Jump to content
 

Caterham7

Members
  • Posts

    5
  • Joined

  • Last visited

Posts posted by Caterham7

  1. Thanks for all the replies - and suggestions. Most helpful.

     

    My working area is 3.8m x 2.6m.

     

    The plan is to have Tintern Station on one long side, compressed a bit to use the Brockweir bridge and the Tintern Tunnel as 'scenic breaks'.

     

    Then on the two shorter lengths I plan to build Tintern Quarry on one board and the Wireworks on the other.

     

    As far as traffic is concerned my thoughts are that - taking liberty with time periods, I have two industrial sites to generate traffic plus the draw of the tourism to generate many train movements in the 'Summer' which is when the layout will be set. If I wanted to really stretch fact to fiction I could introduce LMS trains as they operated in the adjacent valley (Blaenavon) and could possibly have secured running rights to Tintern for northbound traffic.

     

    Once I've worked out the track plan I'll post it here.

     

     

    • Like 3
×
×
  • Create New...