RMweb Gold johndon Posted November 25, 2021 RMweb Gold Share Posted November 25, 2021 This may end up being a computer control topic rather than a DCC question per-se but I figured I'd ask here first... I'm involved with a large layout, controlled via NCE Power Cabs (wireless) that has a 14 road fiddle yard that is around 20' long. Each road in the fiddle yard has at least 2 trains in it and route selection through the fiddle yard is through JMRI via MERG CBUS. Question is, when a train leaves a fiddle yard road, is there a way to automatically move the train behind it up to the end of the road filling the space left by the departed train so there is a gap behind it for the departed train to return to once it had completed it's lap round the layout? John Link to post Share on other sites More sharing options...
WIMorrison Posted November 25, 2021 Share Posted November 25, 2021 I think you need to ask this question on a JMRI forum and not RMWeb Link to post Share on other sites More sharing options...
RMweb Gold johndon Posted November 25, 2021 Author RMweb Gold Share Posted November 25, 2021 5 minutes ago, WIMorrison said: I think you need to ask this question on a JMRI forum and not RMWeb You'll have to pardon my ignorance but why? As I mentioned the JMRI is used for route selection (i.e. turnout control) through the fiddle yard via MERG which is a completely separate system from the DCC control of the trains... Link to post Share on other sites More sharing options...
WIMorrison Posted November 25, 2021 Share Posted November 25, 2021 Because it would be JMRI that you would use to shift the trains, using its computer control capabilities Link to post Share on other sites More sharing options...
RMweb Gold johndon Posted November 25, 2021 Author RMweb Gold Share Posted November 25, 2021 (edited) Ah, OK, so JMRI could, potentially, be used to shuffle the trains automatically whilst the NCE system was used, at the same time, to 'drive' the other trains? Edited November 25, 2021 by johndon Link to post Share on other sites More sharing options...
WIMorrison Posted November 25, 2021 Share Posted November 25, 2021 1 Link to post Share on other sites More sharing options...
RMweb Gold johndon Posted November 25, 2021 Author RMweb Gold Share Posted November 25, 2021 Thank you, I'll head over to a JMRI forum Link to post Share on other sites More sharing options...
Nigelcliffe Posted November 26, 2021 Share Posted November 26, 2021 (edited) In the general case, its really tricky to do. You need to know the address of the train at the back of each road (which changes depending which train it is). And then the system controls that train to move it forwards. Because you're using an NCE system, you can't use RailCom to identify the locomotives, so identification has to be another way (RFID might work as an option, just prior to entry to the fiddle yard). If you have really good train tracking through the layout, then you could work from the starting positions and use JMRI to track the trains around the layout, so knows which train is where, but that depends on the amount of block-detection you have in place and its reliability. There is a specific case which is simpler; if all decoders support Asymmetric DCC Braking (ABC - that means ESU, Zimo, Lenz, and a handful of others). Then could use ABC brake modules to stop the train because the block ahead is occupied, and then release them to move forwards and stop them again. To use it, the operators don't stop the trains, but just let them run into the fiddle yard and rely on the ABC braking to stop them at the correct places. - Nigel Edited November 26, 2021 by Nigelcliffe Link to post Share on other sites More sharing options...
Gordon A Posted November 26, 2021 Share Posted November 26, 2021 Look at Clutton. Tim Venton devised a system for automatically moving trains up in a storage yard loop. All the locos in one loop were programmed with the same number, which in Clutton's case was the number of the loop. Realistic top speeds were programmed in the locomotive's chip. This meant that when operating storage loops with more than one train, the departing train was driven at full speed out, which gave enough power for the remaining trains to shuffle up. I think Tim used JMRI for the route selection. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now