Jump to content
 

Signalling Help - Redwater TCD


MRC_Jacob
 Share

Recommended Posts

No signals. I think all of that would lie beyond a stop board (Stop and Await Instructions) on a reception track somewhere to the right.

 

Edited by SZ
  • Agree 2
  • Thanks 1
Link to post
Share on other sites

  • RMweb Gold

Signalling would be a ground position light at the exit from the depot, protecting the running lines, and a stop board on the incoming reception road.  Both these are likely to be beyond the  scenic break bridge on this layout, but the stop board might be visible, as it will be far enough 'in' for a dmu to clear the running lines and allow the inlet point to be reset for running line traffic.  It might have a phone alongside it, so that incoming drivers can contact the depot foreman in his office for instructions as to where the loco/unit is to be stabled.  The little mainenance shed needs a walkway, probably concrete, across the entrance, which will incur the foreman's wrath if you leave a loco afoul of it...

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...