So this morning ii received a call saying 828 is ready for collection after having some rivets replaced due to tightness stopping easy movement of the chassis

 

so looks like the airbrush has another job for tomorrow wen she returns 

 

she will put under restoration loco count up to 

 

these locos are 1/. Swanage 34105, 76017, 75079, douglas (j94 conversion), 27007, 45132, 30499, 

 

just leaves 30506 left and 31806 as an alternative loco so either in use or in the shed in final stages 

 

 

do i make 34058 and 80150 although they have never come to Ropley?? hmmm...

 

 

i am still thinking of getting Braunton but need to figure out the tender since it will need custom modifications made to suit 

 

as for stored locos 41312 will need some rods off i believe and 30076 still needs to be bought then just the U tender that was never finished 

 

 

post-14552-0-22033200-1456485636_thumb.jpg

  • Like 1
Link to post
Share on other sites

So after a long day yesterday more work has been done to the Alresford end where the point out of ropley is being included into the scene for mays two appearances

 

The fiddle yard curves on this end have also started with board construction being planned for next week's assembly. So far trunking is in the board is wired and point rodding is partly in although I am a pack short doh

 

Hills are also in temporary ready for cutting to shape once wooden ends are on

 

 

Once thos board is completed work will start on the sheds to complete the shed roofs and interiors

 

Chris

Link to post
Share on other sites

So update wise 828 has now returned from having motion freed up and looks good 506 has escaped it's box and sits waiting for me to start. The end board Alresford end has been made ready for the hills this weekend. The water crane for the platform has also arrived and the crossing hut. Wadebridge has a lot arrived in the guise of Bude so some work here to be done.

  • Like 2
Link to post
Share on other sites

  • 4 weeks later...

little update

 

not a lot has happened recently although i can post some photos tommorrow to show progress

 

the extension is pushing on nicely with signals about to be ordered for Alresford end

 

the banks are now carved to take the path that will be laid tommorrow

 

wadebridge has now been made but still numbered as 34001 numbers are due anythime to finish her off

 

Bodmin has now been completed and looks smart

 

30506 has been started but has a long way to go yet!!

 

more detail has been added to locos as well as more to the sheds which is waiting to be positioned and glued in

 

my 2-6-0 42xx tank is having running issues and will need sorting prior to its next appearance which is over a month away

 

the fiddleyard turning circles have been remade and are awaitng a full test

 

my first yard board has started another wire through where i missed some droppers last time round too

 

will post tommorrow all the photos to show

 

Chris

Link to post
Share on other sites

  • 3 weeks later...

So I have decided that over the years of building ropley I have missed out areas in detail etc to get the layout ready for shows. Well over the last few weeks this has changed with the intention now to complete the majority of projects on the line. Lots has happened to make this possible so far the new fiddle yard curves are completed all boards re painted the new scenic board will receive it's greenery tomorrow, the footbridge has had a repair and edge capping added, the building site is now in basics with scaffolding building materials fencing and a few people. Rople Manor has had some junk added into the car park. The carriage shed roof material is finally in stock so will hopefully be ready for Brockenhurst show. My fencing is being made ready for fitting as well as trees. Pictures will follow tomorrow showing all goings on but I hope to complete former projects by July to start others ready for September

 

Chris

  • Like 7
Link to post
Share on other sites

morning all

 

pictures are a bit late as work forgot to book my holiday in

 

pictures of progress will be posted when my camera lead turns up :(

 

currently the boiler shop side of the layout is my main focus

 

the layout is getting ready for the victory model railway show on the 14th shortly followed by Brockenhurst

 

still so much to do but its getting there

 

the pictures show the boiler shop and carriage shed sides are missing these are currently having a new paint job as well as the doors added guttering will follow after the completion of my roofs

telegraph poles have been wired up

trees are emerging up by the bridge as well as completed hedges

water tower repaired

shed roofs for wheeldrop shed near completion

containers in boiler shop have a completed platform

signal box roof repaired

building site finished until ordered items arrive

 

I hope to have the boiler and carriage shed details finished by the end of may just need to find who does carriage doors and other small details suitable

 

with the yard almost done just means some more figures and some bulk items to be scattered

30499 looks a bit de cluttered considering the condition she is in so that area will be focused on after the shed

then it will be onto the main shed getting that up to spec with more details

then the wheeldrop shed made up with details completed and I might get round to building the inner frame which I bought all the materials for yesterday

I am looking into a proper backscene too which will be the real thing so that could be good

then get all signals in

then it will be time to extend hopefully for her show in September and October

 

cheers

 

chris

 

 

 

good thing the roofing sheets turned up yesterday only been on order since October must have had a heavy hit on them

 

 

Link to post
Share on other sites

Ropley had a good outing yesterday after the first of the two new fiddle yards decided to play ball not to long a delay in problems

 

Lots to do for Brockenhurst in 2 weeks but we will manage layout is going back into its cradle today so I can start the next step

Chris

Link to post
Share on other sites

  • 2 weeks later...
  • 2 weeks later...

sorry buddy

 

ropley has now returned home of course and is currently getting a new crradle

 

i have ordered wayyyy to much detail accessories to complete off all my sheds before roofs are added

 

ropley also now has the green light for a 6 foot extension to happen making the layout 30ft total now with the option of taking that off too.

 

just means now lots more locos to build got to crack on with 30506 who i keep putting off :( and finish the paint job to 30828 to start with

 

ropley lighting rigs are also in testing too with the intension of being used with options of some on some off etc

 

the arc welder barrel of burning wood and camera man look good ;)

Link to post
Share on other sites

  • 3 weeks later...

so much more to report on ropley at long last

 

unfortunately the camera lead is missing to connect the camera for photos to be posted

 

at long last after brockenhurst much work has progressed on meaning the layout is in full swing of its upgrade

 

so what has happened

 

all the new brass fencing has now been installed along the fron of the layout having been sat in a box for well over 6 months

the wheeldrop shed has been re painted and detailing has commenced i just have the window ledges left and gutters and facia boards

 

the signal box is also being detailed with fire buckets steel container underneath gutters and downpipes too

 

the platforms are to be re sprayed with the walling weathered to blend better the plaform tops pained and lined too

 

the grass banks are ready to be freshed up as it is looking dull

 

all the platform details are made except disabled ramps Does anyone make these??

 

the car park is complete and a few more building items are on the way

 

shed roofs are nearly finished too

 

i hope to upload the photos soon to show the progress

 

chris

Link to post
Share on other sites

  • 1 month later...

evening all

 

 

ropley is slowly starting to re gain momentum mainly focusing on stock again

 

more detail work has happened sorting name plates small detais on platforms and more

 

i will post photos in the morning but for now here is a few shots taken a month ago on the line

 

Chris

 

post-14552-0-50835800-1471216348_thumb.jpg

post-14552-0-09051100-1471216388_thumb.jpg

  • Like 3
Link to post
Share on other sites

  • 4 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...