Jump to content
 

How do you go about designing a large layout?


Recommended Posts

1 minute ago, RobinofLoxley said:

Doh, completely overlooked the OO/HO complication.

 

To be fair, a train of 00 British stock passing a train of H0 Continental stock doesn't look too bad, and with care the scenery can be made to work (even more so in the narrow gauge scales where the variety in size of NG stock makes the difference between 3.5mm and 4mm less noticeable).

 

What was problematic for my idea of a moveable train ferry would have been that somewhere in the process 00 wagons would have ended up being coupled to H0 locos or vice versa, which would have looked strange.

  • Friendly/supportive 1
Link to post
Share on other sites

Rereading this topic one thing that is missing is, how is the layout going to be planned - Anyrail or similar? Asking because Andy that I referenced has never had a track plan, he just builds and trusts his instincts and craftsmanship, pretty amazing actually. He has a whiteboard in the dedicated layout room.

 

After that, I am with James, the major fixed element is the station and being a through station according to the pencil plan, start there. If its a monster, in terms of track approaches required at both ends, it will probably determine/control a lot of other layout features. Can a higher level track be run behind it while allowing access (not a complete other level, just grade separated at that point.

 

The second major feature sounds to me like a viaduct or similar. OP, did you have in mind one of those North American timber viaducts that look like they would fall down if anyone coughed on them? The space can disappear quite quickly with such large features.

 

FWIW, I think building one helix would be enough for most people. If it was me, which it isnt, I would have one because if you are building your ultimate layout, and didnt incorporate a helix you would be forever saying 'I should have put a helix in'. I wanted to in my loft but I couldnt plot a route through all the beams and stuff in the way. Helixes also consume space!!

 

Finally, would I be right in thinking that you have to finalise the dimensions of the space before planning further as you could waste a lot of time otherwise, however, the station approaches can probably be planned as they will be the same come what may.

  • Like 1
Link to post
Share on other sites

Hi Robin,

Thanks for your reply. I do have Anyrail on my big PC but that isn’t set up at the moment. I think it’s V5 as I couldn’t get on with V6! Also, it’s the paid for version so I’m not limited to how many pieces of track I can use.

In terms of through station, the German section has to include my full Trix model of Dammtor station, Hamburg, the two kits that make up this model give you a building with an integral overall roof of some 1.4 metres length.

That’s a big building! Only four tracks and platform faces though but on the prototype, the platforms extend a long way out of one end and hardly anything out of the other end.

Maybe a grade separated return would be good, I don’t know.

 I would like a viaduct of some kind but stone, brick or concrete - we had one of those timber trestles on an old club layout and yes, it did eat up room and also looked quite wrong with large steam locomotives and modern diesels running over it.

I am sure I will have a helix, maybe I can go with one only, I know they are quite something to construct and they eat up a lot of track too. I’m thinking around 6 foot diameter to keep grades and curvature down as much as possible.

 

The point to this exercise is to help me decide how to actually go about planning such a project.

Whenever I’ve embarked on a project previously, I had a specific space to fill but this is different as the whole house is being designed by me and my wife. We have professional help with this but if I can establish the basis for what my layout should be, I can make any changes to the house plans if necessary.

Cheers,

John

Link to post
Share on other sites

  • RMweb Premium

To my mind, a "small" layout is one where one person can run the whole model, and there isn't room for a second operator. A "medium" layout supports a second operator (but one person can enjoy the whole thing with perhaps a wireless controller); and a "large" layout needs more than one operator or some element of automation to help. My own wall-hugger will thus be "medium size" when I finish it, but I know in my heart I really want more i.e. a "large layout".

 

I would look to a roundy-roundy with a double track main line and storage loops, with crossovers to let trains arrive in the loops and stop and go back the way they came. Some simple route-setting to let you choose the loop and then have the layout set up all of the points to suit.

 

Then have a third loop inside of the main line, and call this the branch. This line will have its own storage loops beside the loops for the main line, and crossovers to let trains reach the main line.

 

On the opposite side of the layout, build a motive power depot with a connection to the branch.

 

This lot will let you have three trains running while you concentrate on the operations in the depot; or you might ignore the depot, let a railcar amble around the branch, and use the main lines to send a train out, do one lap, then reverse. In other words, you have a large layout where you can get some enjoyment on your own, and there is room to add up to two more operators and everyone can have something interesting to do.

