Jump to content
 

Hemerdon Bank


pirouets

Recommended Posts

  • RMweb Gold

So 9 more months have past but some small progress has been made. In the first picture you can see I have started on putting some scatter to represent the leaves starting to drop. I am also looking at how to represent some fallen branches. Otherwise its all just a biut clean and looks like a perfectly looked after lawn.

 

post-773-0-00673500-1420115417_thumb.jpg

 

Looking down the line I have completed the hedgerow on one side along with a bush on the other side. Key with this is to try and fine the right colours to show the green starting to brown off. I still need to look at what will form the lineside barrier below the line. The pictures I have seem to show it more as a wire fence.

 

post-773-0-79805600-1420115420_thumb.jpg

 

Finally something that really tested my eyesight was getting the farm buildings done. I do wonder if I am at the point where going up a scale might be the next step. Jobs round these buildings include making sure they are grounded properly and the flower beds in fron of the farm house.

 

post-773-0-31072100-1420115422_thumb.jpg

 

Always still amazed that the simplest layout i have built has taken me over 4 years so far. Having said that I jotted down a list of tasks I need to crack on with to help me focus a bit more and it looks like this

 

TIDY SHED :boredom:

change 1st point motor on back left fiddle yard

Plant fence posts between path and edge of baseboard

Add farm gate off ledgate lane

Add fence either side of farm track from ledgate lane to farm house

Plant tree in field

Plant trees alongside ledgate lane

Add shrubs to banks between bridges

Add lineside fencing

Lay ground cover in courtyard

Add flower beds to courtyard

Add garden behind farm house

Fit point work at London end to allow connection to terminus

Make trees for parkside farm

Add Trees to parkside farm

Make trees that will go below the track

Add trees below track

Make trees that will go above the track

Add trees above track

Create interim time table for stock I have

Create end state time table for stock as it needs to be

 

Might keep me busy.

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.


×
×
  • Create New...