Jump to content
 

sanddman54

Members
  • Posts

    5
  • Joined

  • Last visited

Posts posted by sanddman54

  1. I have the SR Engine Workings book. It does cover Bournemouth shed diagrams but it's unclear if it covers all of them.

     

    A better source of operational material is "BR Operating History - SR Part 3" by Xpress Books. There are several paras devoted to ECS pilot work at Bomo W. ECS was generally propelled into the station by either the pilot or the train engine; heavy trains were drawn in by the pilot which would then provide banking assistance to the platform end. For departing ECS, propelling stock was forbidden so the M7 pilot would attach to the rear and draw up to 12 ECS (the station limit), with assistance from the train engine as far as the platform end. 

    It may have been forbidden but I have photographic evidence that appears to show it did. For example at about 2 mins into Memories Of The Somerset And Dorset by Branchline Video, 2P 40563 can be seen backing out a 3 coach Bullied set towards the carriage sidings.

    • Like 1
×
×
  • Create New...