Jump to content
 

Northwick a oo gauge layout by Twickenham & District MRC


Northwick Group
 Share

Recommended Posts

Twickenham & district MRC will be holding an event at twickenham library, Garfield Road, TW1 3JT from 10am to 3.30pm this Saturday (25th), it is a free event and there will be 2 working layouts there and is aimed to showcase what the club gets up to, so if you're wanting something to do then why not come along. Northwick will be there with the goods yard board and the station board, so come along and have a look.

Edited by Northwick Group
Link to post
Share on other sites

Since the last update quite a few things have been done, the first being to fix the triangular piece of wood along the top of the station board back scenes.

 

35313191310_4b2f6a9b6e_c.jpg

 

some of the details were added to the cattle dock, as well as the fencing receiving the first layer of weathering.

 

35313193650_547038ab2a_c.jpg

34859282224_4a216004c0_c.jpg

 

The coal merchants office has been fitted to its new position along with the staithes and the fence poles for the edge of the field on board 1
 

35661123666_8588d04e38_c.jpg

35661124626_c9c99cf8cc_c.jpg

34859282104_ae0ddf1faa_c.jpg

 
The grounded wagon body for the timber yard was first painted grey then brown and finally blue with the intention of gently rubbing back through the layers to expose the colours so that it looks as though the paint is peeling off, the roof has also been fitted and has been made to look like the roof canvas has ripped. This was made from a layer of brass with a piece of slaters plastic planking stuck to the top, this was the followed with taking a square of toilet paper, separating the 2 layers and ripping a small hole in 1 layer before sticking it to the plastic planking using plastic weld, the excess paper was then trimmed off and painted in primer, the exposed planking was then given its base colour.
 

35313195870_b1ba79b8a6_c.jpg

34859283434_40005aac67_c.jpg

35313196070_a28c752511_c.jpg

 

A new tree has also been made by Tim and fitted to board 1.
 

34859281854_24e787de22_c.jpg

35661125116_c3b843bca6_c.jpg

34859281964_39a024d71c_c.jpg

35569646451_c65661a135_c.jpg

 

And finally the name for the hotel has been applied.
 
34859283294_cfef5582a5_c.jpg
Edited by Northwick Group
  • Like 3
Link to post
Share on other sites

It's been a long time since I posted about the new weighbridge. I apologise but real life (i.e. the new job) has slightly got in the way.

 

post-20561-0-21565700-1491342681_thumb.jpg

 

Fred is issuing a 'chitty' through the partially open door while answering a phone call.

 

post-20561-0-33766100-1491342713_thumb.jpg

 

The windows(and glazing) have been attached to the apertures

 

post-20561-0-14223400-1491342747_thumb.jpg

 

Karl is processing the latest delivery while Fred is at the door.

 

post-20561-0-24798200-1491342782_thumb.jpg

 

Another angle of Karl

 

post-20561-0-03826900-1491342856_thumb.jpg

 

Another view of the interior of the weighbridge

 

post-20561-0-14396200-1491342885_thumb.jpg

 

The weighbridge paired up with the weighplate (I wasn't impressed by the the plate provided by the kit company (Ancorton)so I decided to use the plate from the original Northwick weighbridge. 

 

post-20561-0-18064500-1491342918_thumb.jpg

 

Another view of the weighbridge interior paired with the weighbridge 'plate'

 

 

post-20561-0-86561100-1491342947_thumb.jpg

 

The weighbridge minus the roof but with the weigh plate.

 

  • Like 4
Link to post
Share on other sites

  • 2 weeks later...

Over the past 2 friday evenings we have been busy making sure that everything on the to do list is completed before our next exhibition outing which is the West Essex Modelrail which is on the 22nd/23rd April, why not come along and see the additions to the layout in person.

 

the first evening we spent trying to blend the existing grass on board 2 with the new grass. The new grass was too green so we have gone over it with a mixture of straw, burnt grass and hay to help blend it in, it looks a lot better now but we may have to have another go in some places the joint of old and new can still be made out mainly due to there being no bushes, trees, etc. on the extension yet.