 

My own layout is supposedly set in Britain in 2012. A mate looked at my current project last Monday, he is the first railway modeller to see it. I asked him whether he thought my model looked like somewhere in Britain and he said an emphatic yes. But when pressed, he cited only the church tower on the backdrop. Many of my buildings are modern, and not particularly British.

 

For the period, he felt trains would not look out of place from the present day back to the mid-1970s. This was better than I hoped for. I pointed out a model wheelie bin, which would mean 1990s onwards, and I removed the wheelie bin today.

 

My layout is supposedly to 1:87 scale, for British H0, but built to the Continental loading gauge. This gives me the width and height to run trains of Continental origin (like the MaK Di-8) and British 00 models too, though of course not at the same time. I have just bought two Hornby 6-wheel coaches to put behind a Beattie well tank, and this 1930s-style train does not look especially out of place in its rather underscale surroundings. At least, as long as I tell myself this is a preservation working. Edit 1: These are physically small models; I am sure a mainline loco or Mk3 coach would look completely out of place.

 

So I am happy enough, with a small layout able to become part of a medium layout, and accept many kinds of trains.

 

This is fine for me, but I wonder how well it can translate to a "large" scheme. I think, a pleasant if generic landscape is possible as long as you keep it fairly modest. The backdrop will be ok if it shows a modern cityscape or maybe some wasteland or reclaimed land. But you will have to rule out a lot of the character of a real locations to make the surroundings generic for the selection of trains. I would want to make sure the roads have no road markings, and I could swap cars and lorries from one side of the road to another.

 

The Trix model station seems a big sticking point because it has such a clear prototype. So perhaps, you could have the three circuits I have described with some scenic breaks dividing them into different scenes. These scenes to have their own lighting and backdrops, with the lighting controllable. So for example, when you are running a British or American train, the Trix station is barely visible and all you can see is the train itself passing through a darkened space.

 

The mate who looked at my layout does not have a layout of his own. He has some tracks arranged around the walls of a double garage, but refuses all suggestions at scenic treatments. He runs long trains (say, fifty 4-wheel wagons), and gets pleasure from simply watching the trains go by.

 

Perhaps it would be possible to build a very basic layout, without scenery, to get the trains up and running. And then tackle a series of scenes, one each for Britain, Germany and somewhere in North America. Each scene giving a pleasing setting to enjoy the train(s) you have on the layout at the time; and being ignored and treated as a bit of connecting track when you are running other trains.

 

Edit 2: I can visualise a British/European scheme, especially if it is a freight operation with no signalling and no passenger platforms. I struggle with incorporating North America. Perhaps my postulated 'branch' circuit could be the place where the American trains stretch their legs.

 

- Richard.

Edited by 47137
  • Thanks 1
Link to post
Share on other sites

On 26/06/2021 at 15:25, Allegheny1600 said:

The point to this exercise is to help me decide how to actually go about planning such a project.

Whenever I’ve embarked on a project previously, I had a specific space to fill but this is different as the whole house is being designed by me and my wife. We have professional help with this but if I can establish the basis for what my layout should be, I can make any changes to the house plans if necessary.

Cheers,

John

I was about to say, this is probably the first time that a house has been designed and built around a pre-existing model railway design, but it almost certainly isnt.

 

With a helix you have to be sure you can reach the back/corner. if anything derails and falls off....

  • Thanks 1
Link to post
Share on other sites

I've a feeling the late Dave Shakespeare designed his final house having already had a layout plan in mind. Sadly as he was taken ill shortly after the house was completed, the layout never progressed beyond baseboard stage.

 

I used to help operate a layout with a helix at shows. Derailments were accessed by standing up inside the helix! Personally, I wouldn't recommend one if any other options are available.

  • Like 2
Link to post
Share on other sites

  • RMweb Premium

Chris Ellis writes about what he calls "multi-moding" in his book Next Steps in Railway Modelling, Midland Publishing / Ian Allan 2004. @Ian Simpson has lent me his copy.

 

In essence, you build structures on lift-out bases so for example you can drop in a British, German or American building. Ellis describes this for an inglenook but I imagine it would work fine for a larger layout, as long as the removable models are a manageable size.

 

It has got me thinking to allow a wider range of dates for the setting of my own layout.

 

- Richard.

  • Like 3
Link to post
Share on other sites

On 02/07/2021 at 18:46, RobinofLoxley said:

 

With a helix you have to be sure you can reach the back/corner. if anything derails and falls off....

 

4 hours ago, RJS1977 said:

I used to help operate a layout with a helix at shows. Derailments were accessed by standing up inside the helix!

