 2021 by russellwar 3 Link to post Share on other sites More sharing options...
russellwar Posted January 9, 2021 Author Share Posted January 9, 2021 (edited) All points are powered by tortoise motors decoded mainly by DCC concepts ADS decoders Edited January 9, 2021 by russellwar 2 Link to post Share on other sites More sharing options...
cheesysmith Posted January 10, 2021 Share Posted January 10, 2021 Will pop in from time to time to keep a eye on what you are doing, as it is my home area. As for the industry, have you thought about a scrap yard? There has been quite a few through the years, as the metals were always wanted by the steel industry, and would allow you to have quite a varied stock (EMUs and electric locos in Rotherham for example). 1 Link to post Share on other sites More sharing options...
russellwar Posted January 10, 2021 Author Share Posted January 10, 2021 (edited) The board that links front to back so to speak has 2 short sidings. I had planned to make a small shed or stabling point, however I have run into a problem that the curve into the sidings from the fiddle yard is too tight for a Bachmann 37. I need to check a couple of other locos but I think co-co arrangements will struggle. If this is the case then I will most probably create 2 sidings for DMU’s there is a y point on the main as this was the only way I could get access to all fiddleyard roads. I would want this on an exhibition layout but as it will stay at home it will be fine hidden by the scenic break Edited January 10, 2021 by russellwar Link to post Share on other sites More sharing options...
russellwar Posted January 10, 2021 Author Share Posted January 10, 2021 The main scenic boards seen looking towards the station. The industry sidings discussed here will be based on the Cobra building at Wakefield. I am now slowly working on checking the running of all the lines into the station. Came across some dodgy wiring today so this week will be trying to debug and tidy the last couple of boards wiring. The last photo looks out from the station. Platforms are numbered 1-6 (from the right in the photo). 1,4 & 5 will mainly handle dmus. The gap between 4 and 5 will be a disused middle road. I wanted to have the center road but unfortunately the baseboard joint offered no possibility to lay the point. there is also a short siding for a station pilot as I have a large selection of 08’s. This will be used in conjunction with platforms 5 & 6 that will also have prxeös traffic. Platforms 2 and 3 have been modelled to take a cross country HST set or even have a loco run round or a new loco attached. 1 Link to post Share on other sites More sharing options...
russellwar Posted January 10, 2021 Author Share Posted January 10, 2021 Also been getting the ECoS set up. i love the fact I can load the icons to make it very easy for to find locos. Setting up a.m track plan was a little challenge but once you get the hang of it, it’s fairly logical 2 Link to post Share on other sites More sharing options...
russellwar Posted May 16, 2021 Author Share Posted May 16, 2021 Managed to get the track sprayed with rust and then sleeper grime. Used a new airbrush (Iwata high performance plus from eBay) . Made spraying sleeper grime possible without masking. Have now experimented with woodland scenics stone ballast secured with Klear which seems to give the look I desire on one of the platforms. Now everything is tested and sill working so time to ballast the lot. Just in dilemma whether I do the signaling first? 3 Link to post Share on other sites More sharing options...
russellwar Posted May 23, 2021 Author Share Posted May 23, 2021 More Sunday ballasting. Another 2 platforms done and the area that was the center road Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now