 

35721627175_436813d8e5_c.jpg
34912144703_70d3796c6f_c.jpg
 
Last friday evening we spent testing the layout and some of the stock to make sure that everything was working as it should be, fortunately it was so we had a running session with the theme this time being "Exhibition", here are a couple of pictures of what was running.
 

35313195190_27f68b95d5_c.jpg

34859283024_74e92250b2_c.jpg

35334720630_4e28ccd6b8_c.jpg

35721707375_59d5abb429_c.jpg

35590642211_da541b4557_c.jpg

 

Also running was a newly weathered 9f which is pictured here outside the engine shed.
 
35313195380_764e18867b_c.jpg
 
As you can see a person who shall remain anonymous is trying to give a subtle hint about the cleanliness of the loco.
 
34859282864_b563248a7c_c.jpg
Edited by Northwick Group
  • Like 3
Link to post
Share on other sites

  • 2 weeks later...
  • 3 weeks later...

Last Friday was the monthly running session for Northwick, the theme for this month was unique/unusual prototypes and there was a great selection running.

 

Kestrel is seen pulling into the station

 

35531536002_943f07f72f_c.jpg

 

DP2 was also seen arriving with the Hawksworth dynamometer car in tow

 

35661178486_4277978c84_c.jpg

34859342774_b620d1823d_c.jpg

 

Lion was resting between duties

 

34859290684_7175eea471_c.jpg

 

Kestrel passes lion with the great northern directors saloon and the LNER dynamometer car in tow

 

35313254820_9ab815b23e_c.jpg

 

a close up of the great northern directors saloon and the LNER dynamometer car

 

35313258220_ee1f8d384f_c.jpg

 

Gas turbine prototype 18000 also made an appearance.

 

35700525185_4c3f8a4905_c.jpg

 

Lion, kestrel and 18000 are seen posing in the engine yard.

 

35531511532_1d95d26a5f_c.jpg

 

De Glehn class "President" is seen here on the way to the turntable

 

34859290684_7175eea471_c.jpg

 

The only 4-6-2 paciffic built by the GWR "The Great Bear" arrived.

 

35700473555_99808bcd4b_c.jpg
35700473265_4c187df67c_c.jpg
 
which was followed by a strange looking beast, a Dean goods locomotive with pannier tanks added to the side of the boiler along with condensing gear and Westinghouse brakes.
 

35313246820_07a4c5c4c5_c.jpg
35700556185_51e43c4168_c.jpg
 
The Duke of Gloucester also made an appearance with a freight train which consisted of the 12 axle GWR Crocodile L with flat girders, 12 axle GWR Crocodile L with the well girders, 6 axle 40 ton LMS well wagon, GWR Crocodile F, GWR Bogie open wagon (known as a Tourn), GWR Mink F and LMS 40 ton bogie brake van. All of the wagons except the last 2 have been scratch built by Tim Thomas.
 

35700472935_af29721f47_c.jpg

35313207420_0c31cbf144_c.jpg

35700472585_d9ea03a73b_c.jpg

34859345234_c60d052367_c.jpg

 

 
Although the freight train only consisted of 7 wagons the total length was just under 6.5 ft!
 
 
Edited by Northwick Group
  • Like 5
Link to post
Share on other sites

  • 1 month later...
I hadn't realized that it had been over a month since the last update from northwick, this is not because we have disappeared but work has been getting in the way of the updates however we have been busy working on the layout during this time.

 

One thing you may notice is the lack of pictures on the previous posts this is because photobucket (the website i use to host the pictures) has recently changed their T's & C's and now have to be paid an extortionate amount of money for the links to work again so I am now in the process of transferring the photos to another site and will be working through the previous posts and updating the links. 

 

There was a running night in June and the theme was preserved.

