Jump to content

Recommended Posts

1 hour ago, Courtybella said:

Class 08 brings a single Brakevan past CB2 signal.

Rather pleased with how work has turned out today, double track curves, and straight sections all down and droppered, with loading road realignment also complete.

D23483BD-E0F0-46B5-9E8C-92EB4BB9EC27.jpeg


I can envision it already, look forward to seeing the scenic elements come together. There’s something about 7mm detail, especially on large layouts like this.

 

Keep the photos coming!

  • Friendly/supportive 1
Link to post
Share on other sites
3 hours ago, LDM34046 said:


I can envision it already, look forward to seeing the scenic elements come together. There’s something about 7mm detail, especially on large layouts like this.

 

Keep the photos coming!


Im going to try and build a coal loading building so can actually load wagons, something as imposing as this...

6E7A653A-7EB0-4C7C-8AA1-9BC76BDEB891.jpeg

F4776448-A802-41FB-8C24-DC87A5543EDC.jpeg

  • Like 2
Link to post
Share on other sites

Nice work bud keep it up bit of a random question how many boxes of flexi track do you think you’ve used/going to use to complete both circuits and the sidings I’ve got 3 boxes just trying to figure out if I need some more don’t want to stall because I’ve run out of track

 

david

Link to post
Share on other sites
10 hours ago, d winpenny said:

Nice work bud keep it up bit of a random question how many boxes of flexi track do you think you’ve used/going to use to complete both circuits and the sidings I’ve got 3 boxes just trying to figure out if I need some more don’t want to stall because I’ve run out of track

 

david


Ive used one full box so far, I reckon at least another three full boxes just to get the two circuits. 

Link to post
Share on other sites

Half size scale model floor plan of my coal loading hopper.

Height 350mm 
Width 330mm
Length 300mm 

About 114ft height x 98 ft long scaled up I think....

 

Either way it’ll be rather large, there’ll also be a twin tower across the Mainline connected via a “conveyer belt” basically a shot to allow manual loading of coal via a hopper inside the main loading house.

0B4720CE-0D0E-41F0-951A-B22EEAFB93D2.jpeg

  • Like 1
Link to post
Share on other sites
  • 2 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...