Jump to content
 

Peterborough North


great northern
 Share

Recommended Posts

"There follows a rant. Why is it that people assume that everyone has a ****** mobile phone? I want to confirm a date for installation of a smart meter. Log on, and I get a requirement for a phobile moan number. "Required field" it says. I type in "no mobile", but it won't have that, so I have to go and phone them, which means waiting ages for someone to answer. :ireful:And why do I have to scroll so far down the list of emoticons to find this one? It should be right at the top.  :angry:  So should this one."


 


Fully Agree!!


 

Perhaps your new smart meter requires you to check in by mobile phone.

 

Great Pictures, my daily dose of North/Eastern Images.

A GWR/SR fan.

Link to post
Share on other sites

There follows a rant. Why is it that people assume that everyone has a ****** mobile phone? I want to confirm a date for installation of a smart meter.

 

You'd think that a smart meter installation would be a one-off occurrence - Ohhhh no !!

 

We were given a smart meter as a feature of our new electricity supplier's service a couple of years ago - supplier chosen after a price comparison.

 

Last year that supplier was cheapest again - so we stayed with them.

 

This year they were nowhere near the cheapest, so we swapped.

 

Trouble is - it seems that the type of smart meter provided by one supplier is probably not compatible with another supplier - so there will be "a loss of functionality".

 

We presume this gobbledy-g**k means that it'll be back to inputting meter readings manually.

 

The government touts smart meters and regular price comparison / supplier change as benefitting the consumer - in reality, they're a means of ensuring that you don't swap suppliers!

 

How much government time would it take to legislate that all suppliers must use mutually compatible smart meters?

 

That's MY rant over.

 

Regards,

John Isherwood.

 

Editted because the system won't allow me to type g**k with 'oo' !!

Edited by cctransuk
  • Like 3
Link to post
Share on other sites

  • RMweb Premium

 

"There follows a rant. Why is it that people assume that everyone has a ****** mobile phone? I want to confirm a date for installation of a smart meter. Log on, and I get a requirement for a phobile moan number. "Required field" it says. I type in "no mobile", but it won't have that, so I have to go and phone them, which means waiting ages for someone to answer. :ireful:And why do I have to scroll so far down the list of emoticons to find this one? It should be right at the top.  :angry:  So should this one."

 

Fully Agree!!

 
Perhaps your new smart meter requires you to check in by mobile phone.
 
Great Pictures, my daily dose of North/Eastern Images.
A GWR/SR fan.

 

 There's no need at all to have a mobile to deal with them. The nice young lady I spoke to eventually was just a bit surprised that not everyone had got one.

  • Like 1
Link to post
Share on other sites

I have TBH i really do rely on my mobile- I have it synced in to email, notes, phones and web passwords so I effectively have a mini version of my laptop in my pocket.

 

Nowadays I even get told off by SWMBO if I don't have it and she wants to know more about a plant she has just seen for the first time int he garden centre!

Link to post
Share on other sites

  • RMweb Premium

You'd think that a smart meter installation would be a one-off occurrence - Ohhhh no !!

 

We were given a smart meter as a feature of our new electricity supplier's service a couple of years ago - supplier chosen after a price comparison.

 

Last year that supplier was cheapest again - so we stayed with them.

 

This year they were nowhere near the cheapest, so we swapped.

 

Trouble is - it seems that the type of smart meter provided by one supplier is probably not compatible with another supplier - so there will be "a loss of functionality".

 

We presume this gobbledy-g**k means that it'll be back to inputting meter readings manually.

 

The government touts smart meters and regular price comparison / supplier change as benefitting the consumer - in reality, they're a means of ensuring that you don't swap suppliers!

 

How much government time would it take to legislate that all suppliers must use mutually compatible smart meters?

 

That's MY rant over.

 

Regards,

John Isherwood.

 

Editted because the system won't allow me to type g**k with 'oo' !!

I'd heard about that problem, John, and I did consider telling them where they could put their meter. I'll try it though, as this year's renewal was a fair one. If next year's isn't, and I want to change supplier, then a new smart meter will be low on the priority list.

