RMweb Premium kevinlms Posted July 12, 2014 RMweb Premium Share Posted July 12, 2014 The manifests/switch lists as above were created with JMRI Operations - these are very configurable and it would be very feasible to modify them into a TOPS-list style for 1970s+ UK operations. (I could knock up an example TOPS style one if anyone is interested?) Whilst doing it by wagon number is certainly nicer, it's not compulsory, and would be a lot harder with the smaller lettering on most modern (BR+) wagons - JMRI can also work in simpler forms, for example if you took the wagon number column out it'll tell you to pick up (say) 5 mineral wagons from a track, if there's more than the 5 there then the program will not care which 5 get picked up. One possible downside of these is that computer printed lists may "feel wrong" for pre-1970s scenarios? What about Harry Drummond's Wagonflow? http://www.trainflow.com/wagflow.htm Not sure if it runs on more modern computers. Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted July 12, 2014 Author RMweb Gold Share Posted July 12, 2014 It's more to get people thinking of what type of layout could be adapted or built as I said it's a hypothetical to get people thinking. Link to post Share on other sites More sharing options...
RMweb Gold Donw Posted July 12, 2014 RMweb Gold Share Posted July 12, 2014 A timetable is simply a framework Don - it sets out when you can run trains of different types without them operationally getting in the way of each other although it is a fairly simple task to add balances (i.e when an incoming train has to return) and of course it takes account of platform/siding capacity (an equally simple task provide you have some graph paper and drawing implements, and a rubber (eraser should the PC police chucker go beserk). What you 'populate the timetable with is a different matter and whether or not a particular loco does or doesn't fit is really down to the initial standards and compliance with them. Specials are easy if you know where you can run them and a proper timetable graph will tell you that at a glance (even if you're looking at it upside down although as it happens German TT graphs are easier to read upside down than any others in Europe). Well you are a professional Mike so have probably a lot more experience than me. I have own some timetabling for layouts and some operating. I was just imagining on the friay night before a show getting the modules set up but not really having much idea of the stock available. By the time setting up is finished it is usually near closing time and you are bushed so bit of a sweat to get it ready for the morning. Perhaps they are more organised than I imagine. Don Link to post Share on other sites More sharing options...
RMweb Gold The Stationmaster Posted July 12, 2014 RMweb Gold Share Posted July 12, 2014 Well you are a professional Mike so have probably a lot more experience than me. I have own some timetabling for layouts and some operating. I was just imagining on the friay night before a show getting the modules set up but not really having much idea of the stock available. By the time setting up is finished it is usually near closing time and you are bushed so bit of a sweat to get it ready for the morning. Perhaps they are more organised than I imagine. Don Maybe it's because I'm used to writing timetables against the clock in the middle of the night that people will be using to get to work the next morning - ooops, it's already tomorrow and lots of folk downstream needed this before I even started writing it (it's even more fun trying to do it in two languages ). When you're used to having to do 'bang out' jobs like that other things tend to come more easily. Link to post Share on other sites More sharing options...
MacRat Posted July 13, 2014 Share Posted July 13, 2014 For our module meetings we usually have a closing date for module applications about 3 or 2 months before the meeting. The meeting is advertised about 12 to 6 month in advance. This allows for planing the layout and the timetable and to discuss this with folks. And, this allows participants to plan their travel and other activities too. Link to post Share on other sites More sharing options...
RMweb Gold Donw Posted July 14, 2014 RMweb Gold Share Posted July 14, 2014 For our module meetings we usually have a closing date for module applications about 3 or 2 months before the meeting. The meeting is advertised about 12 to 6 month in advance. This allows for planing the layout and the timetable and to discuss this with folks. And, this allows participants to plan their travel and other activities too. Ah! that will make it much easier. Don Link to post Share on other sites More sharing options...
