Jump to content

TEAMYAKIMA

BEIJIAO - A CHINESE HO EXHIBITION LAYOUT

Recommended Posts

You may have noticed that I didn't post at midnight on Boxing Day ..... not much visible progress to show ........... and even less yesterday!

 

Have tidied the shed - all of yesterday!! And am now re-aligning the industrial track as it enters the curves into the FY ... this is to allow the removable tenement to go on that board without the track being visible ...

 

This is noon on Sunday 28th Dec ... before re-alignment ... note how the track would be visible.

 

post-4476-0-50529900-1419767732_thumb.jpg

 

Hopefully will get this changed later today.

 

 

Share this post


Link to post
Share on other sites

Worked out the alignment by trial and error ........... I hope I can remember which line to follow!

 

post-4476-0-00314500-1419770405_thumb.jpg

 

 

 

 

Share this post


Link to post
Share on other sites

Track re-aligned!

 

post-4476-0-94556000-1419807845_thumb.jpg

 

post-4476-0-80656900-1419807880_thumb.jpg

 

I'm trying to get as much variation as I can from the same kits. Here is the start of the station hotel. It will be only 5 stories rather than 7 and it won't have the staircases.

 

post-4476-0-84535900-1419807748_thumb.jpg

Edited by TEAMYAKIMA
  • Like 2

Share this post


Link to post
Share on other sites

So, as you may have gathered by now I have a bit of a grasshopper mind and I'm jumping around a bit between projects.

 

Here is the railway hotel ...... now (mostly) glued together ...... I wanted to vary the height to give variety ...... I cutting and knitting more than ever with this and I've come a bit to an impasse with the ground floor .....the centre section is temporary and will eventually include the hotel foyer.

 

post-4476-0-94335200-1419939072_thumb.jpg

  • Like 2

Share this post


Link to post
Share on other sites

Well the 9 day Xmas break is coming to an end with not as much progress as I had hoped. Some progress on related topics like tidying the model room and the shed and selling redundant OO items on ebay, but not as much progress on the layout as I had planned.

 

However, the three main foreground blocks of flats are basically finished........... maybe some air conditioners, some weathering and even some interiors and lighting to follow but basically finished....

 

From an angle (up the layout) the three buildings (hopefully) form a sight blocker .............

 

post-4476-0-55908900-1420155345_thumb.jpg

 

And yet when viewed side on you can see the layout through the buildings..............

 

post-4476-0-91909200-1420155212_thumb.jpg

 

I have always tried to do things on layouts that no-one else has ever done before with an exhibition layout ........... but often in attempting this I have discovered why no-one has ever done such a thing before!

 

So it is with my idea to extend the scenery onto the first FY board ...... I just couldn't hide the fact that the track curved off into the back FY. So now the backscene comes at the edge of baseboard # 1 as mocked up here.....

 

post-4476-0-98188700-1420155688_thumb.jpg

Edited by TEAMYAKIMA
  • Like 5

Share this post


Link to post
Share on other sites

Just to let you know that I will have a demo/display at the St Albans exhibition on Jan 10/11 ......... probably building tenements or the hotel.

 

The big news is that my main 'helper' .... Al of Remagen fame .... will be in attendance on the Sunday. Al will bring the motorway bridge for display.... maybe even Saturday if we can manage a meet beforehand.

 

Al's motorway bridge is worth a visit to the show in its own right ............ can't wait to see it myself!

 

 

 

 

Share this post


Link to post
Share on other sites

Is a brilliant layout and all those techniques...... Do you have time during Easter? I will pay a visit during Easter....Hope you have time......The buildings look amazing.

Share this post


Link to post
Share on other sites

Last weekend (Jan 10/11) I had the pleasure of demonstrating at St Albans show.....

 

I made some progress, but the star of the day was my fellow Chinese enthusiast Peter Morgan. Over the two days Peter made this skyscraper under construction ....

 

post-4476-0-17093800-1421223187_thumb.jpg

 

This is a kit-bash of two Kibri kits to make a larger more impressive building as the original kit has a ridiculously small footprint - many thanks Peter!

 

More later about St Albans and in particular Al's new bridge.

  • Like 3

Share this post


Link to post
Share on other sites

I have dinner guests coming tomorrow night and so have mocked up the l/h end of the scenic section to give them something to look at.

 

The white foamboard represents the backscene hiding the curves to the fiddle yard.

 

The buildings at the back are circa 1950 ...... very dirty and run down in this dirty industrial city. The buildings at the front are circa 1985 ... much cleaner.

 

At the back of the layout, the station for the industrial steelworks system is off to the right on boards 2 and 3 and so you might be able (just) to see that the tenements nearest the station have shops/restaurants on the ground floor whilst the one furthest from the station (building #1) has apartments on the ground floor.

