RMweb Gold RFS Posted May 27, 2012 RMweb Gold Share Posted May 27, 2012 Has anyone built a layout using Peco code 75 pointwork and SMP or C&L trackwork? If so what's the difference in height between the two and are there any issues with the transition? Thanks Link to post Share on other sites More sharing options...
hayfield Posted May 27, 2012 Share Posted May 27, 2012 Has anyone built a layout using Peco code 75 pointwork and SMP or C&L trackwork? If so what's the difference in height between the two and are there any issues with the transition? Thanks The main problem between Peco code 75 pointwork and SMP or C&L track is the height of the sleepers, Exactoscale do track in 00 gauge using thicker sleepers which will be a better match and saves packing up the thinner track to match the height of Pecos code 75 Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.