Kenton Posted July 17, 2014 Share Posted July 17, 2014 For our module meetings we usually have a closing date for module applications about 3 or 2 months before the meeting. The meeting is advertised about 12 to 6 month in advance. This allows for planing the layout and the timetable and to discuss this with folks. And, this allows participants to plan their travel and other activities too.Finally, a grain of reality into this timetable discussion. Have we not been putting the cart before the horse? What comes first is the module. People will build - in effect - what they want to build not to some over planned design of module types. A meeting of modules should be announced well in advance. Maybe with a theme in mind. Modules will be offered up (some complete some planned) some may have appropriate stock some may not (depending on trains supplied by other operators). Only at this stage can the modules be blocked out in an interconnecting design. Then and only then, can timetabling begin. Conceivably with no goods work modules or perhaps no passenger stations. Who decides on the overall design, who selects which module to be next to another. Who rejects or simply leaves out a module because it doesn't fit in with the timetable (eg 10 small passing station modules all joined up in a row with no corners/junctions/branches, or 6 MPDs?) Only when the module connection plan is finalised can the timetable be drawn up. Even then it should not be last minute (unless a module fails to show/doesn't connect/was dropped on the way into the venue). Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted July 17, 2014 Author RMweb Gold Share Posted July 17, 2014 Are you going to build a module Kenton? Valid points in your post but you don't build a railway then decide how to work it in real life, you build the railway to meet a need and provide that flexibility to operate as efficiently as possible, the same can be true of choosing to build for this idea. Submitting modules in advance is obviously necessary to make sure it fits or it will take all weekend to come up with a layout. You can swap odd plain run boards here and there to create more space. Understanding a basic railway structure that will supply opportunities to operate realistic traffic with a simple timetable structure that can be adapted to the chosen layout simplifies creating the actual timetable. The diagram I drew is actually based on a simplified version of the Poole to Weymouth line with branches at Swanage and Dorchester providing feeder traffic. Obviously the industries are different but I was trying to suggest a concept you could find anywhere. Taking the modules and using real lines as a basic plan means you can actually look at real timetables for the era and simplify that part too. Understanding the type of operation possible means you can choose to build modules that will complement others. In the US meet it became apparent there were lots of 'stations' so people chose to build plain runs or junction options to open up more possibilities. The other idea was to consider that a country line may be a better theme than trying to build a mainline as you'd need a lot more plain running and big stations which take a lot more time and space to build. The modular thread has several references to building a roundy, effectively just a larger exhibition layout, that would allow operation but doesn't give such a sense of going somewhere. Having operated on a garden line on that theme I found the multiple end freemo concept more realistic while being equal in terms of running trains. Link to post Share on other sites More sharing options...
ZiderHead Posted July 17, 2014 Share Posted July 17, 2014 Have we not been putting the cart before the horse? I think a discussion about operating is very worthwhile to provide inspiration for potential module builders, and to illustrate the potential of module-based meetings and the fundamentally different nature of these layouts compared to traditional exhibition or home layouts. Something which quite a few participants of the other thread seem to be struggling with given all the discussion about how the spec will need 18" curves to fit in with their spare room home layouts, how exhibition visitors will be able to easily view and access the layout and the obsession with roundy layouts … Link to post Share on other sites More sharing options...
