RMweb Premium OnTheBranchline Posted March 26, 2015 RMweb Premium Share Posted March 26, 2015 Since there are quite a few steam engines being built in the UK, I was wondering which one is actually the closest to being finished? Link to post Share on other sites More sharing options...
RMweb Gold chris p bacon Posted March 27, 2015 RMweb Gold Share Posted March 27, 2015 Or a flip question could be "which are likely to be finished" I don't know about narrow gauge but I think the G5 is making good progress as is the P2 (even at this early stage) but I think there are a few that won't get far (Ok I'll say it.......The Clan...) I don't keep up with them all but It comes down to money, those 2 locos either have the large items purchased or a good business case and experience, whereas some of the others are trying to fund a multi million pound purchase with the proceeds from a jumble sale. Link to post Share on other sites More sharing options...
Mad_Hatter Posted March 27, 2015 Share Posted March 27, 2015 Interesting what you mean by "New Build" as do you call the Grange Class engine a new build or not. Link to post Share on other sites More sharing options...
RMweb Premium New Haven Neil Posted March 27, 2015 RMweb Premium Share Posted March 27, 2015 I think the Standard 3 tank will be OK too. Not so sure about.......the Clan.......Patriot maybe, although that does now have cylinders........and the J39 (Remember that? thought not). The 'rebuild' projects will mature I think. 47XX, Grange. Link to post Share on other sites More sharing options...
trisonic Posted March 27, 2015 Share Posted March 27, 2015 As a matter of interest, anyone have a list of just what is in the Works? Best, Pete. Link to post Share on other sites More sharing options...
RMweb Premium New Haven Neil Posted March 27, 2015 RMweb Premium Share Posted March 27, 2015 Oh Neil...really.....where is my head this morning.......of course 'Brown Bear' continues apace, halfway there with funding, and our Sea Lion project at Trackshack is a fund raiser for this project, as John and myself are deeply involved at the Groudle Glen Railway. We have erected frames, wheels, most of the (unusual) valve gear, cylinders are being machined as we speak, front bogie, smokebox, chimney and many little parts. We're about half way there with construction too, which will be picking up pace now our winter track laying is finished and work on the other locos eases off. Annie (our 10 year old Bagnall replica - we've done all this before....or at least our CME has!) has new cylinders made from the same castings as Brown Bear and is about to re-enter service too. Link to post Share on other sites More sharing options...
RMweb Premium John M Upton Posted March 27, 2015 RMweb Premium Share Posted March 27, 2015 When I last saw it at the Bluebell, Beachy Head was looking like it would make it to the finishing line without too much difficulty. Link to post Share on other sites More sharing options...
Unknown Warrior Posted March 27, 2015 Share Posted March 27, 2015 The Patriot is on target to steam in September 2017. By the end of this year all the big bits will have been manufactured. Next year onwards is mainly assembly. Bogies is a kit of parts. Most of the motion is in hand. Cylinders are currently being fitted to the frames. Inner firebox is a kit of parts to be assembled over the next few months. Boiler Barrel was rolled two weeks ago. Tender due to be complete by the middle of next year. Just need to keep the money coming in! Could well be the next new build to steam. Link to post Share on other sites More sharing options...
PGC Posted March 27, 2015 Share Posted March 27, 2015 Apologies, I saw the thread title and thought "Tornado's already finished", so why ask the question? Phil Link to post Share on other sites More sharing options...
Bulleidnutter Posted March 27, 2015 Share Posted March 27, 2015 You could do with having a look on NP where this topic pops up every month or so it seems. Link to post Share on other sites More sharing options...
RMweb Gold The Stationmaster Posted March 27, 2015 RMweb Gold Share Posted March 27, 2015 The 'Saint' is well on at the GWS but it is a kitbash in many respects although a lot of it is genuinely new. Link to post Share on other sites More sharing options...
RMweb Premium melmerby Posted March 27, 2015 RMweb Premium Share Posted March 27, 2015 The 'Saint' is well on at the GWS but it is a kitbash in many respects although a lot of it is genuinely new. Aren't most of the GWR "new" locos just that? Keith Link to post Share on other sites More sharing options...
trisonic Posted March 27, 2015 Share Posted March 27, 2015 You could do with having a look on NP where this topic pops up every month or so it seems. I dunno what NP means. I’m a member of the “colonies”.... Actually your comment may not have been aimed at me. Best, Pete Link to post Share on other sites More sharing options...
