Your ability to deliver such consistency so (seemingly) effortlessly is a credit to your skills, Ron! :good:

 

Cheers

 

Scott

Hi, Scott

 

Thanks, much appreciated

 

Still not enough fingers, or perhaps too big - use of tweezers a bit fiddly, but getting there all the same

 

Cheers

 

Ron

Link to post
Share on other sites

Starting the cross-braces to the internal arch bracings -

 

post-10633-0-66678900-1354377772_thumb.jpg

Components for each internal bracing assembly

 

post-10633-0-80042400-1354377826_thumb.jpg

Fix first cross-brace to one side of the centre of the bracing piece

 

post-10633-0-98425000-1354377852_thumb.jpg

Fix the second cross-brace

 

post-10633-0-37673700-1354377879_thumb.jpg

Rotate the workpiece 180o , and fix the remaining two cross-braces

 

post-10633-0-76336400-1354377909_thumb.jpg

A few finished bracing assemblies

 

post-10633-0-98116400-1354377927_thumb.jpg

The first internal bracing fixed in the arch

 

post-10633-0-05906700-1354377965_thumb.jpg

The second bracing fixed in the arch

 

post-10633-0-95181400-1354379022_thumb.jpg

These two bracings oppose each other at the arch apex

 

- now to complete the remaining bracing assemblies and fix in place

 

Edit: Replaced out-of-focus picture

Link to post
Share on other sites

All 26 of the 4 set cross-braced internal bracings completed -

 

post-10633-0-27434200-1354561357_thumb.jpg

 

post-10633-0-13901800-1354561385_thumb.jpg

Near end of arch - Five 5 set cross-braced internal bracings required to complete this end

 

post-10633-0-79534900-1354561425_thumb.jpg

Far end of arch - Five 5 set cross-braced internal bracings required to complete this end

 

- that makes ten 5 set cross-braced internal bracings required to complete this final arch structure

Link to post
Share on other sites

The third arch is now completed -

 

post-10633-0-06244300-1354646466_thumb.jpg

Third & Second arches (third in front)

 

post-10633-0-63819100-1354646499_thumb.jpg

Close-up of end of third arch

 

post-10633-0-33388100-1354646519_thumb.jpg

Detail showing the 4 set & 5 set cross-bracings in the internal bracings

 

- next is to produce the bridge abutment bases fitted to a baseboard

Link to post
Share on other sites

It looks like I am going to have to scratch build the stonework on the bridge abutments, as suitable embossed material is not available to match the prototype -

 

post-10633-0-50064000-1354732883_thumb.jpg

 

The basic stone blocks are 6mm x 3mm in 4mm scale

 

The choice of media is plaster, clay or plastic - so a few trials and tests will be required

Link to post
Share on other sites

Hi Ron, I have been marvelling at your amazing construction works for quite some time and may be able to help with an idea for the stonework.

 

My father wrote an article for Model Railway Journal entilted "Stoned every night" which was published in magazine 103. If i rememer correctly (I should look it out really!) he cut strips of plasticard to the required height from slightly different thicknesses of plasticard for example a 6mm strip of 20, 30 and 40thou. Then cut these into the relevant stone widths. When laid onto the base wall individually the sizes were mixed up to give the different relief of the stones. When the glue had dried he then scraped the joints with a rounded scalpel blade with the blade facing towards the centre of the stone and the point in the mortar gap. This effect can also be varied to create different amounts of curvature on the individual stones. Its a bit time consuming, but if you can manage to cut and install all those structural braces it should be fairly straight forward for you!

 

Hope this helps.

Link to post
Share on other sites

Constructed the baseboard complete with blocks for the base of the abutments

 

post-10633-0-63831100-1354986172_thumb.jpg

The central arch and deck fitted on the abutments

 

post-10633-0-94137400-1354986199_thumb.jpg

Second arch fitted - The deck will straighten out when all the hangers are installed

 

post-10633-0-87800000-1354986228_thumb.jpg

 

post-10633-0-03338400-1354986256_thumb.jpg

 

post-10633-0-76205500-1354986286_thumb.jpg

 

post-10633-0-24068200-1354986315_thumb.jpg

Third arch fitted

 

post-10633-0-59334100-1354986346_thumb.jpg

 

post-10633-0-74027900-1354986373_thumb.jpg

 

post-10633-0-41742700-1354986406_thumb.jpg

 

- next the arch to arch cross bracings (horizontal & vertical)

Link to post
Share on other sites

That is looking wonderful. I looks as though a train is not going to effect it at all.

Hi, Peter

 

I think the train loading test will be soon, although not on any track (I don't yet have any track components to construct a length of straight track, and I don't intend to use any proprietary track system)

 

Cheers

 

Ron

Link to post
Share on other sites

Waiting for outstanding delivery of some styrene to complete the over-arch cross-bracing, so fixed the central arch suspension hangers and completed the deck plating -

 

post-10633-0-44862200-1355143304_thumb.jpg

 

Plated the underside of one end of the deck at its the abutment

 

post-10633-0-47619200-1355143278_thumb.jpg

 

post-10633-0-92570500-1355143328_thumb.jpg

 

- and then fitted two suspension hangers on the outer arches at approx. central positions, and loaded the bridge with two steam locos (Standard 9 2-10-0 & Standard 7 2-6-4)

 

post-10633-0-04039800-1355143353_thumb.jpg

 

post-10633-0-15455000-1355143377_thumb.jpg

 

post-10633-0-32212300-1355143401_thumb.jpg

 

Test shows the hangers will be strong enough to support the deck and its intended loading

 

Edited: for missing words

Link to post
Share on other sites

If anyone notices a shortage of some sizes of styrene strip, Ron's various threads might just be the reason why.......

Everytime I place an order the retailer has to advise me that he needs to reorder to fulfil my order, so the delivery takes longer than normal

 

But no doubt it would be just the same if went into the shop (if I was in the UK)

 

I can understand that plastic strip is not necessarily a high demand item, so stocks are kept to a minimum - then along comes an oddball, someone like me :scratchhead:

 

Anyway, time is not a problem - I have plenty of items under construction

Link to post
Share on other sites

Hi Ron

 

Have you consumed / used up the normal bridge test weights?

 

SS

Unfortunately, my stock is very low at present. Although coming weekend should replenish it ready for the Xmas/New Year celebrations

 

Will need to construct a harness of some form, as the deck is too narrow to hold any can or bottle

 

An idea is forming - will be back with a possible solution :drinks:

Link to post
Share on other sites

Because of the string harness, Ron, your fluid loading (above) appears a lot more concentrated (no pun intended!) than the BR Standard's - even if they had been the same mass. I'd suggest you could probably run a pair of K's whitemetal Garratts across and not overload your structure. Well done!

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.


×
×