Work moves on slowly!   I've bought five sheets of XPS foam which I will glue/laminate to make the baseboard before wrapping them in MDF to protect the edges.   I've also bought an SAS2-IR Shuttle from BLOCKsignalling. My plan is to wire up the bottom line and into the station (on the right) so I can leave it running on its own and have a separate loom to power things if I want to play...   Next job is to cut and glue down the cork trackbed - any suggestions on whic
    • Like
    1