Jump to content
 

Spenford Halt 0 Gauge


spenc

Recommended Posts

Hi Everyone
This is my new layout as i used to model in 00 i have now bit the bullet and gone up a gauge.I have got a class 33 kit which i am building and a southern signal kit nearly built.Yesterday built 3 baseboards to give a total space of 15ft x 1ft 6in max area i can play with.Hopefully its going to be a terminus station with 3rd rail so i can run 2EPBs & 2HAPs.With a small goods yard set in 80s/ early 90s.Still got to play about with track plan could only get 4 lengths of track & 2 points as thats all Buffers had so could be a trip to peco.The wife has told me this is the last one i can do she said i am banned from buying modeling mags & going on RMweb because i see something & want to change mine :mail: Heres some pictures of wots been done so far any comments welcome
Steve
post-11944-0-65579800-1334665166_thumb.jpg
post-11944-0-89560400-1334665233_thumb.jpg
post-11944-0-16281000-1334665302_thumb.jpg
post-11944-0-11993300-1334665369_thumb.jpg
post-11944-0-88151300-1334665442_thumb.jpg

Link to post
Share on other sites

The wife has told me this is the last one i can do she said i am banned from buying modeling mags & going on RMweb because i see something & want to change mine

 

Hi Steve,

 

I can only commiserate with you about the above. I'm sure many of us have been there and (sort of) survived.

 

Brave soul going 7mm but an 08 is a great temptation to make the jump.

 

terminus station with 3rd rail so i can run 2EPBs & 2HAPs.With a small goods yard set in 80s/ early 90s.

 

Nah! go green and blue 70's, a nice 2 car Hampshire or dare I mention 121 unit, a couple of 33's, a Hymek(!).

 

Will get the popcorn out on this one.popcorn.gif

 

Cheers

Stu

Link to post
Share on other sites

Hi Stu

80s/90s best time for me. 08 is on order 2 Hampshire is on the list to get. Be hard to get them in the house.I will up date some pictures later of wot should be here tomorrow.got to sort some legs out.

Steve

Link to post
Share on other sites

Hi Everyone

Nothing done on the layout today bizzy at work. New arrival came today Heljan class 33 connected 3 lengths of track runs great.So its well done to Tower models at the door in less than 24hrs.got to get some number transfers wot number to give it ? Heres some pictures.

Steve

post-11944-0-27539200-1334776578_thumb.jpg

post-11944-0-61736100-1334776664_thumb.jpg

post-11944-0-33265200-1334776741_thumb.jpg

post-11944-0-78696800-1334776824_thumb.jpg

Link to post
Share on other sites

Hi Scott

It getting there need to make some legs now not got a day of till monday & tuesday so will just have play with the 33.The 33 kit i got is taking longer to build.

Steve

Link to post
Share on other sites

Hi everyone

Bit of progress over the last few days made the 4 trestles started laying some track & points now waiting for the rest on order from Buffers.Started making a list of wot i need its never ending.Heres some photos.

Steve

post-11944-0-85486400-1335305824_thumb.jpg

2 of the trestles

post-11944-0-98645900-1335306069_thumb.jpg

Looking towards the fiddle yard

post-11944-0-68976900-1335306184_thumb.jpg

Line on left short siding

post-11944-0-03584000-1335306307_thumb.jpg

Track laid to first platform

post-11944-0-00280500-1335306486_thumb.jpg

Another point to go in to the right of 33.

Link to post
Share on other sites

Hi Stephen

Funny you should say that when i first put the boards up i joined some track together wired it up sent the 33 down Dc controller i used not as good as my DCC Gaugemaster stopped about 10cm away from tv.Just see on insurance claim tv hit by a class 33.Hopefully more track will be laid soon so i can crack on with the layout.

Steve

Link to post
Share on other sites

Hi Everyone

Nothing done on layout at the moment still waiting for more track i think i should have gone to peco and paid abit more at least i would have the track by now.So i have started building my class 33 heres some pictures.

Steve

post-11944-0-06768400-1335910117_thumb.jpg

post-11944-0-54793900-1335910187_thumb.jpg

post-11944-0-99936200-1335910255_thumb.jpg

Link to post
Share on other sites

  • 2 weeks later...

Hi Steve,

 

Firstly I must apologise for not commenting on this thread before (I have only just found it :blush_mini: )

 

Looking good so far, you certainly like your 33's :yes: these are one of my favorites as well, that Heljan one looks superb 8)

 

Considering you are new to 7mm I think it is fantastic you are giving a PRMRP 33 ago, I really hope this works out well and look forward to seeing the end results :yes:

 

All the best Darren NSE DAZ

Link to post
Share on other sites

  • 2 weeks later...

Hi Darren NSE DAZ

The 33's are great.The PRMRP 33 is taking longer than i expected to build so its been put aside while i build my first dmu its a 121 easy build. still not put any more track down still waiting for my order from local model shop.Platform edge & station lamps& waiting shelter arrived from Skytrex.Heres some pictures of wots been done so far any comments welcome.

