Tide coming in ,in the picture. Try to get a copy of MRJ246 for layout write up with a description of how the tide works, got my copy off Ebay. Buckets, piping and a sort of drip feed, there's even a sealed baseboard joint. A small leak, well drip really, occured but from a poor bucket to pipe joint. Operaters must remember to alter the clock for tides.
Yes, that was the one I was thinking of, I think they add something to the water...glycerine?
Real running river on a layout? Possible?
in Modelling Questions, Help and Tips
Posted
Yes, that was the one I was thinking of, I think they add something to the water...glycerine?