Johnny Rock
Members-
Posts
73 -
Joined
-
Last visited
Recent Profile Visitors
The recent visitors block is disabled and is not being shown to other users.
Johnny Rock's Achievements
63
Reputation
-
My layout Kirkby St John is based on the prototype plan of Kirkby Stephen West on the Settle to Carlisle line in the 1930s to 40s. Some adaptation has been made to allow for the area available to work in. The layout is in a converted garage. Layout dimensions 13 feet by 9. Began three years ago in still in construction.
-
Same problem here with wheels riding up at frogs and switch rails on my double and single slips. The advice here is good. Pick ups set too low. I'll try to move the pickups upwards slightly to eradicate fouling.
-
Stencil versus "road sign" speed restriction signs
Johnny Rock replied to eastwestdivide's topic in UK Prototype Questions
These posts are very helpful thanks. I'm building a Settle and Carlisle layout based in the 1930/40s. I've seen a couple of cab ride videos showing some of the stencil speed markers but as these videos were taken in the 60s the signs were yellow. I have bought some brass ones for the layout which look really good and thought I'd add a couple to the layout tracks. It looks as if they were sited about 100 yards ahead and on the left hand side of the track. -
Stencil versus "road sign" speed restriction signs
Johnny Rock replied to eastwestdivide's topic in UK Prototype Questions
I've read somewhere that the stencil type speed signs were painted white before BR days. They were then painted yellow to improve visibility. Before the introduction of road type signs. Does anyone know if this is correct? -
How far between Telegraph poles
Johnny Rock replied to gwrman's topic in Modelling Questions, Help and Tips
I'm exploring the same idea. I've read recently that the distance was between 90 and 110 feet. 110 x 4mm gives a scale distance of 44 cms. To the eye on my layout this seems about right. -
Platform end water columns
Johnny Rock replied to snowy1051's topic in Modelling Questions, Help and Tips
Take a look at this image from Appleby Station posted om https://scrca.foscl.org.uk/location-types/water-crane -
This is all excellent background information. I've bought 4 Dapol motorised signals which, as a compromise both aesthetically and operationally, will be sited as follows. 1. Up home signal at the exit of the goods yard , this serves as a starter for the up platform. 2. Down home signal set before entering the down platform. 3. Down starter signal at North end of down platform before the overbridge (a la Dent ) 4. Up home signal the opposite side of the North overbridge. Having viewed many other photos, the routes from goods sidings and lay by will use ground disc signals.
-
Yes thank you this makes alot of sense. My layout is based in the 1930/40s therefore I suspect they were changed around or before this time. I now plan to site the home down next to the down layby just before the station platform and a starter just after the station, before the over bridge. I also notice that a home up starter was positioned much further along the track past the goods shed. Presumably again for sight lines as the whole area is on a curve.