That was my understanding of how to access a helix. It does mean the radii have to be quite generous!!

  • Like 1
Link to post
Share on other sites

8 minutes ago, F-UnitMad said:

 

That was my understanding of how to access a helix. It does mean the radii have to be quite generous!!

8 minutes ago, F-UnitMad said:

 

That was my understanding of how to access a helix. It does mean the radii have to be quite generous!!

You still have to get inside it - how does that happen?

  • Like 1
Link to post
Share on other sites

3 minutes ago, F-UnitMad said:

A duck-under, I presume :scratchhead: It's not like it goes all the way down to the floor? 

I'm thinking a helix is used to change levels between 2 sections so it depends how low the lower level is positioned. 

  • Agree 1
Link to post
Share on other sites

  • 4 weeks later...
  • RMweb Premium

Hi there.  I’ve been reading some stuff recently that has made me curious about larger home layouts again, including rereading as an adult about some of the awesome US basement empires that used to enthrall me when reading Model Railroader as a kid.  On top of the obvious things of money and time that I would blissfully overlook when daydreaming as a child, three more strike me these days, and I wonder if they may be helpful:

 

1.  Good health as we get older.  I’ve seen some designs that allow for us becoming less agile in the prime and prime+ stages of life by avoiding narrow aisles, excessive reaches and contortionist-only access spaces.  I’d make this a design criteria.

 

2.  At the risk of appearing to pour cold water on the grand plan, which is not my intention, I note that references are often made in the write-ups of big solo projects noting how far back the work actually began - collecting / making appropriate rolling stock, buildings and sometimes even scenic features or sections sometimes began years beforehand, simply to be ready when the time came.  In a similar vein perhaps, I read recently of a Canadian layout builder who paused his project for 5 years when interest waned, before picking up the build again.

 

So…if starting from scratch (and with a house to build first), my suggestion here would be to have a simple, basic plan that can be up and running fairly quickly, with plenty of options for future details and additions - which I probably wouldn’t even try and design at this stage.  It wouldn’t matter if some of it never gets built - you could still enjoy the bits that are done anyway.  In other words, there can be a difference between a “layout of a lifetime” and a “layout that takes a lifetime.”

 

(And, as a strange plus point perhaps, a train running across plywood can be wherever in the world you imagine it to be.)

 

3.  With apologies for being rather sombre at this point perhaps, but noting the observation earlier that the only dismantling will be left for others to do, it might be wise to design in and document a process for dismantling such that those items that can be salvaged and passed on and / or sold don’t get damaged or thrown out by accident.  It’s the ultimate future proofing perhaps.

 

Don’t know if this helps, but a few thoughts.  Would I start with ‘Continental’ HO?  Absolutely definitely.  Keith.

 

 

  • Like 4
  • Thanks 1
Link to post
Share on other sites

On 03/07/2021 at 21:27, RobinofLoxley said:

You still have to get inside it - how does that happen?

I guess that any lower level storage yard is going to be around 2’ above the floor and possibly higher as there’s no way I could fill the entire area beneath the main benchwork with storage tracks.

Therefore, it would be awkward or very difficult to physically get into the helix but possible, even if it’s not me doing it.

Ideally, any derailments will be quite accessible from the outside of the helix though. With a large radius (1m) helix, I plan to have greater hand access between the levels and also a shallow wall both inside and outside the trackbed to retain stock should the worst happen.

 

All good points, chaps, thanks for your contributions.

John

Link to post
Share on other sites

On 26/07/2021 at 13:13, Keith Addenbrooke said:

Hi there.  I’ve been reading some stuff recently that has made me curious about larger home layouts again, including rereading as an adult about some of the awesome US basement empires that used to enthrall me when reading Model Railroader as a kid.  On top of the obvious things of money and time that I would blissfully overlook when daydreaming as a child, three more strike me these days, and I wonder if they may be helpful:

 

1.  Good health as we get older.  I’ve seen some designs that allow for us becoming less agile in the prime and prime+ stages of life by avoiding narrow aisles, excessive reaches and contortionist-only access spaces.  I’d make this a design criteria.

 

2.  At the risk of appearing to pour cold water on the grand plan, which is not my intention, I note that references are often made in the write-ups of big solo projects noting how far back the work actually began - collecting / making appropriate rolling stock, buildings and sometimes even scenic features or sections sometimes began years beforehand, simply to be ready when the time came.  In a similar vein perhaps, I read recently of a Canadian layout builder who paused his project for 5 years when interest waned, before picking up the build again.

