Hi all....due to a lot of interest of a bit of help request for info on exeter central in prototype blog, i thought i would post this build,it is an N gauge layout being built by our club(Junction 72A mrc) of Exeter Central....it is approx 16 feet long and 8 feet wide, baseboards have been made to come apart in 8 sections(for exhibitions) and track has been partially/temporarily laid at this time,as far as i know it will be dcc!...

here are a few pictures...... 

 

view looking up through the station (from queen street) showing its 4 mainlines, bays and goods yard track to be laid,new north road bridge(template) can be seen in the distance.

post-19438-0-45709900-1385499352.jpg

This corner will be used as a 6 track fiddle yard long enough to hold 10 coach trains,2 mainlines run down the middle this where  we have a scenic break,this is the direction out towards exeter st davids

post-19438-0-60526900-1385499964.jpg

rear of layout showing the 2 mainlines,the vacant space to its right will be 72A engine sheds, its turntable and carriage sheds

post-19438-0-65400500-1385500119.jpg

view looking at where St James will be

post-19438-0-33973500-1385500357.jpg

view looking back towards central and new north road, this is the large junction to access bays and carriage shed,lots of pointwork to fit yet!!

post-19438-0-75163200-1385500468.jpg

 

i will post more as the build comes together  :)

...dave 

Edited by DAVE1562
  • Like 11
Link to post
Share on other sites

  • 1 month later...

Here are some more progress pics from tonights meeting....please excuse the lighting as they are not very good in the club room.

 

post-19438-0-61168500-1389654007.jpg

fiddle yards, main lines are the two center two...

 

post-19438-0-04590000-1389654018.jpg

looking towards st james ...

 

post-19438-0-65437500-1389654030.jpg

north road bridge and its junction....at the minute the bridge is a template for positioning. near the light is where the cattle dock is positioned, the space where the pile of loose track is will be the carriage sidings....(this section is my build :imsohappy:)

 

post-19438-0-85459200-1389654036.jpg

looking towards north road bridge and exeter central position lines....Exmouth bay platform on the left,the two r/h lines is the other bay and line leading to the sidings just past the toolbox!

 

droppers and main buz wiring are just being started......

 

 

 

 

  • Like 5
Link to post
Share on other sites

  • 3 months later...

Hi all......at last, we have been able to have a running night, most boards have bus wires and droppers installed allowing us to run a few of the members stock, as always a few minor hiccups but nothing that cannot be resolved. We have also re-named the project... St katherines after our club building which we are based.. a good night was had by all, here are a few pics....

 

post-19438-0-52117600-1399327700.jpg

post-19438-0-34405300-1399327709.jpg

post-19438-0-52850700-1399327736.jpg

post-19438-0-37816800-1399327747.jpg

post-19438-0-35424200-1399327754.jpg

post-19438-0-21090100-1399327767.jpg

post-19438-0-10600800-1399327787.jpg

post-19438-0-25937700-1399327799.jpg

 

thats all for now... :yahoo:

 

...Dave

Edited by DAVE1562
  • Like 6
Link to post
Share on other sites

Thanks Bob... Ben,at the moment there are around 4 of us been  track laying and wiring who have the skills but other n gauge members have helped with the boards as required, each member has a different level of knowledge and practical skill which we all try to share and pass on to each other, in all about  a third of the club are n gauge. 

 

Dave

  • Like 1
Link to post
Share on other sites

Hi Dave

 

Great idea for a layout.

 

Are you planning to use DCC and will you be running proper Atlantic Coast Express trains that split / join sections at the stations? An operation just made for DCC and Dapol easy-shunt couplers.

 

Regards

 

Nick

Link to post
Share on other sites

Hi Nick, the layout is fully dcc, the main bus is installed and droppers to allow us to run, more  track work is needed on the station sidings, carriage sheds and at some point (long way off) exmouth jcn shed(72A)... the track plan is based on the prototype of exeter central around 1940 ish with a few very minor changes for operational reasons and so we can use off the shelf track(code 80 streamline)... we have used the double cross over...so yes with a coupling change to stock it can be done, i have a full 8 coach rake of br/southern coaches which looked impressive running around and a farish b of b (spitfire) is being chipped as we speak... i am looking forward to the release of dapols new unrebuilt/rebuilt versions for better detail...as more work is completed i will post some more  pics....

Link to post
Share on other sites

  • 1 year later...

Hi all.... here are a few progress pics to date... as you can imagine ,a lot of work...electrics still ongoing, powered using a powercab via an sb5 booster, extra utp panels around the layout allowing the use of extra cabs(cab06),layout has now been separated into block sections to make fault finding easier....scenic work in progress

post-19438-0-54967200-1450739980.jpg

post-19438-0-70373300-1450739990.jpg

post-19438-0-11925000-1450739999.jpg

post-19438-0-16164200-1450740007.jpg

post-19438-0-73172700-1450740016.jpg

post-19438-0-74111900-1450740027.jpg

post-19438-0-32048700-1450740037.jpg

post-19438-0-15559100-1450740047.jpg

post-19438-0-57105000-1450740066.jpg

  • Like 15
Link to post
Share on other sites

  • 3 months later...

Dave,

 

It's looking great, would love to see an update?

 

Hope all well.

 

Eddie

 

Hi Eddie at the moment the layout has been split down for wiring work, we are in the process of fitting point indication and route boards leds and replacing the legs as they were a bit wobbly... I will post more progress pics when it is back together.... 

Link to post
Share on other sites

  • 10 months later...

Hi Dave,

 

Any progress since April? Look forward to updates.

 

Eddie

Hi eddie....will sort more pics to show...still wiring and have just laid the track for the shed(72A)..with a bit of modellers licence as space was short.. :)

  • Like 1
Link to post
Share on other sites

  • 3 weeks later...

Hi all some progression pics as requested....

 

 

scratch built by one of the members...

post-19438-0-61617300-1491859959.jpg

post-19438-0-66279500-1491859966.jpg

post-19438-0-72516100-1491859976.jpg

post-19438-0-73985100-1491859988.jpg

post-19438-0-54622000-1491859949.jpg

 

st James park stn...

post-19438-0-11533500-1491859999.jpg

 

72A shed... a bit of modellers licence here, reduced the number of lanes down because of space restrictions

post-19438-0-31167800-1491860008.jpg

post-19438-0-67491700-1491860016.jpg

 

still lots of work to do..... :)

 

  • Like 6
Link to post
Share on other sites

  • 2 weeks later...
  • 2 weeks later...

Hi Dave,

 

It's looking impressive! Thanks for posting. What did you use for the scenics on the cutting by the curve before St James's station? I like the autumnal colours.

 

Cheers

 

Ben A.

Hi Ben..think its coloured moss mate... not had much to do with scenery, track and electrickery me... :)

Link to post
Share on other sites

  • 3 years later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...