Jump to content
 

Smallwood


Reddibus
 Share

Recommended Posts

Work is continuing on Smallwood. We have now wired the point motors into the DCC accessary decoder on the station baseboard and we are now making more of the building that make up the town area. Also the glazing has been completed on the station canopy – just now need to weather it!

  • Like 1
Link to post
Share on other sites

Hi Simon

 

The building next to the flats will be a block of shops with flats above them. The idea is that we are modelling a small part of what in reality would be a much larger shopping centre

 

thanks

 

from the Smallwood team

Link to post
Share on other sites

Hi All

 

Progress this week has centred around ballasting more of the track, finishing the overall roof above the station and making a start on some low relief buildings at the rear of the station area

 

from the Smallwood team

 

 

Link to post
Share on other sites

Hi All,

 

As well as making a start on making the actual buildings based on the test buildings shown above we are continuing with the ballasting of the track which is about 80% complete

 

from the Smallwood team

Link to post
Share on other sites

  • RMweb Gold

Looking good, the staggered entrance/exit to the lower level is particularly effective. 

 

Is the rearmost tunnel the br line and the line the tanks are on private?

Link to post
Share on other sites

Hi Simon

 

Yes with the two tunnel lines the one nearest the locomotive is the access to the private owner sidings and the rear line is the BR line. The Class 37 is sitting on a short siding that will be used to stable the BR locomotives

 

thanks

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...