Steve-e Posted July 17, 2014 Share Posted July 17, 2014 Been new to all this I'm finding it very interesting, I take it theres a control desk giving out the work orders and I like the TOPS era idea. I suppose if the layout is DCC it is also possible to position locos at certain points so you could also simulate a loco rostering desk? Is there any program that you would be able to simulate TOPS location reports for locos for example something along the lines of these for Northwich 1984(as an example of the report) would be very interesting. POWER REPORT FOR NORTHWICH AT 12.16 ON 31.05.84 NOTHING TO REPORT OUT OF SERVICE LOCOS MAINLINE LOCOS ON HAND OK ******************** LOCO DP SP T BK NEXT NEXT PREASSD O FUEL TIM-AV WTT ALLOCNO AL CH H TY RW EXAM MAJOR TO HRDY P HRS HRDYMO 1 2 LOCATION-37204-NORTHWHSD M&EE 20077 TO O VA A 37 B 124 N 000?F 193005 20141 TO O VA A 37 B 115 N 000?X 193005 47205 CD S M C XA A 33 B 202 N 061 F 083105 LV66 47246 BR O XA A 29 B 48 N 000?F 093105 6E26 47348 CD S M O XA A 11 B -52 CD 0601 N 044 F 033105 6Z45 NOTHING TO REPORT TRAINS LOCOMOTIVES ALLOCATED TO ARRIVE ********************* LOCO DP SP T BK NEXT NEXT PREASSD O FUEL WTT TO WTTNO AL CH H TY RW EXAM MAJOR TO HRDY P HRS ARRIVE ALLOC LOCATION-37122- OAKLEIGH ICI20163 TO O VA A 22 D 163 N 000?F 6F43 20173 TO O VA A 22 B 16 N 000?F 6F43 LOCATION -37130- NORTHWICH BR20185 TO O VA B 27 B 27 N 000?F 6F42 6H46 20186 TO O VA B 42 B 42 N 000?F 6F42 6H46 47205 CD S M O XA A 33 B 202 N 061?F LV66 END NNNN ----------------------------------------------------------------------------------------------------------------------------------------- POWER REPORT FOR NORTHWICH AT 13.31 ON 04.02.84 NOTHING TO REPORT OUT OF SERVICE LOCOS MAINLINE LOCOS ON HAND OK ********************LOCO DP SP T BK NEXT NEXT PREASSD O FUEL TIM-AV WTT ALLOC NO AL CH H TY RW EXAM MAJOR TO HRDY P HRS HRDYMO 1 2 LOCATION-37204- NORTHWHSD M&EE40022 KD C X XA A 7 B 181 N 065 F 110402 6H46 6F44 LOCATION -37233- MIDDLEWCH BRIT SALT40104 LO C X XA A 27? D -659 N 000?F 090402 LB31 TRAINS DUE TO ARRIVE WITH LOCOS FOR DETACHMENT ********************LOCO DP SP T BK NEXT NEXT PREASSD O FUEL E.T.A. TRAIN WTT ALLOC NO AL CH H TY RW EXAM MAJOR TO HRDY P HRS HRMIDY IDENTITY 1 2 LOCATION-37122- OAKLEIGH ICI 40015 CD C C XA A 1? E -564 N 042 F 125904 056M27C 04 LV55 25119 CD O VV A 35 B 204 N 035 F 150804 346F43C 04 LOCATION -37130- NORTHWICH BR 47049 HA M C XA NH A 19 B 56 HA 1631 N 000?F 134004 346F42C 04 47289 TE S M O XA A 44 B 185 N 028 F 141004 TRFD 0Z00R LOCOMOTIVES ALLOCATED TO ARRIVE ********************* LOCO DP SP T BK NEXT NEXT PREASSD O FUEL WTT TO WTTNO AL CH H TY RW EXAM MAJOR TO HRDY P HRS ARRIVE ALLOC LOCATION-37011- WINSFORD BR 25195 CD O VV NM A 35? D1614 N 097 F 4Z28 0Z00 LOCATION-37122- OAKLEIGH ICI40022 KD C X XA A 7 B 181 N 065 F 6H46 6F44 LOCATION - 37130- NORTHWICH BR40015 CD C C XA A 1? E -564 N 042 F LV55 END NNNNNNNNNNNNNNNNNNNNN I suppose it is all dependant on the boards available on the day but I could see this been a fun part of the set up. Cheers Steve Link to post Share on other sites More sharing options...
Talltim Posted July 17, 2014 Share Posted July 17, 2014 Before I start I'm aware that I may be coming across as trying to seem like an expert rather than a guy who has been to one meet and didn't manage to get his module complete enough to take!However...For the recent Freemo meet the idea was floated about 11 months beforehand and once there seemed to be enough enthusiasm Northpoint started organising the venue. This was simplified by it being the venue that he uses for the Trent Valley North American Modellers exhibition that he organises so another organiser or team might have to put some more work in.A date was set and people set to work building, some already had modules or layouts. About two months before the event people were asked what they would be bringing and Martyn started planning the arrangement. He would be able to say how hard this was to do.Once he had a rough plan he let people know and as far as I know no-one objected, however as an example of what could happen I warned him that my module would probably not be ready and he also made a plan B. As it turned out it wasn't ready, but luckily someone else had a module with a similar function (four end points) that could be substituted. As you say, only at this point could he start planning the operations.Even at the last minute Northpoint built a couple more plain track modules, as these didn't affect the operations it was simple to add them in, spacing out the feature modules.We had a fair bit of spare space left in the hall, I would imagine we would fill it quite well next year, so we didn't really have the issue of having to leave anything out this time. We probably had a surfeit of junctions but we only had one end unused, however the central junction module has 5 ends!As for choosing who did what, it seemed to me, at least to fall naturally to those with experience and who wanted to do it and as far as I know everyone was happy with that. Link to post Share on other sites More sharing options...
