Pete Harvey Posted October 7, 2009 Share Posted October 7, 2009 This topic is to show the design progress of products after they have gone through the initial design stages. Please remember that these images are from Computer Aided Design software are not to any scale and are to show a visual illustration of the product. I will not be posting images of all of my forthcoming products but I will be posting images of some. Class 37 Steps Pete Link to post Share on other sites More sharing options...
28ten Posted October 8, 2009 Share Posted October 8, 2009 That's really interesting, what application are you using? Link to post Share on other sites More sharing options...
iak Posted October 12, 2009 Share Posted October 12, 2009 Ooooo... Dribbling ensues :icon_drool: When are looking at these beauties appearing then? Link to post Share on other sites More sharing options...
Pete Harvey Posted October 12, 2009 Author Share Posted October 12, 2009 Ian They Should be ready all being well buy the end of the month they will be ??3.24 per set with ??1.00 p+p. Remember that they are very small and until fitted will be very delicate the 3.3mm wide on the top step and you will need a Hold & Fold tool of some kind to build them. When they are ready for sale I will post some pictures on my web site of them built and fitted to a model. Pete Link to post Share on other sites More sharing options...
D400 Posted October 15, 2009 Share Posted October 15, 2009 Those look superb Pete - defiantly will be ordering several sets. Link to post Share on other sites More sharing options...
Pete Harvey Posted November 6, 2009 Author Share Posted November 6, 2009 Hello Here is a product I'm working on at the moment. Purchased as one set you would get two sets of blades and a set each of mounting brackets for each loco. They have been designed for the Bachmann 37, 47 & 20 and the Hornby 31 and should make it easier to mount on to the respective loco chassis. I have no idea of price yet as I still have a few design things to take care of but they should be ready in time for Christmas or the middle of January. Pete Link to post Share on other sites More sharing options...
Guest Digital Posted November 6, 2009 Share Posted November 6, 2009 Look great Pete and a welcome addition to your range. Are they only going to be for "OO" gauge or will you be making any for other gauges? John Link to post Share on other sites More sharing options...
RMweb Gold Ramblin Rich Posted November 6, 2009 RMweb Gold Share Posted November 6, 2009 Those snow ploughs look very useful. Could I suggest doing the deflector plates for 150 / 153 sprinters as a follow on? Link to post Share on other sites More sharing options...
Pete Harvey Posted November 6, 2009 Author Share Posted November 6, 2009 John As with all of my products I will produce them for other scales as one off's or as production runs as long as there is a demand. Rich I'm looking at doing those in the future. Pete Link to post Share on other sites More sharing options...
Pete Harvey Posted January 15, 2010 Author Share Posted January 15, 2010 Two New Items for 2010 The First is some 4mm scale 1m Square Depot Baskets each etched fret has four baskets on it. The Second are a set of six PortaKabin Window Security Grills to suite the "Knightwing" Portkabin Kits. For more information on these and my other Product Developments please visit my web site? Pete Link to post Share on other sites More sharing options...
Pete Harvey Posted April 16, 2010 Author Share Posted April 16, 2010 I Have been working on some replacement items for the Dapol Silver Bullets not that they are out. They will use the Dapol supplied hand rails for the steps and the top deck, rod will be needed for some of the steps but not all, the steps at either end will be produced as well and some other items to improve the model. Pete Link to post Share on other sites More sharing options...
mike knowles Posted April 19, 2010 Share Posted April 19, 2010 I Have been working on some replacement items for the Dapol Silver Bullets not that they are out. They will use the Dapol supplied hand rails for the steps and the top deck, rod will be needed for some of the steps but not all, the steps at either end will be produced as well and some other items to improve the model. Pete Superb just what we need. ETA? Link to post Share on other sites More sharing options...
Pete Harvey Posted April 19, 2010 Author Share Posted April 19, 2010 Hi Mike I'm nearing completion on the design stage, so you are probably looking at the middle of May unless a major redesign is requires. At present all you will need to get as well as the model is some roding for the tank side ladders and tank lid spindle. I will be posting pictures of the test etches fitted to a model before the release of the detail set. Pete Link to post Share on other sites More sharing options...
saizei Posted April 19, 2010 Share Posted April 19, 2010 Hi There Pete, are you still working on the network rail 150 upgrade parts as i would really like to see them come out? thanks Gary Link to post Share on other sites More sharing options...
Pete Harvey Posted April 20, 2010 Author Share Posted April 20, 2010 Yes I still plan to release the conversion kit for the 150 hopefully it will be latter this year. Pete Link to post Share on other sites More sharing options...
Guest jim s-w Posted April 20, 2010 Share Posted April 20, 2010 You'd better I have been telling the people hassling me for it to talk to you! Cheers Jim Link to post Share on other sites More sharing options...
Pete Harvey Posted April 20, 2010 Author Share Posted April 20, 2010 Thank you Jim. Pete Link to post Share on other sites More sharing options...
Pete Harvey Posted April 23, 2010 Author Share Posted April 23, 2010 As the question has been asked in another forum area my replacement steps and walk way for the Dapol Silver bullets will be 37 mm apart at the lowest point where the Dapol ones are 40mm apart. As mentioned before I should have these for release buy the middle of May. Also I will be selling them at a reduced rate for customers that order four or more at a time. Keep checking my website for details on this product. Pete Link to post Share on other sites More sharing options...
43179 Posted April 29, 2010 Share Posted April 29, 2010 Hi Pete - could your Silver Bullet steps be scaled down for the N gauge version when it comes out? TFN Jon Link to post Share on other sites More sharing options...
Pete Harvey Posted April 29, 2010 Author Share Posted April 29, 2010 Hi Jon I can say it would be possible but whether they could be put together I could not say ad the material would be very thin indeed. Pete Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.