35569701071_676b54b8bf_c.jpg

35531508622_015b501555_c.jpg

Ex LBSCR class E4 473 AKA Birch Grove is seen running with a rake of maunsells

 

35313268370_ef7208916e_c.jpg

LSWR adams radial 488 hauling a rake of wagons

 

35661180626_9959869c06_c.jpg

A pair of class 20's - D8000 & 20242, sit in the engine yard

 

35661180626_9959869c06_c.jpg

BR Standard 5MT 73082 Camelot departs

 

35569701771_698e5c3a0d_c.jpg

BR Class 46 d172 passes class 20042

 

35569702361_1e95666297_c.jpg

The 2 BR adams radials double head the coaches

 

35569701461_1d68ab05ef_c.jpg

A bit of an if only, preserved Adams radial sits outside the engine shed with 2 of its class mates 30583 + 30584

 

35661180356_8b8ba81a24_c.jpg

These were then joined by Ex LSWR class 02 24 calbourne

 

34859346964_cccd923b44_c.jpg

BR class 47 47401 awaits to depart

 

35661181176_f403fe682b_c.jpg

BR class 08 08417 was busy shunting

 

35569700841_609e03f0a5_c.jpg

Class 57 57305 in northern belle livery was also seen having brought in a rail tour.

 

More posts to follow on progress made elsewhere on the layout.

  • Like 2
Link to post
Share on other sites

I've just been told that NORTHWICK will be running at Twickenham MRC's Open Day on July 22nd - great news!

 

If you're enjoying this thread why not come down and see the layout operating and talk to the crew - new members always welcome!

 

See details of our Open Day here......

 

www.tdmrc.org.uk

Link to post
Share on other sites

One of the main projects that we have been busy working on is the archaeological site on board 2 the aim is to have a roman villa being dug complete with a roman mosaic being slowly exposed by the diggers, there will also be crop marks on the grass around the trench indicating where the walls are underneath the ground. So the first steps were taken and the trench was marked out and the grass was taken off.

 

34934098743_3408776c30_c.jpg

35574506682_c9572ae16c_c.jpg

 

There hasn't been too much in the way of progress with this as we have had issues with creating the walls for the villa, first we used maliput but this set a bit too hard for us to carve easily once dry and so it was decided to do away with this and whilst at it we also decided to deepen the excavation as it was looking too shallow.

 

35743648515_a58030e68b_c.jpg

 

So once the maliput walls were removed and the trench was deepened, new walls were created using silk clay which was chosen as it gave a good base colour for the walls and dried in the air so this was left to harden during the week.

 

35743651235_c4b60bb8e6_c.jpg

 

When we returned the following week we found that although the walls had dried they couldn't be calved because the silk clay had dried to a spongy finish so this wouldn't work either, so we returned the following week with Das air drying clay . So we set about removing the walls made of silk clay and before putting the replacement walls in we painted the polystyrene brown so that any bits that we may miss with the dirt that will be put in the trench shouldn't be too obvious, the new walls were then put in and having tried the sample piece it should calve nicely

 

34902189064_787e450570_c.jpg

 

You will notice that at the moment the walls are all of a uniform height (just under the grass level), we decided that we would make them of a uniform maximum height and then carve them to the desired uneven height.

  • Like 1
Link to post
Share on other sites

  • 2 weeks later...

As some of the trees are beginning to look a bit tired the decision has been taken to either refurbish the ones that don't look too bad and in some cases completely replace the existing tree with a new one. Whilst doing this we also decided to move the tree that had been put on board 1 from its current position, this was because it was near the front edge of the layout and as it is a delicate tree compared to the others it was getting damaged quite easily, it has now been moved to the field with the scouts in on board 4 and the existing tree removed to be refurbished and returned to the layout. Here are some picture showing which trees have been moved.

 

The existing tree on board 1.

34859281854_24e787de22_c.jpg

 

The other existing tree on board 4.

35079644014_fc3d54cd62_c.jpg

 

The tree from board 1 in its new position on board 4.

35787376851_351f61160d_c.jpg

 

1 of the trees earmarked for replacement was the main big tree on board 2, here it is before anything happened.

