Well it is about time that something was said about my effort in the challenge! I had been planning Sutton Dock before I had even seen what the challenge was all about but as the size seems to fit the rules, I am going to put it forward.   Work has now started and the main baseboard and some of the points have been built. The layout is due to be shown at EXPO EM at Bracknell in May 2010 so I have a little tighter deadline than most entries!   Inspired by various dock/quay layouts I have seen