Going back to the introductions over the 387's this week?

 

I thought these were taking. Over the paths of the greenford services which would then shift over and terminate in the new bay at west ealing. But as a regular commuter from paddington to west drayton, i have found all this week that services still operating to greenford acording to the digital displays at paddington. Is this just me or what? Simon probably knows the answer...

 

According to the information on Realtime Trains for today your original view seems to be more or less correct  - it appears that some Greenford trains are running to/from Paddington while some are terminating at West Ealing in the new bay and the 387s are running more or less in their paths.

Link to post
Share on other sites

According to the information on Realtime Trains for today your original view seems to be more or less correct  - it appears that some Greenford trains are running to/from Paddington while some are terminating at West Ealing in the new bay and the 387s are running more or less in their paths.

I'm not sure if they can be terminating in the bay, I don't think it's finished out, certainly not commissioned until Christmas.

 

Simon

Link to post
Share on other sites

  • RMweb Gold

I'm not sure if they can be terminating in the bay, I don't think it's finished out, certainly not commissioned until Christmas.

 

Simon

 

They're definitely showing Platform 5 (of three!) at West Ealing and one arrived today (according to RT trains) at the same time as a train on the Up Relief which implies they are going into the bay. Interesting. 

Link to post
Share on other sites

There are a few more videos of these now cropping up on youtube, looking at twitter a few Greenford branch users are understandably a little aggrieved but otherwise it seems to have been well received.

 

 

 

 

Nice to hear 'GWR' being used by the audio announcer, though the new one does sound a little odd at times.

Edited by Christopher125
  • Like 2
Link to post
Share on other sites

They're definitely showing Platform 5 (of three!) at West Ealing and one arrived today (according to RT trains) at the same time as a train on the Up Relief which implies they are going into the bay. Interesting. 

 

Perhaps Crossrail have decided commission it early, but I'm not sure if they've told us!  EDIT: My mistake, it has been commissioned, as its not my plan I don't get the latest 'intel' so apologies for confusion!

 

On my way to work this morning, I did see that some contact wire is up between Tilehurst and Reading, but at Tilehurst one the of registry arms on the Down Relief wasn't attached to the contact wire beneath it, it was still cable tied to the boom, although the two arms either side were attached to the contact wire. 

 

Simon

Edited by St. Simon
Link to post
Share on other sites

  • RMweb Premium

Good to see real progress. I have to admit that part of my interest is the knock on effect of delays to the Valleys scheme, which I cannot now see being finished anything like soon enough to take over from the Pacers. But that is another story. They'll just have to bring back 56xx and BR suburbans on the Rhymney!

But a question. I assume that pantographs on current UK electric stock are designed to work between certain upper and lower height limits, and that their effectiveness changes with contact wire height - though I would non have a clue about the details. I know when the BedPan line was electrified there was a very tight spot at Farringdon. I don't know if it is still there as I stopped commuting a decade ago. I believe that a design constraint for the class 317 and 319 classes was this low spot.

So, the question: if it is necessary to raise contact wires through stations will current designs of pantograph cope?

PS If you feel that this is a distraction from the topic of the thread please say so and I shall desist, or ask the question elsewhere.

Jonathan

  • Like 1
Link to post
Share on other sites

I'd interpret that to say that the wires are fine, but there may be an issue with the live metalwork that's used to support them (everything on the wire side of the insulators is live, obviously).

Nice to see the goalposts moving anyway. I remember the same thing with the 458s - they were specified and built to what Alston/SWT were told the DDA legislation was going to be, but subsequent to that the requirements were made more onerous, and the trains didn't comply and they had to be expensively modified (think the eventually came up with a relatively cheap solution, but it could have been very costly).

If there's one thing guaranteed to drive an engineer mad, it's changing the spec once the design is complete/ build has started.

Link to post
Share on other sites

What's the purpose of the third light on the front of the 378s?

 

Hi,

 

Its used for lighting the coupling when attaching and detaching units whilst I also believe it can be used for a light for video cameras for track inspection.

 

387133 (western set) coupled to 387130 on the UGL west of Hayes at 9am this morning, "not in service" displayed. 3rd rail shoe gear vey prominent on both units.

 

There is a Track Circuit Failure on the Down Main (has been since yesterday evening), which has meant Down moves are being put on the reliefs, which has probably meant that the 387 diagrams aren't be running as often as timetabled today

 

Simon

Link to post
Share on other sites

 

So, the question: if it is necessary to raise contact wires through stations will current designs of pantograph cope?

 

The wire heights will be changing from very low to low.  They will be nowhere near as high as the heights you get above level crossings, which all pans are designed to cope with.

