RMweb Gold PaulRhB Posted October 12, 2014 RMweb Gold Share Posted October 12, 2014 (edited) Here's a few more that led to my Rhätia and the plan above for a friend. 9x3 on 3x3 boards you can see the 3ft divisions on the front of the 3D plans, if you narrowed the centre and swing the track to the front or back at the far end you could get in a second curve to the FY. PaulRhB plans by -salisburyASC- And a bigger version with really dodgy perspective! Rhätia initial ideas by -salisburyASC- Edited March 21, 2018 by PaulRhB 4 Link to post Share on other sites More sharing options...
jhock Posted October 13, 2014 Author Share Posted October 13, 2014 I had a quick go on SCARM, to see what I could come up with: 1 Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted January 6, 2015 RMweb Gold Share Posted January 6, 2015 Kato announce an Allegra http://traintrain.jp/blog/detail/mid/21576/date/2014-12-31 1 Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted January 30, 2015 RMweb Gold Share Posted January 30, 2015 Kato Allegra due April-May http://www.bahnonline.ch/wp/82896/kato-n-1-150-neuheiten-2015.htm Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted April 11, 2017 RMweb Gold Share Posted April 11, 2017 (edited) Does anyone know which microtrains couplers fit the Ge 4/4? I've found a conversion for the coaches at AB model but nothing for the loco. Edited April 11, 2017 by PaulRhB Link to post Share on other sites More sharing options...
IWCR Posted April 11, 2017 Share Posted April 11, 2017 Hello I travelled on rhb around 10 years ago in the winter and I was impressed with the amount of freight carried with mixed trains. One or two Containers on flats was quite common. One station I was waiting at had an electric pass train arrive which detached a single wagon with container from the rear leaving this in the platform as it departed. Station staff then used a small diesel shunter to collect this and place in the sidings under a small fixed container gantry. A car was then driven onto a flat wagon and attached to the rear of another electric train as it made its station stop. Probably more freight in the winter when many mountain roads are impassable. Pete Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted April 11, 2017 RMweb Gold Share Posted April 11, 2017 Quite normal on the RhB Peter Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted April 19, 2017 RMweb Gold Share Posted April 19, 2017 (edited) For reference microtrains 2004-1 are an easy fit in the Ge4/4iii, just trim off a small corner on the back of the assembled microtrains coupler box on each side. On the coaches it requires cutting off the top frame for the rapido coupled and gluing a strengthening piece on top Edited April 19, 2017 by PaulRhB Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted April 19, 2017 RMweb Gold Share Posted April 19, 2017 To fit the 2004-1 prepare the coupler as below Unclip the front coupling and skirt using a fingernail at the side. Pop in the modified coupler. Clip back in the skirt unit. Link to post Share on other sites More sharing options...
calcifer Posted November 22, 2018 Share Posted November 22, 2018 (edited) Apologies for resurrecting such an old thread, but I'm intrigued by Paul's diagram. Paul, what would you estimate its size in N scale? I have a 14' x 14' open space, and was thinking about something like this, or the quick sketch at the top of this post. Thank you. PaulRhB plans by -salisburyASC-And a bigger version with really dodgy perspective! Rhätia initial ideas by -salisburyASC- Edited November 22, 2018 by calcifer Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted November 22, 2018 RMweb Gold Share Posted November 22, 2018 Sketch.png Apologies for resurrecting such an old thread, but I'm intrigued by Paul's diagram. Paul, what would you estimate its size in N scale? I have a 14' x 14' open space, and was thinking about something like this, or the quick sketch at the top of this post. Thank you. Well it was 20ft in HOm, the boards from the left were3 (station), 3(station), 3(spiral), 4 (gorge), 4 (bridge), 3(spiral). So in theory it could be really cramped down to 10ft or reduced to 1/150 about 12ft. Link to post Share on other sites More sharing options...
calcifer Posted November 22, 2018 Share Posted November 22, 2018 Thanks, Paul! Link to post Share on other sites More sharing options...
Satan's Goldfish Posted November 20, 2019 Share Posted November 20, 2019 And in yet another random tangent for this useful thread; I'm 90% sure I once saw a picture of one of the blue Arosa coaches in use elsewhere on the main RhB network. Can't find it now of course, or was I getting confused with a picture of an Arosa train that just had 1 of the blue coaches in the make up? Just curiosity really, but did those coaches venture further than just their line? (Seen plenty of pictures of Bernina coaches in places other than on the Bernina Bahn, so assuming Arosa stock also travelled?) When did the blue vehicles get painted back into red anyway? Cheers Link to post Share on other sites More sharing options...
Satan's Goldfish Posted November 1, 2022 Share Posted November 1, 2022 On 20/11/2019 at 19:17, Satan's Goldfish said: And in yet another random tangent for this useful thread; I'm 90% sure I once saw a picture of one of the blue Arosa coaches in use elsewhere on the main RhB network. Can't find it now of course, or was I getting confused with a picture of an Arosa train that just had 1 of the blue coaches in the make up? Just curiosity really, but did those coaches venture further than just their line? (Seen plenty of pictures of Bernina coaches in places other than on the Bernina Bahn, so assuming Arosa stock also travelled?) When did the blue vehicles get painted back into red anyway? Cheers Rather late 'bump' to see if anyone can help with this question! Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted November 1, 2022 RMweb Gold Share Posted November 1, 2022 14 minutes ago, Satan's Goldfish said: Rather late 'bump' to see if anyone can help with this question! Yes after the advertising contract ran out they turned up on various trains as they went back into the general pool and we’re used as extras. 1 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now