Jump to content
 


ellss
 Share

Recommended Posts

  • 2 weeks later...
  • 2 weeks later...

Some progress on the platforms, ive pre-drilled holes through the baseboard to accept the platform lighting, i want to do this at a later stage to avoid damage - the trick will be threading the cables!

Ive also put in some ohle masts, im going to have a go at 'stringing' the platform area using 0.4 and 0.5mm wire - a true test of my soldering abilities....

 

post-17314-0-60162800-1546819964_thumb.jpg

 

post-17314-0-11351000-1546820250_thumb.jpg

 

Ive made a switch board for the points, many happy hours of wiring to come.

 

post-17314-0-14577000-1546820358_thumb.jpg

  • Like 2
Link to post
Share on other sites

  • 1 month later...

The retaining wall continues to be put in. Im thinking that i will put a thin piece of hard wood behind the retaining wall as a 'ground level', with the back of some industrial units as a backscene. The wall will be weathered too. 

 

IMG_7506.JPG.444b2fd1fd890ddc527684a4341e723d.JPGIMG_7509.JPG.d794ea83b5305aa4c03760b1dab87619.JPG

 

Along the unused platform face will be a 'disused' platform, overgrown with weeds and shrubs. Some plaster painted black as a base. 

 

IMG_7512.JPG.09211a18706c8a8670f24a6356f8c1a6.JPG

  • Like 5
Link to post
Share on other sites

  • 2 weeks later...
  • 3 months later...
  • 4 months later...
  • 4 months later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...