Jump to content
 

Blog- Southern Electric workbench - More 2-Bil progress


RSS Fetcher

Recommended Posts

I've left the roof for now and have done some work on the underframe. The truss rods are from NNK and are much better than the kit's crude plastic mouldings or trying to make these out of L section brass. They are preformed and solder up in a couple of minutes.

 

They are designed as a complete unit (presumably to fit the chassis of their own EMU kits), but as this made tem too wide for my chassis I removed the central section before glueing them in place.

 

blogentry-1187-12576277703462_thumb.jpg

 

 

The underframe castings I'm using are Branchlines, or at least came in their packet. They are a bit crude - far cruder than other Branchlines castings I've seen, so I'm wondering if they are actually Phoenix. As you can see from the photo below, they need a fair bit of cleaning up as the moulds were pretty worn and the two halves out of alignment.

 

blogentry-1187-12576278979537.jpg

 

One oddity is that the castings include some V hangers. The preserved unit at Shildon has these, but they aren't shown on any of the drawings I've got and I've not spotted any in photos of the units in service. I'm wondering if the preserved unit has been modified at some point whilst it was still operational - more research is needed in to the underframe gear.

 

View the full article

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...