 

post-4476-0-27132400-1421364961_thumb.jpg

 

Building # 1 is about 40% finished, building # 2 is 75% finished and building # 3 is 99.9% finished.

 

post-4476-0-21489100-1421365005_thumb.jpg

Edited by TEAMYAKIMA
  • Like 7

Share this post


Link to post
Share on other sites

Some of the hundreds of rooms in these tenements will be lit .... and a very few will have interiors .... have been working on one this morning

 

 

post-4476-0-40715000-1421758696.jpg

Share this post


Link to post
Share on other sites

Here's a better photo of the current state of play ... might add a Preiser chair or two when Gaugemaster send them through

 

post-4476-0-58546600-1421798345.jpg

 

And here it is fitted to the building with lights on .... they need adjusting, but you get the idea......

 

post-4476-0-96599100-1421798331_thumb.jpg

  • Like 2

Share this post


Link to post
Share on other sites

Impressive. How many more to do on the three blocks?

Share this post


Link to post
Share on other sites

It's very enjoyable making these interiors . There are five faces on the three blocks ..... maybe one or two per face ........enjoyable, but time consuming !

 

Am working on #2 ... watch this space!

Edited by TEAMYAKIMA

Share this post


Link to post
Share on other sites

OK........ the full answer is YES, but it's slightly more complicated than that!

 

I start with the premise that 99% of those visiting a model railway show know nothing of Chinese railways ... and care even less!

 

So to attract and keep their interest the layout must be 'interesting' and must have 'gimmicks'.

 

So as a (very) serious modeller I want very serious 'stuff' , but to attract the general public the layout must have 'gimmicks'.

 

And so one 'gimmick' will be lighted interiors in which over a period of time the lights will 'randomly' go on and off.

 

So visitors will be encouraged to look out for the woman ironing or the woman reading a book on the sofa or whatever ...each scene will be lit for a period and then go out and another will be lit via some electronic gizmo made by one of my fellow club members.

 

The next scene may be a mother holding her young son and looking out of the window .... keep watching!

  • Like 3

Share this post


Link to post
Share on other sites

That's the first post I've wanted to hit at least four Ratings buttons.

 

I know what you mean and feel your pain!

But seriously, if I can help please ask.

 

 

Kev.

(Who is scheming to make another China trip happen...)

Share this post


Link to post
Share on other sites

I guess what I'm saying is that many visitors to a show will like 'average' layouts based on their favourite prototype/region/era rather than 'good' layouts based on something they like/know very little. I remember one old club member who liked anything GWR no matter how average it was and ignored anything else no matter how good.

 

Therefore, something as 'left-field' as a Chinese layout needs to be entertaining in order to hold the attention of the 'average' show attendee...... the trick will be to be entertaining and 'scale' at the same time.... ie no 'giraffe cars' or wedding groups or blazing buildings with fire engines attending.

 

Time will tell if I can get the 'right balance'.

 

Have set a target of two more completed interiors by end of business tomorrow.... will report back on how close I get to achieving that.

Edited by TEAMYAKIMA
  • Like 1

Share this post


Link to post
Share on other sites

Ok .... it's about 4pm and time to review progress .....

 

Two interiors have been made, lighted and fitted ............

 

Here's # 1

 

post-4476-0-73827800-1422201979.jpg

 

And from the outside ............

 

post-4476-0-76354200-1422201994.jpg

 

Getting good photos of #2 has proved difficult  ...

 

Will try again and report back!

 

 

  • Like 3

Share this post


Link to post
Share on other sites

Ok .... here's the other interior

 

It's not designed to be viewed from this angle ...... that's why the figure painting looks poor.....

 

post-4476-0-42995100-1422205091.jpg

 

And from the outside ......

 

 

post-4476-0-15242700-1422205197_thumb.jpg

  • Like 3

Share this post


Link to post
Share on other sites

Have been off work sick today .... found some time indoors to add some extra details to the interiors ....

 

post-4476-0-23373400-1422722965_thumb.jpg

  • Like 1

Share this post


Link to post
Share on other sites

I have started a new contract at work, cutting my days to four , in order to spend more time modelling.

 

Which is just as well as this new shop interior appears to have taken all day!

 

Was watching a Telerail Chinese steam video yesterday and picked up some useful ideas ... Telerail always include a bit of 'local colour'.

 

One idea was a bicycle repair shop ....

 

post-4476-0-29726700-1422903750_thumb.jpg

 

It's a pity that much of this detail won't be seen once the buildings are fitted to the baseboards!  I must be mad!!

 

 

Share this post


Link to post
Share on other sites

Have been off work sick today .... found some time indoors to add some extra details to the interiors ....

 

attachicon.gifDSC_0028 (2).JPG

 

...... What are they doing?

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.