Hi Everyone

I thought I would share with you my new project.  I’ve always liked Inglenook style shunting layouts and incorporated one in my previous layout, Bankside.  Since a house move back in 2010, I’ve been working (slowly) on a permanent room sized layout based on a fictitious heritage railway.  Being quite daunted at times at the amount of work needed on the “main” layout, and sometimes not being able to run trains whilst wiring or scenic work progresses, I thought I would divert myself with a little project!  The main criteria are as follows:

 

1.      OO gauge

2.      Size of baseboard will be 1500 x 300 mm, to be portable and easy to store in the “train” room

3.      Classic Inglenook 5-3-3 shunting layout, for shunting using diesel locos and appropriate wagons

4.      Automated uncoupling

5.      Electrically operated points

 

The design isn’t going to win any awards for originality!  I used some lining paper, affixed to a piece of hardboard of the correct size to come up with this:

 

1986206924_Trackdesign-forWeb.jpg.a583ef6944132036f040789d52526f7f.jpg

 

The points are all PECO small radius (one left, one right and one wye) and although the small siding from the wye point isn’t needed for the puzzle, I wanted to add a bit of interest!  Whilst working the puzzle, the wye point will remain switched to the main line.  This provides a sufficient head shunt for a Class 37 and 3 wagons.

 

Regarding uncoupling, Bankside used the Hornby uncoupling ramps (I found these worked better than the PECO ones) but even so, running (aka trundling) at such slow speed when pulling wagons sometimes resulted in unwanted decoupling.  I have just ordered a Gaugemaster electromagnetically controlled uncoupler, and have built (i.e. thrown together) a test track to evaluate its suitability:

 

1594091639_Uncouplertesttrack-forWeb.jpg.b6b4e74a131924a55580ddc6f5e049e9.jpg

 

Theoretically, being able to raise the ramp at a touch of a button will overcome the shortcomings of the Hornby (and PECO) uncoupling ramps.  Watch this space……

The Gaugemaster TLU should arrive next week and I’ll start giving thought to the scenery.

 

More later….

 

 

 

  • Like 1
Link to post
Share on other sites

So, the next instalment.  The Gaugemaster TLU arrived from Rails of Sheffield on Friday, so earlier today I experimented with hands-free uncoupling.  This is what is supplied:

 

1931005015_GaugemasterTLUPhoto1(2).jpg.63699f9955b8ae9e425cdbc2a4806065.jpg

 

The first job was to drill the two holes (one countersunk) as per instructions, the only slight deviation was the use of a 4mm drill bit instead of 3.5mm:

 

2081349238_GaugemasterTLUPhoto2.jpg.846d5b885f27843494eacf29a0b47924.jpg

 

Please ignore the quality of the surface – this is just a test track to ascertain if this is the solution to my coupling conundrums!  Once the holes were drilled, I pinned the track back down, cutting back one of the sleepers, again, as per instructions:

 

772358093_GaugemasterTLUPhoto3.jpg.86ad982102e453eb6a0869922d89bd69.jpg

 

Please ignore the quality of the surface – this is just a test track to ascertain if this is the solution to my coupling conundrums!  Once the holes were drilled, I pinned the track back down, cutting back one of the sleepers, again, as per instructions:

 

865470701_GaugemasterTLUPhoto4(2).jpg.52e6451e4210964d4943b9d27c6ff665.jpg

 

Once turned back over, the ramp was dropped through the centre of the solenoid and the screw on the shaft tightened:

 

248285503_GaugemasterTLUPhoto5.jpg.462e2fc4cca54a142710b02e68b99c5f.jpg

 

It works brilliantly!  No unintended uncoupling when wagons a pulled slowly across as the ramp is only raised when the switch is pressed.  The solenoid is quite noisy but when these are fitted to the layout, I may be able to encase them in something to deaden the sound a bit.  The instructions mention to check that the ramp does not sit too high when using fine scale track (my test was conducted using code 100), so I’ll use code 100 track on Trundle rather than code 75.

 

I've taken a video of it in action, so will post this first, then see if I can upload the video.....

 

 

  • Like 3
Link to post
Share on other sites

OK, I've just created a YouTube channel, so you should be able to watch the video here:

 

Gaugemaster TLU Test

 

Obviously adding this uncoupler to a test rack was really easy and indeed, incorporating into a new layout will also be straightforward, but has anyone retrofitted these to an existing layout?  How easy was it to get the holes cut when track and ballast was already in place?

 

Cheers

 

Glen

  • Like 1
Link to post
Share on other sites

  • 1 month later...

Progress on this layout has been somewhat slow recently - partly because despite emailing a very well known baseboard manufacturer twice with a simple question regarding their baseboard kits I still haven't had a response.  Instead I found a wood supplier online who can cut wood to size so I worked out the pieces needed and ordered from them.  I also took the opportunity to lengthen the layout by 150mm as the original length was just a bit too tight.  The wood arrived on Friday, however, two pieces are missing and one was cut to the incorrect size, so I'm awaiting replacement parts.  The wait continues...

Link to post
Share on other sites

Hi again,

It seems that with the proposed layout it looks like you will need more of the solenoid uncouplers of the type that you have tested, one for each siding ?
If you were to adopt a delayed action system you could uncouple at a position between the Y-point and the RH point and shunt down any siding using just 1-uncoupler.

The system I mentioned previously does this, is not visible and can be operated in several ways much like a point, manually by wire in tube, push rod or electrically except for ‘bang- bang’ solenoids.

Have you had chance to view the videos on YouTube yet?

Also Megapoints controllers have a range of components one of which can control up to 4-servos (4R) to give slow quiet operation of points, signals and other accessories.

I have found it gives many advantages in use on my layout.

I look forward to future updates on your layout.

Regards.

Link to post
Share on other sites

  • 5 months later...

My apologies to Dawn Flyer - for not spotting his/her replies.  I promise you I wasn't being rude, I just didn't spot them!  I will certainly check out out the MRTEE uncoupler you mentioned, although I have since purchased the Gaugemaster ones in readiness.  Along with my good friend Dik, we are going to see if we can modify the GM ones to make them a bit less "fierce" in their operation.

 

Since my posts ages ago, the baseboard has been built and painted (therein lies a tale for another day), cork sheet affixed and it is ready for track laying.  I haven't finalised a track plan as yet as I am still determining a suitable theme for the layout.  I had sort of settled on a cement works (and have purchased a Walthers HO scale kit to be the main structure on the layout), to take advantage of the highly regarded Accurascale PCA Cement wagons, but there does not yet appear to be a confirmed released date yet for these so I am a bit reluctant to build a layout without suitable rolling stock to use on it.

 

I'll post some photos of the progress to date in due course,

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...