35531112880_f6a82780eb_c.jpg

 

It was decided to replace this one as when it was re-done last time we noticed that the armature of the tree wasn't constructed very well and so couple this with the fact that it was very dense and so obstructed a lot of the layout behind a new more open tree was made to take its place.

 

35079224684_e23e51e934_c.jpg

 

The other tree that has been replaced is the big tree in the scouts field, our intentions were originally to just refurbish this one as it had the tree house in, however upon removing the greenery it was found that the tree didn't look very tree like as all the branches pointed straight up so it was decided to replace this one with a new tree and fit the tree house to the new one.

 

Here is a before and after picture (sorry for the poor picture but I cant find a better one showing the old tree)

35660464796_6cb429498f_c.jpg

 

Here is the new tree in position complete with the tree house which has been placed so that the kids can see it easily and the adults have to take a close look to see it.

35787026371_6d72394af7_c.jpg

35918870815_157f5be2f0_c.jpg

 

Some of the other trees to receive some attention were the trees that go along the back of board 4 as they were beginning to look a bit tired, so the were re-covered with new foliage and put back into position, whilst doing this we noticed that not only had the been all planted in a row but they were almost all the same exact height so this was addressed too.

 

Here's a before shot.

35787026231_e653de6cb4_c.jpg

 

and after

35079224514_4f564b12cd_c.jpg

 

There is still more work to be done to the remaining trees on the layout but what do you think so far?

Edited by Northwick Group
  • Like 3
Link to post
Share on other sites

  • 3 weeks later...

A bit of a big update this time as since the last update we have been very busy with progress made on several fronts, so I will start off from where we left the last post - trees. The last of the trees that needed refurbishing on board 4 have been done and a new tree added to behind the church in the form of a copper beech to add a bit of colour, here's an over all shot of how borad 4 looks now.

 

36198201931_b4f6b0dec3_c.jpg

35938115860_c74b460f5e_c.jpg

 

We have also added another tree to the front corner of board 4 to help hide the edge of the back scene that separates the fiddle yard from the layout.

 

35530693030_d6d1843812_c.jpg

 

Once it had been stuck in place we then adjusted the roots to how we wanted them and then added soil around the roots and stuck that down too.

 

36165822572_fe1266e325_c.jpg

36198184861_18de02ea12_c.jpg

 

A couple of shorter trees were added to the boards 1&2 to help hide the board joint whilst not obstructing the overall view of the layout.

 

35957621710_386cfd4293_c.jpg

36217632151_5484d2048c_c.jpg

 

Now onto the other main project which is the archaeological site, since the last post the walls have had their stones carved into them and the tops of the walls made less regular.

 

35525987473_131b3b220f_c.jpg

 

they were then given a base coat of paint.

 

36165869522_1393fe21a8_c.jpg

 

various brown and black washes were then added followed by some dry brushing of  greys and lighter browns. 

 

35938070400_b7eceff3f8_c.jpg

36198183011_b9fe100e7f_c.jpg

35525986323_35d71f638a_c.jpg

 

On the 22nd of July it was the clubs open day and the scenic parts of Northwick were set up as part of this, for the open day we temporarily added a mosaic to the main room of the roman villa to give an idea of whats to come.

 

36165830162_f7a88cd111_c.jpg

 

For the open day as we had the goods yard set up so that it could be shunted and posed the rest of layout as though there was a blockage further down the line which prevented the passenger trains from operating so there was a bus replacement service running. 

 

35938072270_0ab05c4031_c.jpg

36198177541_2189fac3f3_c.jpg

36290439556_5666bd920e_c.jpg

35498720514_9a3e3054b4_c.jpg

36334589855_4d75007600_c.jpg

36198176371_b1bfffc07a_c.jpg

36290442906_9a2e87b54d_c.jpg

36165836282_2e309ff5bc_c.jpg

36198167331_582ee2aba5_c.jpg

 

  • Like 1
Link to post
Share on other sites

Last Friday we made more progress with the roman villa dig as it has now had the soil added, we also extended the trench slightly so that it continues on a little bit beyond the walls that were right up against the side of the trench. 

