Jump to content
 

ryanstewart2003

Members
  • Posts

    3
  • Joined

  • Last visited

Posts posted by ryanstewart2003

  1. Hello! I'm getting to the Signaling part of my layout and I'm stumped. After looking at a few threads I was starting to get it, but I think I need the opinions of people who know what they're talking about. I have attached a (admittedly terrible, as the track planning system I was using wasn't cooperating) diagram of the layout as it isn't fit for eyes. I'll accept the criticisms to it, but in short it's a shrunken down attempt at a GWR branchline terminus. I was wondering what, if any, signals I may have to put in?

    snapshot.png.eb45f8065bf5e0f83f0c7f33b5906700.png

    Thanks,

     

    Ryan

    • Friendly/supportive 1
×
×
  • Create New...