  1. Work continues at a pace at the Coleford  Junction end of the Tarka line. The whole line from Crediton is closed until 19/4/21. The old bridge is ready to be replaced by the new one that was constructed last year. Today a practice run is taking place with the new bridge moving alongside the old one and jacked up to the same level. After this the track will be removed and the old bridge removed on Monday or Tuesday. The new bridge should be put in place next Friday. So for a while the Tarka line will be cut off from the rest of the network! I hope to post further pictures as the work progresses.

    F2E8403C-728E-45F1-9468-A2C8AB6EE4BF.jpeg

    • Like 8
    • Informative/Useful 3
  2. Work has come to a halt today because of the health risk to the workforce, which was planned to be 50+ at the weekend. The project will be delayed by at least six months maybe longer. We now have the surreal sight of the completed replacement bridge sitting in a field in front of our home and remaining there for a long time.

    4DD6A4EB-E20E-4138-874B-FE5A0E9EEDF5.jpeg

    • Friendly/supportive 3
  3. The original bridge at Penstone (near Coleford Junction) is being replaced at the end of March. The Tarka line will be closed whilst this and other work takes place including the extension of Eggesford platforms. Today the first sections of the new bridge arrived at the work site next to the line. The bridge will be assembled here and raised up into position. I will post further pics when this happens.

    BCB988B5-1AEA-4915-990C-05D077606976.jpeg

    5D247502-CC06-4A38-BFB3-FCB023CE27FD.jpeg