 

36079988880_4c30101ecc_c.jpg

36430975346_1e3be15413_c.jpg

36430975286_7df8c6d015_c.jpg

 

The next step will be to start adding some of the details to the dig site such as a more damaged version of the mosaic and diggers.

  • Like 4
Link to post
Share on other sites

  • 2 weeks later...

Last friday night was the layouts monthly running session and the theme for this month was the eastern region, here are some pictures from the running session.

 

36511423711_ee86b99313_c.jpg

Class A4 Dwight D. Eisenhower pulls into the station with a set for gresley stock.

 

36649707275_648974b37c_c.jpg

BR Standard class 4 75027 is turned whilst class A1 60147 North Eeastern arrives with a mixed rake of thompson and BR Mk1 stock.

 

36511423851_da78cb74cf_c.jpg

Class J72 68723 was on shunting duties.

 

35840559723_97a43310d5_c.jpg

Class 45 pulls in to the station.

 

36649707355_45734a5036_c.jpg

Class A1 60147 North Eastern is turned

 

35840739743_c37c255668_c.jpg

Class A2 Blue Peter poses alongside Class A1 North Eastern

 

36649706635_91378081b0_c.jpg

Class A4 Dwight D. Eisenhower awaits its next duty in the engine shed.

 

36511423801_5970f5c640_c.jpg

BR standard class 4 75027 arrives with a set of thompson coaches

 

36253459560_6530aea9d6_c.jpg

an interesting shot with the archaeological dig in the foreground and BR standard class 5 awaiting to couple up to its train in the background.

  • Like 1
Link to post
Share on other sites

  • 4 weeks later...

since the last update progress has slowed a bit with holidays getting in the way, the main things to have happened with the layout was- sheep being added to the field on board 2.

 

37057997202_dd68d00a3a_c.jpg

 

there is going to be a fence boundary added to the left of the heard of sheep which is why they currently end abruptly, also the farmer has dropped of some pigs to the cattle dock.

 

37230002645_21dfd4b716_c.jpg

37039325236_c6d8e0aa0f_c.jpg

 

We also had a running session on the layout and the theme this month was exhibition which is where we run what we would run normally. Here we have envening star arriving with a blood and custard set of stannier coaches.

 

37086957331_c96cdc5f08_c.jpg

 

and later on in the evening Tavistock was also seen running with the same set.

 

36832043730_4acbe2ed0d_c.jpg

Link to post
Share on other sites

  • 2 weeks later...

since the last post, the wire fence on board 2 has now been installed, we decided to go for a wire fence as it was the simplest type to do when the gradients of the land is taken into account.

 

23524169518_0d0cd1b590_c.jpg

37375976691_57d8d54ba4_c.jpg

37346021952_ec26996da0_c.jpg

 

we have also been sorting out the road on boards 3&4 as the join between old and new road was beginning to show, the first step was to paint the whole of the new road surface again witha mixture of black, brown, grey and off white to help blend it in with the existing.

 

 37375971731_a770302058_c.jpg

37328610876_54280ed806_c.jpg

36706241493_cce9444118_c.jpg

 

The next step will be to apply a mixture of ash and dirt to further blend it in and to weather the road some more.

  • Like 1
Link to post
Share on other sites

Last Friday we adjusted the wall that usually sits over the board joint between boards 1&2 so that the collapsed part of the wall falls between 2 tree trunks which could give an interesting angle with a loco behind it. Whilst we were adjusting it we drilled 2 holes in the bottom of it and inserted nails with their heads chopped off so that it will make it easier to get the wall in the correct position in the future as the nails locate in holes in the field.

 

36806627644_f7f167b159_c.jpg

 

We have also started work on trench 2 of the archaeological dig which will result in a ditch being uncovered and possibly some finds.

 

37468657616_5fae844d66_c.jpg

could this be a hint of what could be found in the trench?

