A railway structure built in styrene, not connected directly with my main layout builds

 

What else could it be but a bridge, the choice being an existing structure no longer in use by today's railway system

 

Points Bridge, Hagg Bank, Wylam, Northumberland

 

Scale – 4mm / 1 ft

Overall dimensions – 1066mm long x 110mm wide x 170mm high (u/s bridge deck to top of arch)

 

post-10633-0-62560000-1350665855_thumb.jpg

 

Drawings were prepared - Elevations and Sections

 

post-10633-0-96874300-1350665948_thumb.png

 

post-10633-0-43812500-1350665981_thumb.png

 

The build started by constructing the deck beams, the rail support stringers and the inter-rail deck plating

 

post-10633-0-79302600-1350667011_thumb.jpg

 

post-10633-0-19520800-1350667070_thumb.jpg

 

post-10633-0-64391500-1350667123_thumb.jpg

 

Of course my usual testing of the bridge structural elements was a must, and was completed to my satisfaction

 

post-10633-0-22246800-1350667184_thumb.jpg

 

The second stage of the build was the construction of the three arches, which required a study of the build process to ensure that all the cross-bracing could be placed and fixed in place relatively easily

 

A template drawing was used to enable the curved top and bottom beams to be placed and held in their correct positions whilst the vertical bracings were fixed in position

 

Two of these side structures were then placed side by side and joined by plating strips 9.5mm wide, top and bottom

 

The lower part of the arch was fitted with cross-braces above and below the upper flange of the bottom arch beam

 

post-10633-0-45151500-1350666046_thumb.jpg

 

post-10633-0-61896000-1350666127_thumb.jpg

 

The side cross bracings complete with their internal cross-bracings

 

post-10633-0-66210400-1350666302_thumb.jpg

 

Completed Arch fixed to the Bridge Deck

 

post-10633-0-34167100-1350666342_thumb.jpg

 

post-10633-0-21213600-1350666381_thumb.jpg

 

Suspension hangers struts fitted

 

post-10633-0-42907900-1350666541_thumb.jpg

 

One of the two outer arches started

 

post-10633-0-59011400-1350666720_thumb.jpg

 

post-10633-0-13757300-1350666647_thumb.jpg

 

Although I ran out of time to complete the bridge for the end of challenge date, construction continues

 