RSS Fetcher Posted August 23, 2014 Share Posted August 23, 2014 I chose Tortoise operating mechanisms and so far they seem to operate very well. My preferred method of operating is a crank above and below trackbed using rod and tube. Tie bars are the American system of PTFE tubing as supplied by C&L. Plain track 60` sections have four wire droppers connected to a bus-bar under trackbed. which proved themselves when I added DCC. The bridge at the north end of Cole had to be fitted into trackway before tracklaying. The problem with using steel rail in trackwork is often rust. But I seem to have solved this by spraying the track with rust proof primer from Phoenix/Precision range and then further spraying with sleeper grime. Attached thumbnail(s) View the full article Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.