Link to post
Share on other sites

I got a call from one of our tenants last week asking if we could put p the heating in the office as she was cold.

 

I asked her if she had checked the thermostat.

 

"What's that?" she asked

 

I described it , where it was located and how to use it.

 

"Wow, like a physical version of my Hive app. How cool is that?" she  said.


I'd heard about that problem, John, and I did consider telling them where they could put their meter. I'll try it though, as this year's renewal was a fair one. If next year's isn't, and I want to change supplier, then a new smart meter will be low on the priority list.

This is a widely recognised problem - which is why we don't have a smart meter!

  • Like 1
Link to post
Share on other sites

  • RMweb Premium

I got a call from one of our tenants last week asking if we could put p the heating in the office as she was cold.

 

I asked her if she had checked the thermostat.

 

"What's that?" she asked

 

I described it , where it was located and how to use it.

 

"Wow, like a physical version of my Hive app. How cool is that?" she  said.

This is a widely recognised problem - which is why we don't have a smart meter!

What is an "app", please?

Link to post
Share on other sites

  • RMweb Premium

The Up slow has been unavailable for some time, owing to a defective point, but it too received the Wright treatment, and so this WD can again trundle along, leaving the main line clear. First it passed the waiting A2.

attachicon.gif515 and WD.JPG

This one was very difficult to deal with, as the angle of incoming light made the ballast too conspicuous. Very difficult to get a good colour balance, and it shows up bits that I missed too. Moving on a few yards further, the WD next encounters Champion Lodge, which has detached from the Ely, and is starting to move away.

attachicon.gifWD and 1643.JPG

Again, very difficult light, and not the most succesful effort.

I didn't know that there was a loco named after two types of spark plug....

Link to post
Share on other sites

 

 

There follows a rant. Why is it that people assume that everyone has a ****** mobile phone? I want to confirm a date for installation of a smart meter. Log on, and I get a requirement for a phobile moan number. "Required field" it says. I type in "no mobile", but it won't have that, so I have to go and phone them, which means waiting ages for someone to answer. :ireful:And why do I have to scroll so far down the list of emoticons to find this one? It should be right at the top. :angry:  So should this one.

 

I agree Gilbert.I do have a phone, it's only used when I am away from home, to keep in touch with the wife. It doesn't even have a camera and for the life of me I haven't the foggiest what the number is. It cost me £15-00 three years ago and costs me about £10-00 a year to run on pay as you go!!!!

  • Like 3
Link to post
Share on other sites

 

There follows a rant. Why is it that people assume that everyone has a ****** mobile phone? I want to confirm a date for installation of a smart meter. Log on, and I get a requirement for a phobile moan number. "Required field" it says. I type in "no mobile", but it won't have that, so I have to go and phone them, which means waiting ages for someone to answer. :ireful:And why do I have to scroll so far down the list of emoticons to find this one? It should be right at the top. :angry:  So should this one.

You want a smart meter but don't own a mobile phone - I would have thought the latter was of more use and more critical for golfing appointments.

 

Do you know the software currently installed on them (the meters not phones) may not allow you to change supplier without installing another meter, personally I would wait till the next generation meters appear in a couple of years.  The whole scheme is a farce, the first meters may not be able to take a software upgrade to allow supplier migration, the later meters may allow it but all have to be replaced in the next couple of years because of known technology changes which will mandate a wholesale replacement of the meters installed before.  And we're all paying for this in our bills, not the government (us via taxation) or the energy companies.  The only reason they are peddling these meters is some short sighted government belief that being able to see how much energy your kettle or heating uses will make you think about a cold drink or a jumper.

Link to post
Share on other sites

G'Day Folks.

 

Just come across this photo, it's a train heading to Little Barford power station, which is of interest, but the signal is also of interest, this pics was taken in 1958, is that a Somersault signal on the platform ????

 

manna

post-19471-0-62014700-1512683256.jpg

  • Like 15
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...