Steve

post-11944-0-99913900-1337550457_thumb.jpg

post-11944-0-29117900-1337550529_thumb.jpg

post-11944-0-76219100-1337550613_thumb.jpg

Link to post
Share on other sites

Hi everyone

finaly got the rest of my track & point having to go to peco to get it so laid & wired and tested while having a play and putting platform on as a terminus then moving it as a through station.If i go for the latter there will be a 3ft fiddle yard at each end and 9ft of scenic i have dropped the 3rd rail in favour DMUs 121/108s & 33s/ 31.Moving the area to devon with a few china clay wagons.Name change as well ?.Heres some pictures any tips or ideas welcome.

post-11944-0-53548700-1337809200_thumb.jpg

double going to fiddle yard far right short siding.

post-11944-0-11014500-1337809421_thumb.jpg

waiting shelter.

post-11944-0-59325100-1337809576_thumb.jpg

two car platform.

post-11944-0-94634300-1337809279_thumb.jpg

Link to post
Share on other sites

It looks ok to me Steve. Apart from one photo is out of sync.

Good to see you have made more progress with the track laying, its coming together nicely. I like the idea of the through platform but what about making it single track into the 3' FY. The station area could then be a passing loop too? Or maybe have the station as a terminus but with the freight line continuing? The single track could be to a private china clay siding and the wagons are left in the short siding for the works 08 to collect and return. almost an excuse to leave the 33 ticking over awaiting the returned wagons. Just thinking out loud mate.

 

Just need an excuse for Daz's 50 to visit now!

Link to post
Share on other sites

Hi Scott

Like the idea of station & passing loop i have moved the platform to the other end picture with the buffer stop.Use left hand track think it will look better.Would love to see DAZ's 50 on here but it will be a few years before i will be buying one.

Thanks Steve.

Link to post
Share on other sites

Hi Everyone

Bit of a update built two bridges first one i started makes first side looked good then realised i made it to 4mm scale not 7mm started again got some slaters stone plastic card put it on did not look right.Scraped that thinking what to cover it with looking through scalescenes web sight down loaded their stone paper looks alright.Lined up the platform edges.Heres some pictures any comments welcome.

Steve

post-11944-0-71338800-1338155828_thumb.jpg

post-11944-0-33248400-1338155894_thumb.jpg

post-11944-0-44998400-1338155961_thumb.jpg

post-11944-0-08658600-1338156027_thumb.jpg

post-11944-0-83471000-1338156103_thumb.jpg

post-11944-0-09607700-1338156173_thumb.jpg

 

Link to post
Share on other sites

Hi everyone

Got a bit more done today glued platform edges & tops down put in the ramp from station bridge to platform.Still got more detail to do to the wall.Anyone whos into 7mm can you get concrete fence posts or will i have to make them.The class 121DMU is coming along hopefuly soon be ready for the primer photos soon alot to do layout & kit building.Heres some pictures of platform & ramp any comments welcome

Steve.

post-11944-0-93643600-1338407955_thumb.jpg

post-11944-0-55094600-1338408031_thumb.jpg

post-11944-0-96638100-1338408105_thumb.jpg

 

Link to post
Share on other sites

Hi 110Samec & Andrew P

Layout starting to take shape now.I have to keep reminding my self its 7mm not 4mm.Thanks for your comments. Andrew hows swad these days are they still building.

Steve

Link to post
Share on other sites

  • 2 weeks later...

Hi Everyone

Bit more done on the layout painted rail sides & platform edge,platform shelter.done bit more to bridges & wall of ramp down to platform started on the scenery ready for the grass to go down got to get back boards first left them of for now so i can work both sides of layout.Got to order ground frame heres some pictures of whats been done so far.Comments welcome. Also done bit more on the 121DMU.

Steve.

post-11944-0-45308200-1339267226_thumb.jpg

post-11944-0-42016400-1339267304_thumb.jpg

post-11944-0-06435500-1339267381_thumb.jpg

post-11944-0-58974100-1339267461_thumb.jpg

post-11944-0-44768800-1339267547_thumb.jpg

post-11944-0-55695100-1339267644_thumb.jpg

post-11944-0-62834300-1339267717_thumb.jpg

post-11944-0-14050800-1339267794_thumb.jpg

Link to post
Share on other sites

  • RMweb Gold

Interesting project this...has a whiff of Lapford about it when looking at the bridge/station.

 

I shall be following this with much interest...do like long and narrow 7mm layouts, me... :yes:

Link to post
Share on other sites

Hi bcnpete & pwr

Its starting to take shape now. the bridges i did look at a book i got a few years ago on the tarka trail past & present.So sort of got the jist from lapford.The view looking towards the two single arch bridge will be left hand track is a freight line to a clay works & right hand line is for up/down passenger.Single up/down platform with a run loop & small siding.When Dapol brings out there 08 that will collect clay hoods from loop or siding.33,31 will run round at station.Next stage is to get backscene on & start ballesting.Thanks for your comments.The DMU just got to had few more bits then it will be ready for the primer thats if the fuel tank stays on.

Steve

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.


×
×
  • Create New...