nimbamoss Posted April 5, 2010 Share Posted April 5, 2010 http://www.c37lg.co.uk/ The Class 37 Locomotive Group in conjunction with Bachmann is pleased to announce a Limited Edition collector’s model of 37003 in BR Corporate Blue livery (Bachmann Model number 32-775Z). The model will incorporate the very latest Bachmann 37/0 chassis, with the following features: 21-pin DCC Decoder socket Full Directional Lighting and Cab interior lights. (In a first for 37s there will be switches for controlling the Cab Interior lighting and control of the tail lights) Switchable Head Code panels. All models will be supplied with two sets of Head Code panels, one set of dominoes (black background with white dots) and one displaying the headcode 1E33. This allows users to portray the loco operating from the 1970s to the early 1980s, before the buffer beam cowling was removed. Revised BR Blue Livery (as applied to the model of 37254) Etched Radiator Fan grills (roof) Full front end wire handrails, plus wire handrails for cab doors This makes the model the best representation of a split head code 37/0 to date. All proceeds from the model will go towards the restoration of 37 003 to mainline standards. 37 003 is currently undergoing maintenance at the Mid-Norfolk Railway in Dereham, Norfolk. Ian Apologies to mods if in wrong section Link to post Share on other sites More sharing options...
GaryHN Posted April 6, 2010 Share Posted April 6, 2010 I really like the look of this model, But no option on the webpage or contact back about ordering from overseas. So looks like If I want one will have to wait for rip off ebay sellers. Gary in Aus Link to post Share on other sites More sharing options...
The Black Hat Posted April 7, 2010 Share Posted April 7, 2010 Any idea when this is due, or when payment is needed to be taken? Link to post Share on other sites More sharing options...
Guest 47107 Posted April 7, 2010 Share Posted April 7, 2010 Clicking on the Cl37Lg link above states that delivery is due Nov/Dec and that notification of final payment will be a month before delivery. Link to post Share on other sites More sharing options...
JamesB 34067 Posted December 4, 2010 Share Posted December 4, 2010 Sorry to bring back up an old post but saving starting a new one I was wondering if anyone knows whats happening to these now will they still be delivered this month?? ?? Regards James Link to post Share on other sites More sharing options...
class"66" Posted December 4, 2010 Share Posted December 4, 2010 Looks very nice model..... Link to post Share on other sites More sharing options...
Southernman46 Posted December 4, 2010 Share Posted December 4, 2010 Sorry to bring back up an old post but saving starting a new one I was wondering if anyone knows whats happening to these now will they still be delivered this month?? ?? Regards James CL37LG web-site say delivery around March 2011 - looks very very nice indeed Link to post Share on other sites More sharing options...
JamesB 34067 Posted December 5, 2010 Share Posted December 5, 2010 At last its been updated shame its due march 2011 but that flyby but what a model it is and I can have two snowploughs fitted each side off the coupling too if I wish , im also glad i ordered it in october , James Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.