highpeak Posted July 20, 2014 Share Posted July 20, 2014 The thinking so far seems to be focused on the train, but perhaps you could also consider the working of the locomotive crew, since it seems that is more or less what most participants will be. I offer the following scenarios gleaned from various books, I have never worked on a real railway (though I have done a lot of volunteer work on preserved lines in Wales and the US). Scenario 1: as a young lad I was fortunate to be able to ride on the footplate of the engine that had worked the evening train from Manchester Central to Buxton. After arrival and shunting the coaches for the next morning's working, the crew took the engine to the shed for disposal. The last part of their shift involved taking an engine from the shed to the LNW side of the station to work the 8:25pm parcels train from Buxton to Manchester(Mayfield) , handing it over to the Longsight crew that would work the train forward, and then booking off. Scenario 2: freight service over the Buxton-Ashbourne-Uttoxeter line towards the end of the line's existence consisted of one train each way, the trains crossing at Alsop-en-le-Dale. To avoid spending a night away from home, the crews changed over at Alsop. I am sure professional railwaymen can offer much more insight into crew workings, I offer this as an idea to incorporate into operations planning, since a large part of what I am sure would be enormous fun would lie in being a driver on a large layout that could simulate operations on a grander scale than home or even club layouts. Link to post Share on other sites More sharing options...
Kenton Posted July 20, 2014 Share Posted July 20, 2014 Are you going to build a module Kenton? In with the spirit of have a go - if some other folk are prepared to compromise on their absolutes I can. Boards I can build, track I can lay, electrics no problem, I just stumble when it comes to the colour of my choice of bright blue ballast. It is likely to be simple and potentially boring (a single line through station ?) at least opening the door to participation and who knows but you don't build a railway then decide how to work it in real life actually I think the Victorians were quite good at it - starting out with a local purpose (stone to a quay) then others came along and thought it a good idea to connect everything to London and it would also be a good idea to have a gauge standard... Understanding the type of operation possible means you can choose to build modules that will complement others.While a great look to the future idea I do think that is well beyond us at the moment. The whole concept of interconnecting modules and the operating environment is currently alien to most in Britain. I can see it growing and such groups forming attempting to model prototypical lines but it has to gain overall and general appeal to include as many variations as possible. Not everyone cares for GWR or TOPS or BR blue era. I'm not going to get upset if I see a Class 37 thundering through my single line through station ... well perhaps not too much Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted July 20, 2014 Author RMweb Gold Share Posted July 20, 2014 Good While SR, LMS, GWR specific modular layouts aren't likely in this case anytime soon they do exist already, one local to me in 7mm! The advantage is at first you can concentrate on the train you are working and keep the limitation to a rough time period to start with until it becomes more established. Just ignore the blue ballast and loco Arranging 1/2 a day for a different period would require an hour or so to swap stock but as we ran from 11am to 9pm that's not going to spoil the day either as most halls can be open until 8 or 9 as they do for show setup and break down. A single line is potentially more interesting for this than double track as you need the order of a timetable and bring in the reality of waiting for your path. You might not be popular for stopping in section and picking mushrooms To some extent it will be quieter than any exhibition which gives you time to socialise and relax where real crews might pop in the pub in steam days. You could build in crew diagrams but that restricts the number of operators so allocating trains singly gives more people a chance and yet doesn't stop you booking on again for another go and another type of train. It also means you can pop out for an hour to a real pub if one is close by without bringing the whole line to a stop. You can have fast clocks to work a timetable by, or just follow the timetable order and wait for the train you are booked to cross. That's where the skill lies in creating the timetable for each meet and why a PC based system generating it allows a more consistent approach if it can be tweaked to represent TOPS lists or just a Working Timetable pre Tops. Link to post Share on other sites More sharing options...