Jump to content
 

Yooski

Members
  • Posts

    12
  • Joined

  • Last visited

Posts posted by Yooski

  1. Good Evening All!

    I was wondering if anyone knows about the signalling within steels works - for instance, Scunthorpe or Port Talbot? 
    Do they use 3 aspect signals? ground position lights? specialist signals?

     

    Any information regarding signalling would be useful - including in and out of exchange sidings! 

     

    Thanks in advance!

  2. Hello Everyone,

     

    I was wondering when a mainline has bi-directional signalling as a redundancy (so not used all of the time) what signals are placed on the "wrong running line" facing the wrong way and are the signal distances the same?

     

    For instance does the wrong running line have ground signals or 3 aspect signals or normal 4 aspect signals?

     

    Just looking for inspiration and a reason to run trains on the wrong track either direction :)

  3. Hello,

     

    I was wondering if anyone knows if there is a cross-sectional image of one of london undergrounds deep tunnel lines, with accurate measurements for the diameter of the tunnel, track bed height, rail height etc?

    I have been pulling my hairout but all i have managed to fine so far is these but it is just a structure gauge and not the actual tunnel! argh!tunnel_dimensions_cast_iron_tunnel.jpg

     

    Any help would be greatly appreciated!

    • Like 1
×
×
  • Create New...