Jump to content
 

Heathfield branch developments


Recommended Posts

'A new timber flow, operated by Colas Rail, will commence operation on Wednesday December 7th 2011. Trains will run twice weekly to and from Teignbridge on the Newton Abbot to Heathfield line, and the contract will run for three years.'

 

The News above was reported on the SWRG forum today. Times are not available yet.

Link to post
Share on other sites

  • RMweb Gold

There is no rail freight facility at Heathfield these days, and precious little land left to implement any such scheme. The oil depot was closed circa 15 - 20 years ago, and the last clay trains ran circa 8 - 10 years ago (although the Imerys facility appears to be essentially intact when viewed from the track).

 

Essentially access to the old station is via an industrial estate, and I am unsure of the rights of members of the public to access across it, although fortunately NR retains legal access rights to the line there.

 

The timber train will run down to Heathfield purely to run round, and will then draw down to Teignbridge Level Crossing, where the timber loading pad has been constructed.

 

Although there is a public road across the railway at Teignbridge, the railway land remains private, and I would advise anyone going to the level crossing to watch the train to take extreme care, due to the amount of road traffic that passes over it, especially during the 'rush hour'. For a country road, it is very busy!

  • Like 3
Link to post
Share on other sites

  • RMweb Gold

From Chirk on a Tuesday and to Chirk on a Wednesday is what I've been told.

 

Guessing to Shrewsbury then Crewe then via Chester to Chirk, return straight from Chirk - Shrewsbury and return via whatever route.

Link to post
Share on other sites

  • RMweb Gold

66847 and 6Z41 (14 KFA) due to leave Chirk in about 30 mins, heading to Gloucester today, it's starting ... :sungum:

 

via Walsall and the Lickey.

 

Ta to various

Wagons will lay-over in a yard en-route and will arrive in South Devon on Monday early afternoon.

 

Timber already being stacked at Teignbridge -see following post.

Link to post
Share on other sites

  • RMweb Gold

I visited the site today and found that the stacking of timber had already started, in preparation for next weeks first train.

 

The extent of the site:

post-57-0-28094800-1322759377.jpg

 

post-57-0-65119700-1322759414.jpg

 

Lorries unload on this side and turn round the end of the stack to exit the site:

post-57-0-31434100-1322759434.jpg

 

Another lorry arriving whilst I was there:

post-57-0-05798000-1322759496.jpg

 

post-57-0-80305500-1322759522.jpg

 

You have been warned!

post-57-0-04892400-1322759537.jpg

 

First (blue) lorry making ready to depart, second lorry starting to unload:

post-57-0-53386800-1322759558.jpg

 

post-57-0-99423000-1322759572.jpg

  • Like 6
Link to post
Share on other sites

Ok so the lorries are fitted with Hi-habs to unload themselves, so how is it proposed to load the train?

 

Gordon A

Bristol

With the self-same HIABs, I should imagine- most timber terminals seem to work by building up a stock of timber on the ground, sufficient to fill a train, then using one or two of the lorries to load the train. The trains on this contract are only weekly, at best, so it's hardly worth getting in a specialist loader.

Link to post
Share on other sites

  • RMweb Gold

Don't know how permanent that Alphington situation will be at the moment, we are still awaiting more info from GBRF...

 

The loading at Heathfield is confirmed as being done by one or two of the road lorries, as stated above.

 

There is a lot of timber in South Devon, this is a 3 year contract to begin with!

  • Like 1
Link to post
Share on other sites

This little branch seems to have more life's than the average cat! How many times has a 'last train' run? Who'd have thought that when it closed to passengers in the late 50s that 50years later it would be running new flows having survived the loss of general goods, oil and clay (more than once).

 

I know people have mused on Heathfield as inspiration for a 80s ish model - if you warp time a little and add the traffic together then clay, oil and timber would make for some interesting operations and traffic. Good variety of locos seen in photos, from 08 to 66s. Something else to ponder on...

  • Like 2
Link to post
Share on other sites

First train of empties passed Teignmouth bang on time today (thanks Tim!) with shiny Colas 66847 on the front. Unfortunately work prevented me going to see it starting up the branch from Newton.

 

post-6669-0-66219700-1323099849.jpg

 

post-6669-0-37884600-1323099852.jpg

 

post-6669-0-96458000-1323099854.jpg

 

post-6669-0-14456900-1323099858.jpg

 

post-6669-0-62633700-1323099860.jpg

 

post-6669-0-34519900-1323099862.jpg

 

Five minutes earlier this NR RHTT came by - I don't think I've seen such a frequency of non-passenger trains on this line! 66061 and 66139.

 

post-6669-0-30886700-1323099940.jpg

 

post-6669-0-74976000-1323099942.jpg

 

post-6669-0-14167500-1323099945.jpg

 

post-6669-0-20490600-1323099947.jpg

  • Like 7
Link to post
Share on other sites

  • RMweb Gold

Great photos in nice conditions, Rod. Hadn't realised the sun was out until I looked out the window at lunchtime!

Will you be able to get the return set as well? Supposedly a fine day again tomorrow (but I have no idea on actual timing...)

Link to post
Share on other sites

  • RMweb Gold

Here are some photos from yesterday, when I was there in an official capacity:

 

6Z50 arriving at Newton Abbot - note the relatively high level of interest!

post-57-0-61032900-1323203334.jpg

 

I was provided with a cab permit, so rode on the train along the branch (photos taken with permission) - just outside Newton Abbot station on the branch:

post-57-0-06733300-1323203472.jpg

 

Sylvan scene just north of Newton Abbot. Very picturesque in the winter sunlight, some parts of the branch reminded me of what the Wenfordbridge line must have been like as it wound it's way through the woods:

post-57-0-09125800-1323203486.jpg

 

Approaching Teignbridge LC:

post-57-0-03792400-1323203555.jpg

 

Waiting for the level crossing gates to be opened:

post-57-0-03080700-1323203575.jpg

 

Walking back up to the cab after the train had drawn clear of the level crossing:

post-57-0-34098400-1323203617.jpg

 

Approaching Teigngrace level crossing:

post-57-0-20948900-1323203648.jpg

 

The remains of Teigngrace Halt:

post-57-0-34861800-1323203671.jpg

 

More views in the woods:

post-57-0-03890700-1323203699.jpg

 

post-57-0-88806800-1323203728.jpg

 

post-57-0-61392600-1323203756.jpg

 

The approach to Heathfield. The disused connection to the ball clay works is on the left (the first set of points):

post-57-0-09482300-1323203773.jpg

 

A38 bridge at Heathfield:

post-57-0-93701600-1323203818.jpg

 

Waiting to run round:

post-57-0-21025700-1323203848.jpg

 

Starting the run round. Photo taken from old Down platform at Heathfield station:

post-57-0-08505200-1323203871.jpg

 

post-57-0-36884600-1323203911.jpg

 

Ready to start back towards Teignbridge:

post-57-0-15977400-1323203931.jpg

 

The view as we approached Teignbridge on the return trip:

post-57-0-34220700-1323203969.jpg

 

Train about to pass over the level crossing:

post-57-0-93394600-1323204006.jpg

 

Train positioned next to logs:

post-57-0-86861400-1323204069.jpg

 

post-57-0-04502500-1323204101.jpg

  • Like 18
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...