 

So…if starting from scratch (and with a house to build first), my suggestion here would be to have a simple, basic plan that can be up and running fairly quickly, with plenty of options for future details and additions - which I probably wouldn’t even try and design at this stage.  It wouldn’t matter if some of it never gets built - you could still enjoy the bits that are done anyway.  In other words, there can be a difference between a “layout of a lifetime” and a “layout that takes a lifetime.”

 

(And, as a strange plus point perhaps, a train running across plywood can be wherever in the world you imagine it to be.)

 

3.  With apologies for being rather sombre at this point perhaps, but noting the observation earlier that the only dismantling will be left for others to do, it might be wise to design in and document a process for dismantling such that those items that can be salvaged and passed on and / or sold don’t get damaged or thrown out by accident.  It’s the ultimate future proofing perhaps.

 

Don’t know if this helps, but a few thoughts.  Would I start with ‘Continental’ HO?  Absolutely definitely.  Keith.

 

 

Many thanks indeed, Keith this is much appreciated.

1. A very good point indeed and I will follow this up. See above post for brief ideas on dealing with potentially the worst situation.

2. Yes, I’ve been working towards this project for many years! I can’t say that this project was what I had in mind but I always knew I wanted a “big layout” one day. I will be quite happy to simply have a “plywood central” for several years, in all honesty. I simply need to know that I’m working towards my own ultimate layout - that is sufficient.

3. Bang on!

Although this layout is for me, it would be very nice to at least share it with others, maybe here, maybe visitors from elsewhere and there is a complete stock list so my better half will have some idea of the value of it all when I’m not around. She is reasonably involved anyway, not that she’s passionate about any trains themselves but is interested in my philosophy and aims. Also, she won’t accept the plywood central for too long! 
Cheers and thanks again,

John

 

PS My initial passion for a forthcoming British outline 00 gauge loco was only temporary. Compare that with my passion for German H0 trains: 15 years fairly continuously, British H0: similar and US H0: roughly 30 years now! Before this, I was staunchly European H0 with only temporary excursions into 4mm, 7mm, 1/48th etc.

  • Like 2
  • Interesting/Thought-provoking 1
Link to post
Share on other sites

I think its OK to have a slow burning project, and the actual size isnt itself an issue. I know i will stop building every summer for 4 months while my allotment and plant breeding hobby take precedence, then from Sept to Xmas I will enjoy whatever layout building I can fit in. What I would strongly recommend is that from the word go, the first piece of track laid is powered up and that any accessories are installed immediately and also powered up. I have tended to build sections of track without doing this, never again. Its always relaxing to know that if you dont feel like carpentry you can always trot a train up and down a couple of feet of track.

  • Thanks 1
Link to post
Share on other sites

  • 2 months later...
  • RMweb Gold

If you want some ideas for large layouts in different sized/shaped rooms, try Googling bob sprague’s website. He has a gallery with lots of plans. He does quite a few plans for Model Railroader mag. Sorry but don’t know how to add a link… 

 

  • Thanks 1
Link to post
Share on other sites

  • RMweb Gold

Incoming hand grenade! 
 

When planning a model railway perhaps the best starting point is to consider what trains and rolling stock you wish to accommodate.

 

Length of trains …. Number of sidings…. Size of MPD etc

 

These factors will determine infrastructure like length of platforms , sidings and loops …. Which in turn will influence your plan. Otherwise there is a danger that you build a layout that won’t accommodate what you want to run. But no matter how much space you have compromise is inevitable

  • Thanks 1
Link to post
Share on other sites

9 minutes ago, Phil Bullock said:

When planning a model railway

A simple metric is the occupancy of the sidings e.g. I believe that in the coal yard wagons are charged demurrage (fees to the railway company) if they occupy the siding beyond 2 days, the day they arrive and 2 extra days. Good are charged after 1 day, the day they arrive and 1 extra day.

 

Get your head around that and you soon realise that the goods stock is likely higher than you think.

  • Like 2
Link to post
Share on other sites

  • RMweb Gold
5 minutes ago, MR Chuffer said:

A simple metric is the occupancy of the sidings e.g. I believe that in the coal yard wagons are charged demurrage (fees to the railway company) if they occupy the siding beyond 2 days, the day they arrive and 2 extra days. Good are charged after 1 day, the day they arrive and 1 extra day.

 

Get your head around that and you soon realise that the goods stock is likely higher than you think.