Bulleidnutter Posted March 27, 2015 Share Posted March 27, 2015 NP = National preservation forum. Only going on latest updates from various projects. The Patriot and 82045 should be finished (funding and work permitting) pretty close together. 6880 needs the have the boiler and other work done on the chassis. 32424 needs the boiler to be overhauled as well. The G5 has just moved across the road from RRNE in Shildon. Going off their updates and flickr photos. They aren't far off the long run to final assembly. The P2 is quietly but very quickly coming together in Darlington. But the usual caveat applies to any new build and loco overhaul. They will be ready when they are ready. I will throw one loco into all of this "new build" just simply by going on how much work has had to be done on the loco. 34027 is coming along very quickly inside Bridgnorth. May the 16th is a looming date when the loco has to be ready. It is all hands to the pumps to get her finished. Link to post Share on other sites More sharing options...
RMweb Gold Corbs Posted March 27, 2015 RMweb Gold Share Posted March 27, 2015 Samson http://beamishtransportonline.co.uk/category/samson/ Link to post Share on other sites More sharing options...
RMweb Gold Phil Bullock Posted March 27, 2015 RMweb Gold Share Posted March 27, 2015 My money would be on 82045 see http://www.82045.org.uk/ for progress Phil Link to post Share on other sites More sharing options...
Ed-farms Posted March 27, 2015 Share Posted March 27, 2015 This website is quite good for updates on most new builds http://newbuildsteam.com/regular updates allow you to see how all are getting along. Link to post Share on other sites More sharing options...
Vanders Posted March 27, 2015 Share Posted March 27, 2015 Not steam, but do we count the Baby Deltic Project as a new build? Link to post Share on other sites More sharing options...
sir douglas Posted March 27, 2015 Share Posted March 27, 2015 Samson is currently my favourite new build, been following that from the start. somewhere there s a Bloomer which will look nice Link to post Share on other sites More sharing options...
Chris Bridges Posted March 27, 2015 Share Posted March 27, 2015 What about 762 LYN, that's hoped to be completed at the end of this year I think. Chris Link to post Share on other sites More sharing options...
Londontram Posted March 27, 2015 Share Posted March 27, 2015 Not steam, but do we count the Baby Deltic Project as a new build? Is the plan for the LMS 10000 project still happening? Link to post Share on other sites More sharing options...
ben racey Posted March 27, 2015 Share Posted March 27, 2015 As mentioned above, LYN looks likely to steam this year.... Regards Richard. Link to post Share on other sites More sharing options...
Mad_Hatter Posted March 27, 2015 Share Posted March 27, 2015 I dunno what NP means. I’m a member of the “colonies”.... Actually your comment may not have been aimed at me. Best, Pete P2 https://www.national-preservation.com/threads/p2-locomotive-company.126427/ 82045 https://www.national-preservation.com/threads/82045-the-way-ahead.13780/page-39#post-1111104 Patriot https://www.national-preservation.com/threads/lms-patriot-project-updates.30546/ G5 https://www.national-preservation.com/threads/ner-class-g5-no-1759.354157/ And all the news https://www.national-preservation.com/threads/next-new-build-to-be-completed.434013/ Link to post Share on other sites More sharing options...
PLD Posted March 27, 2015 Share Posted March 27, 2015 Samson http://beamishtransportonline.co.uk/category/samson/ What about 762 LYN, that's hoped to be completed at the end of this year I think. Chris A race between those two for the next 'new build' to steam. Both well thought out and well funded schemes. Of the Standard guage schemes, the only one I have full confidence in competion in the target timescales is the Patriot 'Unknown Warrior'. Of the others there seems to be a lot of good intent, but in many cases too much wishful thinking and too little funding... Link to post Share on other sites More sharing options...
durham light infantry Posted March 28, 2015 Share Posted March 28, 2015 There is only 1 loco with a deadline to meet, and that is the Patriot. Mike Link to post Share on other sites More sharing options...