Here's some good news for the railways of South Devon.

 

First, here's a photo of a very cold and neglected Heathfield station taken in January this year:

 

post-57-0-27426200-1308515073_thumb.jpg

 

 

...and here's a photo of an equally woebegone Teignbridge Level Crossing, taken the same day:

 

post-57-0-52676200-1308515113_thumb.jpg

 

What's good about all this is that the line has recently been de-mothballed and is now in operational status again, waiting for the first weekly train of timber to take place in a few weeks time. Colas Rail have got a contract to take timber from South Devon plantations up to Chirk, to be turned into chipboard and the like.

 

The timber will be taken by road to Teignbridge yard and the train will then load and convey it onwards.

 

The operation will be run to Newton Abbot, run round, run to Heathfield, run round and then down to Teignbridge, load up, run to Newton Abbot, run round, and then up north.

 

We are in the process of warning locals that the railway is operational once more and not to be tempted to trespass!

  • Like 4
Link to post
Share on other sites

  • RMweb Gold

Good news is this a sign that the economy has started to recover?

Well, this development is actually six months old, perhaps the demand for chipboard is increasing, but I understand that it's a case of the plantation owners seeking cheaper transport and also meeting 'green' obligations etc.

Link to post
Share on other sites

  • RMweb Gold

Well, this development is actually six months old, perhaps the demand for chipboard is increasing, but I understand that it's a case of the plantation owners seeking cheaper transport and also meeting 'green' obligations etc.

 

Yeah 1 train being the same as 50 lorries. Good news though.

Link to post
Share on other sites

  • RMweb Gold

Apparently Colas Rail locos have been seen route learning in South Devon (albeit not by me). Nice to see a smaller freight operator growing their business as well.

 

And of course Colas already work into Chirk (Kronospan) from Carlisle / Ribblehead 6 days per week. The interesting conundrum is the sidings at Chirk can only be accessed by Southbound trains, so a run round will be required or a routing via Crewe / Chester perhaps.

 

Time will tell when the paths enter the system.

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Great news, Dave Harding at Exeter Model Shop had hinted this might be in the offing but it's good to get confirmationgood_mini.gif Finally a bit more freight through Exeter and Newton Abbot. biggrin.gif

 

I might be wrong but Tim probably told him! wink.gif (He seems to be in there a lot buying things for John!)

 

Regards,

Link to post
Share on other sites

  • RMweb Gold

Wish something would happen on the Cattedown branch.

Official status of that branch is that it is mothballed, pending any possible freight useage requests in the future.

 

Of course, the track only extends as far as the scrap loading area adjacent to the boat yard, the track beyond there to the former bitumen depot was removed shortly after it ceased to be used.

  • Like 1
Link to post
Share on other sites

Track is in good condition and the branch has survived the new Londis Supermarket development. Lifting barriers and equipment of the level crossing beyond the scrap yard has been removed recently. I can't see why scrap isn't still taken. The scrap yard is busy. I noted on Bing maps ariel photo that a 66 was probably the last loco down the branch.

Link to post
Share on other sites

  • RMweb Gold

I can't see why scrap isn't still taken. The scrap yard is busy. I noted on Bing maps ariel photo that a 66 was probably the last loco down the branch.

Simply the customer (for the moment) is using road transport, which is his choice. I would agree re the 66 being the last loco down the branch. With any luck, one of them will be the first back down there, if traffic were to resume.

Link to post
Share on other sites

  • 5 weeks later...
  • RMweb Gold

Do you know why stopblocks are in place at Teignbridge if trains are going to have to run to Heathfield for the loco to run round?

There's a track fault through the level crossing, which will be dealt with prior to the start if timber traffic (latest estimated date for start is now later in August). In the meantime, the branch is closed beyond the sleeper barrier.

Link to post
Share on other sites

There's a track fault through the level crossing, which will be dealt with prior to the start if timber traffic (latest estimated date for start is now later in August). In the meantime, the branch is closed beyond the sleeper barrier.

 

That's good news, I might be able to get down there to photograph it as I am off work. The barrier doesn't look terribly imposing or final does it?

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...