Link to post
Share on other sites

  • RMweb Gold

Good to see real progress. I have to admit that part of my interest is the knock on effect of delays to the Valleys scheme, which I cannot now see being finished anything like soon enough to take over from the Pacers. But that is another story. They'll just have to bring back 56xx and BR suburbans on the Rhymney!

But a question. I assume that pantographs on current UK electric stock are designed to work between certain upper and lower height limits, and that their effectiveness changes with contact wire height - though I would non have a clue about the details. I know when the BedPan line was electrified there was a very tight spot at Farringdon. I don't know if it is still there as I stopped commuting a decade ago. I believe that a design constraint for the class 317 and 319 classes was this low spot.

So, the question: if it is necessary to raise contact wires through stations will current designs of pantograph cope?

PS If you feel that this is a distraction from the topic of the thread please say so and I shall desist, or ask the question elsewhere.

Jonathan

 

It would probably be a relatively simple matter of adjusting the overheight setting on the pantograph in order to stop it lowering when it met a section of higher contact wire.  But in any case the contact wire height would have to be within the set tolerances and shouldn't have been approved at design stage if it wasn't.

Link to post
Share on other sites

  • RMweb Premium

Coming home this afternoon, and looking in on Reading depot, it was just turbos, none with sticky out bits on the roof. The west end leads had some usefully sited register arms on the masts, and earth cable up, but nothing else.

Further on, up to speed, I was looking at the auto transformer cable (above the up relief) Every so often there were jumper leads going down by the masts, disappearing into the cats cradle of cabling around the catenary. I thought some linked on to the earth, but that couldn't be so? We were too fast to be sure about that.

The other curiosity was I was on a GWR HST Paddington -Swansea, but there was an Arriva train cleaner wandering round with his big plastic bag, was he lost?, or was he fulfilling the old saying "Keep Wales tidy, dump your rubbish in England?"

Edited by Northroader
Link to post
Share on other sites

Coming home this afternoon, and looking in on Reading depot, it was just turbos, none with sticky out bits on the roof. The west end leads had some usefully sited register arms on the masts, and earth cable up, but nothing else.

Further on, up to speed, I was looking at the auto transformer cable. Every so often there were jumper leads going down by the masts, disappearing into the cats cradle of cabling around the catenary. I thought some linked on to the earth, but that couldn't be so? We were too fast to be sure about that.

The other curiosity was I was on a GWR HST Paddington -Swansea, but there was an Arriva train cleaner wandering round with his big plastic bag, was he lost?, or was he fulfilling the old saying "Keep Wales tidy, dump your rubbish in England?"

 

If it is not yet live it will need to be earthed at regular intervals, probably about every 400m or so.

Link to post
Share on other sites

  • RMweb Premium

Not energised yet!

 

The RRV in Reading Depot during the weekdays has been involved in 'snagging' work. Speaking to the team's COSS when he booked off with me the other day, they are still a couple of weeks away from completing the work.

 

No mention of any of the 387s coming to stay in the immediate future, although when I do a "View Stock List" report on INTERGRALE for 'RG-Reading Depot' 387130 now appears on the list, but I wouldn't read to much in to that :D

Link to post
Share on other sites

  • RMweb Gold

The situation with the section on the Relief Lines between Scours Lane and Tilehurst isn't much better.  Although there is catenary there - and has been for a couple of weeks - it is completely unusable I found on having a  look at some of it yesterday.

 

The first view shows the catenary wire on the Up Relief immediately east of Tilehust station strapped to the gantry by temporary strapping instead of being fixed to the register arm (click to enlarge pics)

 

post-6859-0-87321100-1473517136_thumb.jpg

 

A little further east the Down Relief contact wire is similarly suspended from a gantry

 

post-6859-0-71407700-1473517247_thumb.jpg

 

While at Scours Lane the gantry which marks the eastern extent of the electrified(ish) route through to Milton is still far from a finished job on the Relief Lines (nearest viewpoint)

 

post-6859-0-07944900-1473517332_thumb.jpg

 

Thence the section which will lead into the western end of the depot is also at a fairly early stage

 

post-6859-0-84769500-1473517527_thumb.jpg

Link to post
Share on other sites

Suspect they'll leave it like the have with the Patchway tunnels

 

From 31:30.

 

Given the closure of the tunnel and the route to it from Filton triangle you would assume it's a good time to conduct some of the other infrastructure works e.g the removal of the footbridge at Pilning.

  • Like 1
Link to post
Share on other sites

Very interesting film. I didn't realise just how much loss of visibility there is in the few seconds approaching the mouth of a tunnel.

 

Incidentally, was that a bird strike at 40m50sec? It certainly obscured a significant part of the central visual area for the rest of the film.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...