Jump to content
 

Fallen Flag

Moderated Status
  • Posts

    3
  • Joined

  • Last visited

Posts posted by Fallen Flag

  1. A section of brick work form the GVT booking office at Chirk, the building foundations are three bricks thick, on the front and side elevations and two bricks thick on the rear elevation.

    Next week, on the 16th to 19th September the Glyn Valley Tramway Trust is planning to continue the restoration of the GVT station with a four day working party that will hopefully see more of the track-bed uncovered..  

    GVTT 08.09.2021 (3).jpg

    GVTT Chirk 08.09.2021 (1).jpg

×
×
  • Create New...