 

37468657076_a677d07044_c.jpg

the position of the ditch is marked out.

 

37485487082_21ec4646db_c.jpg

and then dug (although it does not show up very well in this picture).

  • Like 1
Link to post
Share on other sites

The soil has now been added to the second trench 

 

36949291654_dda596ea6d_c.jpg

 

Also the badger that used to be underneath one of the trees on board 2 has been moved as it was right next to the first trench of the archaeological dig. The badger now lives next to the wall on the board joint between boards 1&2.

 

36949291654_dda596ea6d_c.jpg

37402087140_8794c1c5ee_c.jpg

 

The opportunity was also taken to pose a locomotive in the gap between the trees and wall.

 

23807098488_db08b77a05_c.jpg

 

We have also moved the sheep around on board 2 as they were not quite looking right, after some scratching of our heads we decided that it was because all of the sheep were evenly spaced so we have moved some of them around, created groups of them and left some open spaces - this seems to have solved the problem.

 

23807098488_db08b77a05_c.jpg

  • Like 1
Link to post
Share on other sites

Last friday we had a running night, this time the theme was tank locomotives, and there was a very good turn out.

 

37540323730_ae1c76389f_c.jpg

USA tank turned up with the goods.

 

37766440162_48ba4a4fb4_c.jpg

GWR class 14xx arrived in the bay platform

 

37088854714_108d9385cc_c.jpg

BR standard class 2 tank with the first passenger service

 

37766444292_18f3e5f8f9_c.jpg

BR standard class 4 tank also turned up.

 

37128342863_cfcaaff264_c.jpg

Along with a pair of class O2's

 

37540331790_4675f4fb7f_c.jpg

A pair of Adams radials made an appearance.

 

37088857424_db6835d715_c.jpg

Class E4 turned up with another passenger service.

 

37540333500_cafdb445be_c.jpg

Class 45xx and 8750 double headed.

 

37540336470_00bd4590cb_c.jpg

A pair of 1F's got turned on the turntable.

 

37128354823_1e28265e36_c.jpg

Class 64xx arrived with the next branch line service.

 

37128355213_e9e34feb5c_c.jpg

LNER class J94 shunted the wagons

 

37088862234_7122a154de_c.jpg

and was later pictured between duties.

 

37128373593_79ae8b01cb_c.jpg

Nettle sat on shed for the next duty.

 

37128343773_f80580f12a_c.jpg

3 Standard 4 tanks lined up for a photo.

 

37088857814_74475899e5_c.jpg

which were then joined by a 4th grubbier one.

 

23945692568_2928b20fd2_c.jpg

there was also a bit of a bluebell railway line up with 3 standard 4's (80064, 80100 & 80151) along with standard class 2 84030

 

37128352083_1a288fa2f2_c.jpg

Then all of the standard tanks were lined up (1 standard 3, 4 standard 4's & 2 standard 2's)

 

at the end of the night all of the tanks were lined up.

37750084616_eef4497373_c.jpg

37088856434_c66d8fe722_c.jpg

  • Like 2
Link to post
Share on other sites

Work has now resumed on the archaeological site with the main focus currently being to install the mosaic, the first step was to turn the mosaic from this.

 

38089728042_fdd34776ca_c.jpg

 

To this, so that it is more like what you would find in a dig.

 

38066917496_69bd295fe7_c.jpg

 

All of the parts of the mosaic were then put into a matte finish laminating pouch, put through the laminating machine and then all of the parts were cut out again but leaving a section of the lamination pouch between where we were cutting and the edge of the mosaic piece. 

 

26344755489_1e1e2875b6_c.jpg

 

This was done to help make the mosaic water resistant for when we add the scenics around the pieces.

 

Some of the pieces were then added to the trench and stuck in position.

 

37411899084_96e960fc39_c.jpg

26344757229_7353b49f50_c.jpg

37412831794_db33df65f9_c.jpg

 

The next step will be to add soil and diggers to the trench along with some finds.

  • Like 1
Link to post
Share on other sites

  • 2 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...