Agreed! Is consideration of these issues the difference between a train set and a model of a railway?

  • Like 1
  • Agree 1
Link to post
Share on other sites

I'm in the process of doing 'that' layout as I type this. Started three weeks ago and I'm at the stage of putting noggings in between the new joists of the railway room - it's 3m up in our barn. Arrival of flooring materials is awaited as there seems to be a shortage over here.

 

My plan is fairly big - 7.80m x 6.30m (26' x 21') approximately and has been in gestation for about 4 years. However, the grand plan was formed over 40 (yes - 40!) years and I've had to wait. Really, I've waited too long but it's under way.

 

As @Phil Bullock has said it'll be down to what you want to run that may dictate specific details of your layout. Just because I can, I'm having two prototypical stations, one still exists and has quite short platforms, so short that when HSTs stopped there, the last three coaches were not in station. The other was demolished (probably at the time of Dr B) but had longer platforms that can just accommodate the equivalent of a HST.

 

I shall be having a branch - well two branches that connect at one branchline station - this is my Rule 1 as the branches from the two stations could never have joined up geographically, though the two stations did.

 

What am I going to run? The stock I've collected over the years has been eclectic - again 'just because' - but over the last few years I've become more focussed (but have been known to get side tracked all too easily) and I'm really concentrating on the North - West line and Welsh Marches area but over a long time span - 1922 onwards (thought some stock pre-dates that too). I happen to really like modern block train workings (not for everybody). As they're freight they shan't be stopping at my stations so no need for long sidings BUT  BUT the fiddle yard will be 4.0m long to accommodate the freights (and even then I think it may be tight).

 

Over ambitious? I won't know until it's time to lay the track - I have half of it stock. There is enough to lay at least one continuous circuit right away. I think it's important as it'll be something tangible - something to show - something to allow that stock to stretch its legs after all this time.

 

As for managing the construction of the boards, I'm not having any duck-unders and my access is from below so no doors in the wall. Even though I have no intention of taking the layout to exhibitions (too big and probably not of a high enough standard) it will be modular for ease of access if and when things go wrong (I'm looking at you point motors). Additionally, if and when I pop off, there won't be any need to tear it to bits to take it away!

 

And what led to the design? Just happened to live in the town with the short platformed station and it was geologically interesting and the other I chanced on an old black and white Edwardian photo with two express trains in station and a very busy yard with a mixed branch line train waiting for the right of way. I thought it would make a jolly good model and away it went.

 

I will say that the RMWeb collective were very good (and kind) when I showed the plan, which after a few tweaks and ideas became the final Magnum Opera - Dymented!! Yay :yahoo:

 

Don't wait too long - do it!

 

Cheers,

 

Philip

  • Thanks 1
Link to post
Share on other sites

  • 3 weeks later...
On 04/10/2021 at 20:20, Phil Bullock said:


Agreed! Is consideration of these issues the difference between a train set and a model of a railway?

 The difference is between a consciously adult hobbyist modeller and a buyer of a ready boxed shop item. Many of the latter have turned into the former, I daresay.

 

As for the starting point, most people choose era/location first in order to work out what stock might be appropriate. I think that many select OO without really looking at alternatives - based on that boxed item. But gauge is hugely important as its a factor of usable space even in a large layout scenario.

 

I am still building my round the loft effort, Mk2, but my thinking processes about train size were based on blocks. It would be possible to have quite long trains in my case, but occluding beams in the space mean that one of the typical side-on panoramic presentations for a long train, which is even used in exhibition layouts, doesn't really work. My views such as I will have are where trains are coming round quite sharp curves and appear in view in a quite narrow frame, so the train length makes little difference. So what I did was look at the relationship between what i could build in for platform length in the stations against the length of the major track blocks that would be possible for the longer sections of track between the stations; so having 5/6 coach trains, how they could be managed around blocks of similar length. The run-around section has 15 blocks longer than the longest train (including a through station) plus 2 terminus stations. So I could have maybe 7 trains in motion in each direction, quite a lot of stock i dont have yet, particularly as Im converting to DCC there's going to be a fall-out rate amongst the loco stock.

 

Now I didnt know when I returned to the hobby 4 years ago that I was going to need all that stock, as I hadnt got my head round DCC and automatic train control. So I couldnt have started collecting for it. At least my family knows what to buy me for Christmas, although they werent very impressed to be asked for a Dijikeijs DR4088

 

 

  • Like 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...