Jump to content
 

aBReal

Members
  • Posts

    38
  • Joined

  • Last visited

Posts posted by aBReal

  1. Hi Dave, thanks very much.

     

    I think you were right the first time - the sighting patch is for the old MR lower quadrant post which predated the LMS bracket, which was positioned so the signal was above the bridge level, as Dave F's photo shows:

     

    attachicon.gifDave-F-post-17640-0-88441400-1384940846.jpg

     

    Cheers,

     

    Al.

    Is that remains of a second platform in the right hand corner of the picture?

  2. Still here....

    Been sorting this coach - all the glazing came unglued, so had to open it up ( nightmare, couldn't get screws out ) and sort it. Gave it a blast of frame dirt as well.

     

    attachicon.gifimage.jpeg

     

    Most of my time has gone into wrestling with a bridge design for the scenic break, and it's still not finished.

     

    I'll be prioritising 31415 next. I'm not allowed to start any new projects till I get some finished

    What a pain! 

    The underframe is looking good

  3. Hi Alfie, welcome to the forum, I'm certainly jealous of you, I live 300 miles north of Minehead (adds to the holiday resort feeling!). Regarding the track it is all SMP which, if I'm honest, looks really nice but for me is very high maintenance (I've nearly always got my soldering iron out adjusting points although they're nearly there now). Personally if I was going to do Minehead again I'd use peco 75 points with C&L thicker based track or wait for the Peco or DCC Concepts bullhead track system to come out as I chose SMP before any of it was announced (typical!). SMP can give you good results though just be prepared to put the time in,

     

    Gary

    Aha, thanks for the help. Still feels like a holiday although its near to normal with the sun and the sea! Never gets old ;)

    • Like 1
×
×
  • Create New...