Jump to content
 

Recommended Posts

Good morning, after some stop and starting on the main lines, I’ve decided to start work on the Colliery Yard, the first two sidings at first as some more points are required as well as track pins and fish plates. 
The siding nearest to the shed with the 3x 16ton mineral wagons on is to form a loop so the Coal Board engines can run around their train. This is made up of Peco Flexi-track while the two sidings to the rear of the water tower are peco set track lengths.

More updates to follow when some more parts have been acquired.EB3A7C01-44E3-4456-9C13-3EC42EF26DDB.jpeg.af2613c4a310d433011be60d751b2273.jpeg

Edited by Quarry-Steam65
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...