I chose Tortoise operating mechanisms and so far they seem to operate very well.

 

 

 

My preferred method of operating is a crank above and below trackbed using rod and tube.

 

 

 

 

Tie bars are the American system of PTFE tubing as supplied by C&L.

 

 

 

Plain track 60` sections have four wire droppers connected to a bus-bar under trackbed. which proved themselves when I added DCC.

 

 

 

The bridge at the north end of Cole had to be fitted into trackway before tracklaying.

 

 

 

 

 

 

 

 

 

 

 

 

The problem with using steel rail in trackwork is often rust. But I seem to have solved this by spraying the track with rust proof primer from Phoenix/Precision range and then further spraying with sleeper grime.

 

 

Attached thumbnail(s)
  • blogentry-17779-0-67034500-1408818996_th
  • blogentry-17779-0-18657800-1408819087_th
  • blogentry-17779-0-42930900-1408819177.jp
  • blogentry-17779-0-03319700-1408819228_th
  • blogentry-17779-0-17431400-1408819321_th
  • blogentry-17779-0-75327200-1408819481_th
  • blogentry-17779-0-39281500-1408819562_th
  • blogentry-17779-0-28165800-1408819818_th
  • blogentry-17779-0-43755800-1408819861_th
  • blogentry-17779-0-43559400-1408819887_th
  • blogentry-17779-0-30010700-1408820041_th

 

View the full article

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...